|
|
STS-101 crew heads for Astro
| Title |
STS-101 crew heads for Astrovan and trip to launch pad |
| Description |
The STS-101 crew show their joy and eagerness to begin their mission as they had to the Astrovan for the trip to Launch Pad 39A and the fourth attempt at launch of Space Shuttle Atlantis. In their orange launch and entry suits, they are (left to right) Mission Specialists Susan J. Helms, Yury Usachev of Russia, James S. Voss, Mary Ellen Weber, Jeffrey N. Williams, Pilot Scott "Doc" Horowitz, and Commander James D. Halsell Jr. The mission will take the crew to the International Space Station to deliver logistics and supplies and to prepare the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk and will reboost the space station from 230 statute miles to 250 statute miles. This will be the third assembly flight to the Space Station. Liftoff of Space Shuttle Atlantis for the 10-day mission is scheduled for about 6:11 a.m. EDT from Launch Pad 39A. Landing is targeted for May 29 at 2:19 a.m. EDT. |
| Date |
05.19.2000 |
|
STS-101 Mission Specialist U
| Title |
STS-101 Mission Specialist Usachev during suitup in the O&C |
| Description |
STS-101 Mission Specialist Yury Usachev of Russia smiles and waves as he is helped with adjustments on his launch and entry suit. Usachev and the rest of the crew will be heading to Launch Pad 39A for the fourth attempt at launch of Space Shuttle Atlantis. The mission will take the crew to the International Space Station to deliver logistics and supplies and to prepare the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk and will reboost the space station from 230 statute miles to 250 statute miles. This will be the third assembly flight to the Space Station. Liftoff of Space Shuttle Atlantis for the 10-day mission is scheduled for about 6:11 a.m. EDT from Launch Pad 39A. Landing is targeted for May 29 at 2:19 a.m. EDT. |
| Date |
05.19.2000 |
|
STS-102 crew exits O&C for c
| Title |
STS-102 crew exits O&C for countdown at Launch Pad 39B during TCDT |
| Description |
KENNEDY SPACE CENTER, Fla. -- The STS-102 crew heads to the silver Astrovan after leaving the Operations and Checkout Building. In front are Mission Specialist Yury Usachev (left) and Commander James Wetherbee, second are Mission Specialist Susan Helms and Pilot James Kelly, third, Mission Specialists James Voss and Andrew Thomas, and last, Mission Specialist Paul Richards. Voss, Helms and Usachev are the Expedition Two crew, going to the International Space Station for their four-month rotation. The Astrovan will take the crew to Launch Pad 39B for a simulated countdown, part of Terminal Countdown Demonstration Test activities. STS-102 is the eighth construction flight to the Space Station, with Space Shuttle Discovery carrying the Multi-Purpose Logistics Module Leonardo. In addition, Expedition One will return to Earth with Discovery. Launch on mission STS-102 is scheduled for March 8. |
| Date |
02.15.2001 |
|
STS-102 crew exits O&C for c
| Title |
STS-102 crew exits O&C for countdown at Launch Pad 39B during TCDT |
| Description |
KENNEDY SPACE CENTER, Fla. -- The STS-102 crew heads to the silver Astrovan after leaving the Operations and Checkout Building. In front, left to right, are Mission Specialists Paul Richards, James Voss, Susan Helms and Yury Usachev. Behind then are Mission Specialist Andrew Thomas, Pilot James Kelly and Commander James Wetherbee. Voss, Helms and Usachev are the Expedition Two crew, going to the International Space Station for their four-month rotation. The Astrovan will take the crew to Launch Pad 39B for a simulated countdown, part of Terminal Countdown Demonstration Test activities. STS-102 is the eighth construction flight to the Space Station, with Space Shuttle Discovery carrying the Multi-Purpose Logistics Module Leonardo. In addition, Expedition One will return to Earth with Discovery. Launch on mission STS-102 is scheduled for March 8. |
| Date |
02.15.2001 |
|
Usachev and Lonchakov in Zve
johnsonspacecentermediaarchi
Expedition Two Mission Comma
sts100-338-026
| mediatype |
IMAGE |
| mediatype |
image |
| date |
04/23/01 |
| creator |
NASA |
