|
|
STS-100 Crew Portrait
| Name of Image |
STS-100 Crew Portrait |
| Date of Image |
2001-03-01 |
| Full Description |
This is the official crew portrait of the STS-100 mission. Seated are astronauts Kent V. Rominger, (left) and Jeffrey S. Ashby, commander and pilot, respectively. Standing (from the left) are cosmonaut Yuri V. Lonchakov with astronauts Scott E. Parazynski, Umberto Guidoni of the European Space Agency, Chris A. Hadfield, and John L. Phillips, all mission specialists. The seven launched from the Kennedy Space Center aboard the Space shuttle Orbiter Endeavour on April 19, 2001 for an 11-day mission. The STS-100 mission, the sixth International Space Station (ISS) assembly flight, accomplished the following objectives: The delivery of the Canadian-built Space Station Remote Manipulator System (SSRMS), Canadarm2, which is needed to perform assembly operations on later flights, The delivery and installation of a UHF antenna that provides space-to-space communications capability for U.S.-based space walks, and carried the Italian-built Multipurpose Logistics Module Raffaello containing six system racks and two storage racks for the U.S. Lab, Destiny. |
|
STS-75 Crew Portrait
| Name of Image |
STS-75 Crew Portrait |
| Date of Image |
1995-12-01 |
| Full Description |
The crew assigned to the STS-75 mission included (seated left to right) Scott J. Horowiz, pilot, Andrew M. Allen, commander, and Franklin R. Chang-Diaz, mission specialist. Standing, left to right, are Maurizio Cheli, mission specialist of the European Space Agency (ESA), Umberto Guidoni, payload specialist (Italy), Jeffrey A. Hoffman, mission specialist, and Claude Nicollier, mission specialist (ESA). Launched aboard the Space Shuttle Columbia on February 22, 1996 at 3:18:00 pm (EST), the STS-75 mission carried two primary payloads, the reflight of the U.S./Italian Tethered Satellite System (TSS-1R), and the U.S. Microgravity Payload-3 (USMP-3). |
|
Space Shuttle STS-75 Columbi
| Name of Image |
Space Shuttle STS-75 Columbia launch |
| Date of Image |
1996-02-22 |
| Full Description |
The Space Shuttle Columbia (STS-75) cleared the tower following an on-time liftoff from Launch Pad 39B. Visible at lower left is the white room on the orbiter access arm through which the flight crew entered the orbiter earlier. Columbia's mission lasted 14 days and included retesting of the Tethered Satellite System (TSS-1R) and the third flight of the United States Microgravity Payload (USMP-3), both of which are managed by scientist at Marshall Space Flight Center. Included in Columbia's flight crew were members of the European Space Agency (ESA) and the Italian Space Agency (ASI), Mission Specialists Maurizio Cheli, Claude Nicollier and Payload Specialist Umberto Guidoni, respectively. |
|
STS-100 Mission Lifts off Ab
| Name of Image |
STS-100 Mission Lifts off Aboard Endeavour |
| Date of Image |
2001-04-19 |
| Full Description |
The sixth International Space Station (ISS) assembly flight, STS-100, blasted from the launch pad aboard the Space Shuttle Orbiter Endeavour on April 19, 2001. Onboard were astronauts Kent V. Rominger, Jeffrey S. Ashby, Scott E. Parazynski, Chris A. Hadfield, John Phillips, and Umberto Guidoni of the European Space agency, along with cosmonaut Yuri V. Lonchakov for an 11-day mission. Mission objectives included: The delivery of the second Canadian Remote Mainpultor System, Canadarm2, which is needed to perform assembly operations on later flights, The delivery and installation of a UHF anterna that provides space-to-space communications capability for U.S.-based space walks, and carried the Italian-built Multi-Purpose Logistics Module Raffaello containing six system racks and two storage racks for the U.S. Lab, Destiny. |
|
STS-100 Mission Lifts Off Ab
| Name of Image |
STS-100 Mission Lifts Off Aboard Endeavor |
| Date of Image |
2001-04-19 |
| Full Description |
The sixth International Space Station (ISS) assembly flight, STS-100, blasted from the launch pad aboard the Space Shuttle Orbiter Endeavour on April 19, 2001. Onboard were astronauts Kent V. Rominger, Jeffrey S. Ashby, Scott E. Parazynski, Chris A. Hadfield, John Phillips, and Umberto Guidoni of the European Space agency, along with cosmonaut Yuri V. Lonchakov for an 11-day mission. Mission objectives included: The delivery of the second Canadian Remote Manipulator System, Canadarm2, which is needed to perform assembly operations on later flights, The delivery and installation of a UHF anterna that provides space-to-space communications capability for U.S.-based space walks, and carried the Italian-built Multipurpose Logistics Module Raffaello containing six system racks and two storage racks for the U.S. Lab, Destiny. |