| identifier |
sts100-338-026 |
|
The STS-100 and Expedition T
johnsonspacecentermediaarchi
The STS-100 and Expedition T
sts100-341-003
| mediatype |
IMAGE |
| mediatype |
image |
| creator |
NASA |
| identifier |
sts100-341-003 |
|
| General Description |
STS-102 Shuttle Mission Imagery |
|
| General Description |
STS-102 Shuttle Mission Imagery |
|
| General Description |
STS-101 Shuttle Mission Imagery |
|
Bill Shepherd, commander of
| Description |
Bill Shepherd, commander of the International Space Station?s Expedition One crew who returned to Earth aboard Discovery, responds to a question during an interview. . The interview was held in the suitup room of the astronauts? quarters in the Operations and Checkout Building upon the crew?s return after landing. Discovery returned from mission STS-102, landing at KSC March 21. Part of the STS-102 mission was to take the Expedition Two crew to the Space Station and exchange crews. Shepherd handed over command to cosmonaut Yury Usachev, who will reside on the Station for the next four months with astronauts Susan Helms and James Voss |
| Release Date |
03/21/2001 |
|
Following a post-landing int
| Description |
Following a post-landing interview in the Operations and Checkout Building about his stay as commander on the International Space Station and return to Earth aboard Discovery, Bill Shepherd joins his wife. Part of the STS-102 mission was to take the Expedition Two crew to the Space Station and exchange crews. Shepherd handed over command to cosmonaut Yury Usachev, who will reside on the Station for the next four months with astronauts Susan Helms and James Voss |
| Release Date |
03/21/2001 |
|
Astronaut James Voss (right)
| Description |
Astronaut James Voss (right) stands with astronaut John Young on the tarmac at the KSC Shuttle Landing Facility. Voss is flying on mission STS-102, launching March 8, as part of the Expedition Two crew going to the International Space Station. Young made his fifth flight as Spacecraft Commander of STS-1, the first flight of the Space Shuttle, April 12-14, 1981. His sixth and final flight was as Spacecraft Commander of STS-9, the first Spacelab mission, Nov. 28-Dec. 8, 1983. The other members of the Expedition Two crew are Susan Helms and Yury Usachev. STS-102 will be Helms? and Voss?s fifth Shuttle flight, and Usachev?s second. They will be replacing the Expedition One crew (Bill Shepherd, Yuri Gidzenko and Sergei Krikalev), who will return to Earth March 20 on Discovery along with the STS-102 crew |
| Release Date |
01/31/2001 |
|
The three members of the Exp
| Description |
The three members of the Expedition Two crew arrive at KSC. Standing, left to right, are astronaut Susan Helms, cosmonaut Yury Usachev, and astronaut James Voss. They will be flying on mission STS-102 to the International Space Station, replacing the Expedition One crew, who will return to earth on Discovery. STS-102 will be Helms? and Voss?s fifth Shuttle flight, and Usachev?s second |
| Release Date |
01/31/2001 |
|
Following a post-landing int
| Description |
Following a post-landing interview about his stay as commander on the International Space Station and return to Earth, Bill Shepherd is joined by his wife. Shepherd and the rest of the Space Station?s first residential crew, Expedition One, returned aboard Discovery, ending mission STS-102. Part of the STS-102 mission was to take the Expedition Two crew to the Space Station and exchange crews. Shepherd handed over command to cosmonaut Yury Usachev, who will reside on the Station for the next four months with astronauts Susan Helms and James Voss |
| Release Date |
03/21/2001 |
|
Bill Shepherd is joined by h
| Description |
Bill Shepherd is joined by his wife following a post-landing interview in the Operations and Checkout Building about his stay as commander on the International Space Station and return to Earth aboard Discovery. Discovery returned from mission STS-102, landing at KSC March 21. Part of the STS-102 mission was to take the Expedition Two crew to the Space Station and exchange crews. Shepherd handed over command to cosmonaut Yury Usachev, who will reside on the Station for the next four months with astronauts Susan Helms and James Voss |
| Release Date |
03/21/2001 |
|
Bill Shepherd looks at launc
| Description |
Bill Shepherd looks at launch photos following a post-landing interview in the Operations and Checkout Building about his stay as commander on the International Space Station and return to Earth aboard Discovery. Discovery returned from mission STS-102, landing at KSC March 21. Part of the STS-102 mission was to take the Expedition Two crew to the Space Station and exchange crews. Shepherd handed over command to cosmonaut Yury Usachev, who will reside on the Station for the next four months with astronauts Susan Helms and James Voss |
| Release Date |
03/21/2001 |
|
(Nikon D1 Test) The STS-101
| Description |
(Nikon D1 Test) The STS-101 crew wave to onlookers as they leave the Operations and Checkout Building enroute for the second time to Launch Pad 39A and another attempt at liftoff of Space Shuttle Atlantis. In their orange launch and entry suits, they are (front line) Pilot Scott J. Horowitz and Commander James D. Halsell Jr., (second line) Mission Specialists Mary Ellen Weber and Jeffrey N. Williams, and (third line) Mission Specialists Susan J. Helms, Yury Usachev of Russia and James S. Voss The first attempt on April 24 was scrubbed due to unfavorable weather conditions. The mission will take the crew to the International Space Station to deliver logistics and supplies and to prepare the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk. This will be the third assembly flight to the Space Station. Liftoff is targeted for 3:52 p.m. EDT. The mission is expected to last about 10 days, with Atlantis landing at KSC Saturday, May 6, about 11:53 a.m. EDT |
| Release Date |
04/25/2000 |
|
KENNEDY SPACE CENTER, Fla. -
| Description |
KENNEDY SPACE CENTER, Fla. -- At the 195-foot level of the Fixed Service Structure on Launch Pad 39A, the STS-101 crew take part in training during a Terminal Countdown Demonstration Test (TCDT). Activities during TCDT include emergency egress from the orbiter and a dress rehearsal for launch. Standing left to right are Pilot Scott Horowitz, Jeffrey Williams, Commander James Halsell, and Mission Specialists Yury Usachev, James Voss, Mary Ellen Weber, and Susan Helms. At right is trainer Capt. George Hoggard of the KSC/CCAS Fire Department. Not seen in the photo is Pilot Scott Horowitz. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A |
| Release Date |
04/06/2000 |
|
KENNEDY SPACE CENTER, Fla. -
| Description |
KENNEDY SPACE CENTER, Fla. -- At the 195-foot level of the Fixed Service Structure on Launch Pad 39A, the STS-101 crew get instruction in emergency egress in a slidewire basket during a Terminal Countdown Demonstration Test (TCDT). From left are Mission Specialist Yury Usachev and Susan Helms, Commander James Halsell, Mission Specialists James Voss, Mary Ellen Weber standing behind Jeffrey Williams, and Pilot Scott Horowitz. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A |
| Release Date |
04/06/2000 |
|
The STS-101 crew pose in the
| Description |
The STS-101 crew pose in the White Room outside Space Shuttle Atlantis behind them. In the front row are Pilot Scott Horowitz and Mission Specialists Yury Usachev and Susan Helms. In the back row are Mission Specialists Mary Ellen Weber and Jeffrey Williams, Commander James Halsell, and Mission Specialist James Voss. The crew are at KSC to take part in Terminal Countdown Demonstration Test (TCDT) activities that include emergency egress training from the orbiter and a dress rehearsal for launch. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A |
| Release Date |
04/06/2000 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- Posing on the tarmac at the Shuttle Landing Facility after their arrival aboard T-38 jets (in the background) are STS-101 Mission Specialists James Voss, Susan Helms and Yury Usachev. They and the rest of the crew are at KSC to take part in Terminal Countdown Demonstration Test (TCDT) activities that include emergency egress training and a dress rehearsal for launch. The other crew members are Commander James Halsell, Pilot Scott Horowitz, and Mission Specialists Mary Ellen Weber and Jeffrey Williams. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A |