|
STS-75 crew at Launch Pad 39
| Title |
STS-75 crew at Launch Pad 39B during TCDT |
| Description |
The STS-75 flight crew stands in front of the Space Shuttle Columbia at Launch Pad 39B. From left are Mission Specialists Maurizio Cheli and Claude Nicollier of the European Space Agency, Mission Commander Andrew M. Allen, Mission Specialist Jeffrey A. Hoffman, Pilot Scott J. Horowitz, Payload Specialist Umberto Guidoni of the Italian Space Agency and Payload Commander Franklin R. Chang-Diaz. The crew is at KSC for the Terminal Countdown Demonstration Test, a dress rehearsal for launch. Columbia is scheduled to lift off on Mission STS-75 on Feb. 22. |
| Date |
02.02.1996 |
|
The crew of Space Shuttle mi
| Title |
The crew of Space Shuttle mission STS-100 gathered in front of the shuttle Endeavour following landi |
| Description |
The crew of Space Shuttle mission STS-100 gathered in front of the shuttle Endeavour following landing at Edwards Air Force Base, California, 9:11 am, May 1, 2001. From left to right: John L. Phillips, mission specialist (U.S.), Umberto Guidoni, mission specialist (European Space Agency), Chris A. Hadfield, mission specialist (Canadian Space Agency), Jeffrey S. Ashby, pilot (U.S.), Kent V. Rominger, commander (U.S.), Yuri V. Lonchakov, mission specialist (Russia), Scott E. Prazynski, mission specialist (U.S.). |
| Date |
05.01.2001 |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
STS-100 Shuttle Mission Imagery |
|
| General Description |
STS-100 Shuttle Mission Imagery |
|
| General Description |
STS-100 Shuttle Mission Imagery |
|
| General Description |
STS-100 Shuttle Mission Imagery |
|
| General Description |
STS-100 Shuttle Mission Imagery |
|
| General Description |
STS-100 Shuttle Mission Imagery |
|
| General Description |
STS-100 Shuttle Mission Imagery |
|
| General Description |
STS-100 Shuttle Mission Imagery |
|
| General Description |
STS-100 Shuttle Mission Imagery |
|
In the White Room, STS-100 M
| Description |
In the White Room, STS-100 Mission Specialist Umberto Guidoni is helped with his launch and entry suit by closeout crew members Danny Wyatt (left) and George Schramm (right). Guidoni is with the European Space Agency. The White Room is an environmental chamber at the end of the Orbiter Access Arm that provides entry into the orbiter on the launch pad. The mission will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Canadian-built Space Station Remote Manipulator System and the UHF Antenna. Two spacewalks are planned for installation of the SSRMS, which will be performed by Mission Specialists Scott E. Parazynski and Chris A. Hadfield, who is with the Canadian Space Agency. The mission is also the inaugural flight of the Multi-Purpose Logistics Module Raffaello, carrying resupply stowage racks and resupply/return stowage platforms. Liftoff of Space Shuttle Endeavour on mission STS-100 is scheduled at 2:41 p.m. EDT April 19 |
| Release Date |
04/19/2001 |
|
A worker (left) in the Space
| Description |
A worker (left) in the Space Station Processing Facility explains use of the equipment in the foreground to STS-100 Mission Specialist Umberto Guidoni (center) and Commander Kent Rominger (right). Guidoni is with the European Space Agency. Mission STS-100, scheduled to launch April 19, 2001, will include the Multi-Purpose Logistics Module (MPLM) Raffaello and the Space Station Remote Manipulator System (SSRMS) as its payload. MPLMs are pressurized modules that will serve as the International Space Station's ?moving vans,? carrying laboratory racks filled with equipment, experiments and supplies to and from the station aboard the Space Shuttle. The SSRMS is the primary means of transferring payloads between the orbiter payload bay and the International Space Station for assembly |
| Release Date |
09/28/2000 |
|
With workers (far left and f
| Description |