| Release Date |
04/05/2000 |
|
KENNEDY SPACE CENTER, Fla. -
| Description |
KENNEDY SPACE CENTER, Fla. -- After Terminal Countdown Demonstration Test (TCDT) activities at Launch Pad 39A, the STS-101 crew answers questions from the media. From left to right are moderator George Diller, with NASA Public Affairs, Commander James D. Halsell Jr., Pilot Scott J. "Doc" Horowitz and Mission Specialists Mary Ellen Weber, Jeffrey N. Williams, James S. Voss, Susan J. Helms and Yury Usachev of Russia, with the microphone. The TCDT includes emergency egress training and a simulated launch countdown. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A |
| Release Date |
04/06/2000 |
|
KENNEDY SPACE CENTER, Fla. -
| Description |
KENNEDY SPACE CENTER, Fla. -- After Terminal Countdown Demonstration Test (TCDT) activities at Launch Pad 39A, the STS-101 crew talk to the media. At the microphone is Commander James D. Halsell Jr. Next to him, standing left to right, are Pilot Scott J. "Doc" Horowitz and Mission Specialists Mary Ellen Weber, Jeffrey N. Williams, James Voss, Susan J. Helms and Yury Usachev of Russia. The TCDT includes emergency egress training and a simulated launch countdown. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A |
| Release Date |
04/06/2000 |
|
KENNEDY SPACE CENTER, Fla. -
| Description |
KENNEDY SPACE CENTER, Fla. -- After Terminal Countdown Demonstration Test (TCDT) activities at Launch Pad 39A, the STS-101 crew talk to the media. At the far left is George Diller, with NASA Public Affairs, who is moderating the event. At the microphone Commander James D. Halsell Jr. answers a question. Next to him, standing left to right, are Pilot Scott J. "Doc" Horowitz and Mission Specialists Mary Ellen Weber, Jeffrey N. Williams, James Voss, Susan J. Helms and Yury Usachev of Russia. The TCDT includes emergency egress training and a simulated launch countdown. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A |
| Release Date |
04/06/2000 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- The STS-101 crew poses on the tarmac at the Shuttle Landing Facility after arriving to take part in a Terminal Countdown Demonstration Test (TCDT). The two days of activities include emergency egress training and a dress rehearsal for launch. Standing left to right are Mission Specialist Susan Helms, Commander James Halsell, Pilot Scott Horowitz, and Mission Speciaists Jeffrey Williams, James Voss, Yury Usachev and Mary Ellen Weber. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A |
| Release Date |
04/05/2000 |
|
The STS-101 crew wave at onl
| Description |
The STS-101 crew wave at onlookers as they walk from the Operations and Checkout Building to the Astrovan, which will take them to Space Shuttle Atlantis on Launch Pad 39A for a simulated countdown exercise. Leading the way are (left) Pilot Scott J. "Doc" Horowitz and (right) Commander James D. Halsell Jr. In the second row are Mission Specialists (left) Mary Ellen Weber and (right) Jeffrey N. Williams. In the third row are Mission Specialists (left) James Voss, (waving) Susan J. Helms, and (right) Yury Usachev of Russia. The dress rehearsal for launch is part of Terminal Countdown Demonstration Test (TCDT) activities that include emergency egress training and familiarization with the payload. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A |
| Release Date |
04/07/2000 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- At the Shuttle Landing Facility, STS-101 Commander James Halsell waves to the media as he and other crew members cross the tarmac to a waiting bus. At right is a film crew, in the foreground at left is Delores Green, flight crew support specialist lead for the astronaut crew quarters. Other crew members in the background are Mission Specialist Jeffrey Williams, Pilot Scott Horowitz, and Mission Specialists Mary Ellen Weber and Yury Usachev. Not visible in the photo is Mission Specialist Susan Helms. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A |
| Release Date |
04/05/2000 |
|
Inside the White Room at Lau
| Description |
Inside the White Room at Launch Pad 39A, the STS-101 crew take part in training during a Terminal Countdown Demonstration Test (TCDT). Activities during TCDT include emergency egress from the orbiter and a dress rehearsal for launch. Standing left to right are Pilot Scott Horowitz, Mission Specialists Mary Ellen Weber, Yury Usachev and Jeffrey Williams, Commander James Halsell, and Mission Specialists James Voss and Susan Helms. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A |
| Release Date |
04/06/2000 |
|
KENNEDY SPACE CENTER, Fla. -
| Description |
KENNEDY SPACE CENTER, Fla. -- During emergency egress training at Launch pad 39A, STS-101 Mission Specialists Jeffrey N. Williams and Mary Ellen Weber, Pilot Scott J. "Doc" Horowitz and Commander James D. Halsell Jr. get instruction on using the slidewire basket. The basket would be used in the event the crew needed to exit quickly from the fixed service structure at the 195-foot level. The training is part of Terminal Countdown Demonstration Test (TCDT) activities that include a simulated launch countdown and familiarization with the payload. Others taking part in the TCDT are Mission Specialists James Voss, Susan J. Helms and Yury Usachev of Russia. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A |
| Release Date |
04/06/2000 |
|
KENNEDY SPACE CENTER, Fla. -
| Description |
KENNEDY SPACE CENTER, Fla. -- During emergency egress training at Launch pad 39A, STS-101 Mission Specialists James Voss, Yury Usachev of Russia, and Susan J. Helms test the slidewire basket that they would use if needed to exit quickly from the fixed service structure at the 195-foot level. The training is part of Terminal Countdown Demonstration Test (TCDT) activities that include a simulated launch countdown and familiarization with the payload. Others taking part in the TCDT are Commander James D. Halsell Jr., Pilot Scott J. "Doc" Horowitz, and Mission Specialists Mary Ellen Weber and Jeffrey N. Williams. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A |
| Release Date |
04/06/2000 |
|
STS-101 Mission Specialist J
| Description |
STS-101 Mission Specialist Jeffrey Williams arrives at KSC's Shuttle Landing Facility aboard a T-38 jet aircraft flown by STS-101 Pilot Scott Horowitz. They and the rest of the crew are at KSC to take part in Terminal Countdown Demonstration Test (TCDT) activities that include emergency egress training and a dress rehearsal for launch. The other crew members are Commander James Halsell and Mission Specialists Mary Ellen Weber, James Voss, Susan Helms and Yury Usachev. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A |
| Release Date |
04/05/2000 |
|
KENNEDY SPACE CENTER, Fla. -
| Description |
KENNEDY SPACE CENTER, Fla. -- During emergency egress training at Launch pad 39A, STS-101 Pilot Scott J. "Doc" Horowitz and Mission Specialist Yury Usachev stand in the slidewire basket at the landing zone. The Safety Egress officer (left on ground) provides training on use of the basket in the event the crew needed to exit quickly from the fixed service structure (background) at the 195-foot level. The rest of the crew, clockwise at right, are Commander James D. Halsell Jr. and Mission Specialists Jeffrey N. Williams, James Voss, Susan Helms, and (back to the camera) Mary Ellen Weber. The training is part of Terminal Countdown Demonstration Test (TCDT) activities that include a simulated launch countdown and familiarization with the payload. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A |
| Release Date |
04/06/2000 |
|
The STS-101 crew walk from t
| Description |
The STS-101 crew walk from the Operations and Checkout Building to the Astrovan, which will take them to Space Shuttle Atlantis on Launch Pad 39A for a simulated countdown exercise. Leading the way are (left) Pilot Scott J. "Doc" Horowitz and (right) Commander James D. Halsell Jr. In the second row are Mission Specialists (left) Mary Ellen Weber and (right) Jeffrey N. Williams. In the third row are Mission Specialists (left) James Voss, (waving) Susan J. Helms, and (right) Yury Usachev of Russia. The dress rehearsal for launch is part of Terminal Countdown Demonstration Test (TCDT) activities that include emergency egress training and familiarization with the payload. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A |