With workers (far left and far right) looking on, STS-100 Commander Kent Rominger tries out a piece of equipment while Mission Specialist Umberto Guidoni (leaning over) watches. Guidoni is with the European Space Agency. Mission STS-100, scheduled to launch April 19, 2001, will include Raffaello as well as the Space Station Remote Manipulator System (SSRMS) as its payload. MPLMs are pressurized modules that will serve as the International Space Station's ?moving vans,? carrying laboratory racks filled with equipment, experiments and supplies to and from the station aboard the Space Shuttle. The SSRMS is the primary means of transferring payloads between the orbiter payload bay and the International Space Station for assembly |
| Release Date |
09/29/2000 |
|
In the Space Station Process
| Description |
In the Space Station Processing Facility, STS-100 Commander Kent Rominger (left) tries out a piece of equipment while a worker (center) gives directions. Looking on at right is Mission Specialist Umberto Guidoni, with the European Space Agency. Mission STS-100, scheduled to launch April 19, 2001, will include Raffaello as well as the Space Station Remote Manipulator System (SSRMS) as its payload. MPLMs are pressurized modules that will serve as the International Space Station's ?moving vans,? carrying laboratory racks filled with equipment, experiments and supplies to and from the station aboard the Space Shuttle. The SSRMS is the primary means of transferring payloads between the orbiter payload bay and the International Space Station for assembly |
| Release Date |
09/29/2000 |
|
In the Space Station Process
| Description |
In the Space Station Processing Facility, STS-100 Mission Specialist Umberto Guidoni (left) and Commander Kent Rominger (center back), along with two workers, take a close look at equipment on the floor. Guidoni is with the European Space Agency. Mission STS-100, scheduled to launch April 19, 2001, will include the Multi-Purpose Logistics Module (MPLM) Raffaello and the Space Station Remote Manipulator System (SSRMS) as its payload. MPLMs are pressurized modules that will serve as the International Space Station's ?moving vans,? carrying laboratory racks filled with equipment, experiments and supplies to and from the station aboard the Space Shuttle. The SSRMS is the primary means of transferring payloads between the orbiter payload bay and the International Space Station for assembly |
| Release Date |
09/29/2000 |
|
STS-100 Commander Kent Romin
| Description |
STS-100 Commander Kent Rominger and Mission Specialist Umberto Guidoni, who is with the European Space Agency, look over the inside of Raffaello, a Multi-Purpose Logistics Module. Mission STS-100, scheduled to launch April 19, 2001, will include Raffaello as well as the Space Station Remote Manipulator System (SSRMS) as its payload. MPLMs are pressurized modules that will serve as the International Space Station's ?moving vans,? carrying laboratory racks filled with equipment, experiments and supplies to and from the station aboard the Space Shuttle. The SSRMS is the primary means of transferring payloads between the orbiter payload bay and the International Space Station for assembly |
| Release Date |
09/29/2000 |
|
With workers looking on, STS
| Description |
With workers looking on, STS-100 crew members check out equipment inside the Multi-Purpose Logistics Module Raffaello, located in the Space Station Processing Facility. Standing at center is Mission Specialist Umberto Guidoni, with the European Space Agency. Kneeling at right is Commander Kent Rominger. Mission STS-100, scheduled to launch April 19, 2001, will include Raffaello as well as the Space Station Remote Manipulator System (SSRMS) as its payload. MPLMs are pressurized modules that will serve as the International Space Station's ?moving vans,? carrying laboratory racks filled with equipment, experiments and supplies to and from the station aboard the Space Shuttle. The SSRMS is the primary means of transferring payloads between the orbiter payload bay and the International Space Station for assembly |
| Release Date |
09/29/2000 |
|
STS-100 Commander Kent Romin
| Description |
STS-100 Commander Kent Rominger and Mission Specialist Umberto Guidoni (right), with the European Space Agency, pose for a photo during Crew Equipment Interface Test activities in the Space Station Processing Facility. Behind them is the Space Station Remote Manipulator System (SSRMS), also known as the Canadian arm, which is part of the payload on their mission. The SSRMS is the primary means of transferring payloads between the orbiter payload bay and the International Space Station for assembly. The 56-foot-long robotic arm includes two 12-foot booms joined by a hinge. Seven joints on the arm allow highly flexible and precise movement. The payload also includes the Multi-Purpose Logistics Module (MPLM) Raffaello. MPLMs are pressurized modules that will serve as the International Space Station's ?moving vans,? carrying laboratory racks filled with equipment, experiments and supplies to and from the station aboard the Space Shuttle. Mission STS-100 is scheduled to launch April 19, 2001 |