| Release Date |
04/07/2000 |
|
KENNEDY SPACE CENTER, Fla. -
| Description |
KENNEDY SPACE CENTER, Fla. -- During a break in their Terminal Countdown Demonstration Test (TCDT), the STS-101 crew poses in front of Space Shuttle Atlantis at Launch Pad 39A. Standing, left to right, are Mission Specialists Susan J. Helms and Yury Usachev of Russia, Pilot Scott J. "Doc" Horowitz, Commander James D. Halsell Jr., and Mission Specialists Mary Ellen Weber, James Voss and Jeffrey N. Williams. The TCDT includes emergency egress training and a simulated launch countdown. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A |
| Release Date |
04/06/2000 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- STS-101 Mission Specialist Yury Usachev crosses the tarmac at KSC's Shuttle Landing Facility after arriving aboard a T-38 jet aircraft piloted by astronaut Gus Loria (behind). Usachev and the the rest of the crew are at KSC to take part in Terminal Countdown Demonstration Test (TCDT) activities that include emergency egress training and a dress rehearsal for launch. The other crew members are Commander James Halsell, Pilot Scott Horowitz, and Mission Specialists Mary Ellen Weber, James Voss, and Jeffrey Williams. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A |
| Release Date |
04/05/2000 |
|
STS-101 Yury Usachev of Russ
| Description |
STS-101 Yury Usachev of Russia smiles on his arrival at KSC's Shuttle Landing Facility aboard the T-38 jet aircraft behind him. He and the rest of the crew are at KSC to get ready for their launch on April 24 about 4:15 p.m. EDT from Launch Pad 39A. The mission will take the crew to the International Space Station, delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station |
| Release Date |
04/21/2000 |
|
After arriving at the Shuttl
| Description |
After arriving at the Shuttle Landing Facility for their launch preparations, the STS-101 crew pauses to greet the media. At the microphone is Commander James Halsell. Next to him (left to right) are Pilot Scott "Doc" Horowitz and Mission Specialist Jeffrey Williams. Other crew members not shown are Mission Specialists Mary Ellen Weber, James Voss, Susan Helms and Yury Usachev of Russia. The mission will take the crew to the International Space Station, delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. Launch is targeted for April 24 at about 4:15 p.m. EDT from Launch Pad 39A |
| Release Date |
04/21/2000 |
|
After arriving at the Shuttl
| Description |
After arriving at the Shuttle Landing Facility for launch preparations, the STS-101 crew pauses to greet the media. At the microphone is Mission Specialist Yury Usachev of Russia. Behind him is Pilot Scott "Doc" Horowitz. Other crew members not shown are Commander James Halsell and Mission Specialists Mary Ellen Weber, James Voss, Jeffrey Williams and Susan Helms. The mission will take the crew to the International Space Station, delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. Launch is targeted for April 24 at about 4:15 p.m. EDT from Launch Pad 39A |
| Release Date |
04/21/2000 |
|
After arriving at the Shuttl
| Description |
After arriving at the Shuttle Landing Facility for launch preparations, the STS-101 crew pauses to greet the media. Standing (left to right) are Mission Specialists Susan Helms, James Voss, Yury Usachev of Russia and Mary Ellen Weber, Commander James Halsell, Pilot Scott "Doc" Horowitz, and Mission Specialist Jeffrey Williams. The mission will take the crew to the International Space Station, delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. Launch is targeted for April 24 at about 4:15 p.m. EDT from Launch Pad 39A |
| Release Date |
04/21/2000 |
|
The STS-101 crew is greeted
| Description |
The STS-101 crew is greeted by Center Director Roy Bridges and USAF Brig. Gen. Ron Sega, after the crew's arrival at the Shuttle Landing Facility to get ready for launch. Standing (left to right) on the tarmac are Mission Specialists Jeffrey Williams and Mary Ellen Weber, Pilot Scott "Doc" Horowitz, Commander James Halsell, Bridges and Gen. Sega. Other crew members not shown are Mission Specialists James Voss, Susan Helms and Yury Usachev of Russia. The mission will take the crew to the International Space Station, delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. Launch is targeted for April 24 at about 4:15 p.m. EDT from Launch Pad 39A |
| Release Date |
04/21/2000 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- STS-101 Mission Specialist Mary Ellen Weber takes her seat inside Space Shuttle Atlantis before taking part in a simulated launch countdown. The countdown is part of Terminal Countdown Demonstration Test (TCDT) activities that also include emergency egress training and familiarization with the payload. Other crew members taking part are Commander James D. Halsell Jr., Pilot Scott J. "Doc" Horowitz and Mission Specialists Mary Ellen Weber, James Voss, Jeffrey N. Williams, Susan Helms, and Yury Usachev of Russia. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A |
| Release Date |
04/07/2000 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- STS-101 Pilot Scott J. "Doc" Horowitz shows delight in taking his seat inside Space Shuttle Atlantis for a simulated launch countdown. The countdown is part of Terminal Countdown Demonstration Test (TCDT) activities that also include emergency egress training and familiarization with the payload. Other crew members taking part are Commander James D. Halsell Jr. and Mission Specialists Mary Ellen Weber, James Voss, Jeffrey N. Williams, Susan Helms, and Yury Usachev of Russia. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A |
| Release Date |
04/07/2000 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- STS-101 Commander James D. Halsell Jr. takes his seat inside Space Shuttle Atlantis for a simulated launch countdown. The countdown is part of Terminal Countdown Demonstration Test (TCDT) activities that also include emergency egress training and familiarization with the payload. Other crew members taking part are Pilot Scott J. "Doc" Horowitz and Mission Specialists Mary Ellen Weber, James Voss, Jeffrey N. Williams, Susan Helms, and Yury Usachev of Russia. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A |
| Release Date |
04/07/2000 |
|
KENNEDY SPACE CENTER, Fla. -
| Description |
KENNEDY SPACE CENTER, Fla. -- As part of Terminal Countdown Demonstration Test (TCDT) activities, STS-101 Mission Specialist Jeffrey N. Williams takes the driver seat in an M-113 personnel carrier during emergency egress training at Launch pad 39A. The TCDT also includes a simulated launch countdown and familiarization with the payload. Other crew members taking part are Commander James D. Halsell Jr., Pilot Scott J. "Doc" Horowitz and Mission Specialists Mary Ellen Weber James Voss, Susan Helms, and Yury Usachev of Russia. During their mission to the International Space Station, the STS-101 crew will be delivering logistics and supplies, plus preparing the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk to perform maintenance on the Space Station. This will be the third assembly flight for the Space Station. STS-101 is scheduled to launch April 24 at 4:15 p.m. from Launch Pad 39A |
| Release Date |
04/06/2000 |
|
In the Operations and Checko
| Description |
In the Operations and Checkout Building, the STS-101 crew gathers for a snack before suiting up for launch. From left are Mission Specialists Yury Usachev of Russia , Mary Ellen Weber and Jeffrey N. Williams, Commander James D. Halsell Jr., Pilot Scott J. Horowitz, and Mission Specialists James S. Voss and Susan J. Helms. The mission will take the crew to the International Space Station to deliver logistics and supplies and prepare the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk and will reboost the space station from 230 statute miles to 250 statute miles. This will be the third assembly flight to the Space Station. Liftoff of Space Shuttle Atlantis for the 10-day mission is scheduled for about 6:12 a.m. EDT from Launch Pad 39A. Landing is targeted for May 29 at 2:19 a.m. EDT |
| Release Date |
05/19/2000 |
|
|