| Release Date |
09/28/2000 |
|
With workers at left looking
| Description |
With workers at left looking on, STS-100 crew members check out equipment inside the Multi-Purpose Logistics Module Raffaello, located in the Space Station Processing Facility. At right is Commander Kent Rominger, to his left in the photo is Mission Specialist Umberto Guidoni, with the European Space Agency. Mission STS-100, scheduled to launch April 19, 2001, will include Raffaello as well as the Space Station Remote Manipulator System (SSRMS) as its payload. MPLMs are pressurized modules that will serve as the International Space Station's ?moving vans,? carrying laboratory racks filled with equipment, experiments and supplies to and from the station aboard the Space Shuttle. The SSRMS is the primary means of transferring payloads between the orbiter payload bay and the International Space Station for assembly |
| Release Date |
09/29/2000 |
|
In the Space Station Process
| Description |
In the Space Station Processing Facility, STS-100 Commander Kent Rominger and Mission Specialist Umberto Guidoni, who is with the European Space Agency, look over equipment on the floor. Mission STS-100, scheduled to launch April 19, 2001, will include the Multi-Purpose Logistics Module (MPLM) Raffaello and the Space Station Remote Manipulator System (SSRMS) as its payload. MPLMs are pressurized modules that will serve as the International Space Station's ?moving vans,? carrying laboratory racks filled with equipment, experiments and supplies to and from the station aboard the Space Shuttle. The SSRMS is the primary means of transferring payloads between the orbiter payload bay and the International Space Station for assembly |
| Release Date |
09/29/2000 |
|
The crew on mission STS-100
| Description |
The crew on mission STS-100 poses in the White Room during Terminal Countdown Demonstration Test activities. Standing, from left, are Mission Specialists Scott E. Parazynski, Yuri Lonchakov, and Umberto Guidoni, Pilot Jeffrey S. Ashby, Commander Kent V. Rominger, Mission Specialist Chris A. Hadfield, and Mission Specialist John L. Phillips. The TCDT includes emergency escape training, payload bay walkdown, and a simulated launch countdown. Launch of Space Shuttle Endeavour on mission STS-100 is targeted for April 19 at 2:41 p.m. EDT from Launch Pad 39A |
| Release Date |
04/08/2001 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- The STS-100 crew gives thumbs up on launch as they gather near Launch Pad 39A to greet family and friends. Starting at left, they are Mission Specialists Chris A. Hadfield, John L. Phillips and Umberto Guidoni, Commander Kent V. Rominger, Pilot Jeffrey S. Ashby, and Mission Specialists Scott E. Parazynski and Yuri V. Lonchakov. Hadfield is with the Canadian Space Agency, Guidoni is with the European Space Agency, and Lonchakov is with the Russian Aviation and Space Agency. In the background on the pad can be seen the tips of Space Shuttle Endeavour?s orange external tank and white solid rocket boosters. The 80-foot lightning rod towers above the Shuttle and service structures. The crew is at KSC to complete final flight plan reviews in anticipation of launch. The 11-day mission to the International Space Station will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator system and the UHF Antenna, and the Multi-Purpose Logistics Module Raffaello. The mission includes two planned spacewalks for installation of the SSRMS. The mission is also the inaugural flight of the MPLM Raffaello, carrying resupply stowage racks and resupply/return stowage platforms. Liftoff on mission STS-100 is scheduled at 2:41 p.m. EDT April 19 |
| Release Date |
04/18/2001 |
|
Members of the STS-100 crew,
| Description |
Members of the STS-100 crew, dressed in protective clothing, take a closer look at part of the mission payload, the Canadian robotic arm, SSRMS, which is on a workstand in the Space Station Processing Facility. From left are Mission Specialists John L. Phillips, Yuri V. Lonchakov, Umberto Guidoni, and Chris A. Hadfield. Lonchakov is with the Russian Space and Aviation Agency, Guidoni the European Space Agency, and Hadfield the Canadian Space Agency. The arm is 57.7 feet (17.6 meters) long when fully extended and has seven motorized joints. It is capable of handling large payloads and assisting with docking the Space Shuttle. The SSRMS is self-relocatable with a Latching End Effector, so it can be attached to complementary ports spread throughout the Station?s exterior surfaces. Mission STS-100 is scheduled to launch on Space Shuttle Endeavour April 19 at 2:41 p.m. EDT from Launch Pad 39A, KSC, with a crew of seven. Other crew members are Commander Kent V. Rominger, Pilot Jeffrey S. Ashby and Mission Specialist Scott E. Parazynski |
| Release Date |
03/29/2001 |
|
Members of the STS-100 crew
| Description |
Members of the STS-100 crew look at part of the mission payload, the Canadian robotic arm, SSRMS, which is on a workstand in the Space Station Processing Facility. Standing, from left, are Mission Specialists Yuri V. Lonchakov, Umberto Guidoni, John L. Phillips and Chris A. Hadfield. Lonchakov is with the Russian Space and Aviation Agency, Guidoni the European Space Agency, and Hadfield the Canadian Space Agency. The arm is 57.7 feet (17.6 meters) long when fully extended and has seven motorized joints. It is capable of handling large payloads and assisting with docking the Space Shuttle. The SSRMS is self-relocatable with a Latching End Effector, so it can be attached to complementary ports spread throughout the Station?s exterior surfaces. Mission STS-100 is scheduled to launch on Space Shuttle Endeavour April 19 at 2:41 p.m. EDT from Launch Pad 39A, KSC, with a crew of seven. Other crew members are Commander Kent V. Rominger, Pilot Jeffrey S. Ashby and Mission Specialist Scott E. Parazynski |
| Release Date |
03/29/2001 |
|
One of the STS-100 crew memb
| Description |
One of the STS-100 crew members looks at part of the Canadian robotic arm, SSRMS, which is on a workstand in the Space Station Processing Facility. The arm is 57.7 feet (17.6 meters) long when fully extended and has seven motorized joints. It is capable of handling large payloads and assisting with docking the Space Shuttle. The SSRMS is self-relocatable with a Latching End Effector, so it can be attached to complementary ports spread throughout the Station?s exterior surfaces. Mission STS-100 is scheduled to launch on Space Shuttle Endeavour April 19 at 2:41 p.m. EDT from Launch Pad 39A, KSC, with a crew of seven. The crew comprises Commander Kent V. Rominger, Pilot Jeffrey S. Ashby and Mission Specialists Chris A. Hadfield, Scott E. Parazynski, John L. Phillips, Umberto Guidoni and Yuri V. Lonchakov. Hadfield is with the Canadian Space Agency, Guidoni the European Space Agency and Lonchakov the Russian Space and Aviation Agency |
| Release Date |
03/29/2001 |
|
The STS-100 crew poses for a
| Description |
The STS-100 crew poses for a photo after their arrival at KSC to complete Terminal Countdown Demonstration Test activities that were postponed earlier. Standing, from left, are Commander Kent V. Rominger, Mission Specialists Umberto Guidoni, John L. Phillips, Chris A. Hadfield and Yuri V. Lonchakov, Pilot Jeffrey S. Ashby, and Mission Specialist Scott E. Parazynski. An international crew, Guidoni is with the European Space Agency, Hadfield the Canadian Space Agency, and Lonchakov the Russian Space and Aviation Agency. The TCDT includes emergency escape training, payload bay walkdown, and a simulated launch countdown. The primary payload comprises the Canadian robotic arm, SSRMS, and Multi-Purpose Logistics Module, Raffaello. Launch of Space Shuttle Endeavour on mission STS-100 is targeted for April 19 at 2:41 p.m. EDT from Launch Pad 39A |
| Release Date |
04/08/2001 |
|
Members of the STS-100 crew,
| Description |
Members of the STS-100 crew, dressed in protective clothing, take a look at part of the mission payload, the Canadian robotic arm, SSRMS, from the top of a workstand in the Space Station Processing Facility. From left are Mission Specialists John L. Phillips, Umberto Guidoni and Yuri V. Lonchakov. Guidoni is with the European Space Agency and Lonchakov is with the Russian Space and Aviation Agency. The arm is 57.7 feet (17.6 meters) long when fully extended and has seven motorized joints. It is capable of handling large payloads and assisting with docking the Space Shuttle. The SSRMS is self-relocatable with a Latching End Effector, so it can be attached to complementary ports spread throughout the Station?s exterior surfaces. Mission STS-100 is scheduled to launch on Space Shuttle Endeavour April 19 at 2:41 p.m. EDT from Launch Pad 39A, KSC, with a crew of seven. Other crew members are Commander Kent V. Rominger, Pilot Jeffrey S. Ashby and Mission Specialists Scott E. Parazynski and Chris A. Hadfield, who is with the Canadian Space Agency |
| Release Date |
03/29/2001 |
|
Ready to take the wheel on t
| Description |
Ready to take the wheel on the M-113 armored carrier is STS-100 Mission Specialist Umberto Guidoni. He and the rest of the crew are taking part in Terminal Countdown Demonstration Test activities, which include emergency escape training, payload walkdown and a simulated launch countdown. The tracked vehicle could be used by the crew in the event of an emergency at the pad during which the crew must make a quick exit from the area. The primary payload on mission STS-100 comprises the Canadian robotic arm, SSRMS, and Multi-Purpose Logistics Module, Raffaello. Launch of Space Shuttle Endeavour on mission STS-100 is targeted for April 19 at 2:41 p.m. EDT from Launch Pad 39A |
| Release Date |
04/08/2001 |
|
Before beginning training on
| Description |
Before beginning training on the M-113 armored carrier they are sitting on, the STS-100 crew pauses for a group photo. Seen, from left, are Mission Specialists Chris A. Hadfield, Yuri V. Lonchakov, John L. Phillips, and Scott E. Parazynski, Pilot Jeffrey S. Ashby, Mission Specialist Umberto guidoni, and Commander Kent V. Rominger. They are taking part in Terminal Countdown Demonstration Test activities, which include emergency escape training, payload walkdown and a simulated launch countdown. The primary payload on mission STS-100 comprises the Canadian robotic arm, SSRMS, and Multi-Purpose Logistics Module, Raffaello. Launch of Space Shuttle Endeavour on mission STS-100 is targeted for April 19 at 2:41 p.m. EDT from Launch Pad 39A |
| Release Date |
04/08/2001 |
|
The crew on mission STS-100
| Description |
The crew on mission STS-100 poses in the White Room during Terminal Countdown Demonstration Test activities. Standing, from left, are Mission Specialists Scott E. Parazynski, Yuri Lonchakov, and Umberto Guidoni, Pilot Jeffrey S. Ashby, Commander Kent V. Rominger, and Mission Specialists Chris A. Hadfield and John L. Phillips. The TCDT includes emergency escape training, payload bay walkdown, and a simulated launch countdown. The primary payload comprises the Canadian robotic arm, SSRMS, and Multi-Purpose Logistics Module, Raffaello. Launch of Space Shuttle Endeavour on mission STS-100 is targeted for April 19 at 2:41 p.m. EDT from Launch Pad 39A |
| Release Date |
04/08/2001 |
|
Driving an M-113 armored car
| Description |
Driving an M-113 armored carrier, STS-100 Commander Kent V. Rominger kicks up dust. Passengers include the rest of the crew, Pilot Jeffrey S. Ashby and Mission Specialists Chris A. Hadfield, Scott E. Parazynski, John L. Phillips, Umberto Guidoni and Yuri V. Lonchakov. Driving the tracked vehicle is part of Terminal Countdown Demonstration Test activities, which include emergency escape training, payload walkdown and a simulated launch countdown. The primary payload on mission STS-100 comprises the Canadian robotic arm, SSRMS, and Multi-Purpose Logistics Module, Raffaello. Launch of Space Shuttle Endeavour on mission STS-100 is targeted for April 19 at 2:41 p.m. EDT from Launch Pad 39A |
| Release Date |
04/08/2001 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- The STS-100 crew gathers on the 195-foot level of the Fixed Service Structure for slidewire basket training. The baskets are part of an emergency escape system from the orbiter and the pad. Seen, from left, are Pilot Jeffrey S. Ashby, Mission Specialists Chris A. Hadfield, Yuri V. Lonchakov, Scott E. Parazynski and Umberto Guidoni, Commander Kent V. Rominger, and on the right, Mission Specialist John L. Phillips. The training is part of Terminal Countdown Demonstration Test activities, which also include payload walkdown and a simulated launch countdown. The primary payload on mission STS-100 comprises the Canadian robotic arm, SSRMS, and Multi-Purpose Logistics Module, Raffaello. Launch of Space Shuttle Endeavour on mission STS-100 is targeted for April 19 at 2:41 p.m. EDT from Launch Pad 39A |
| Release Date |
04/08/2001 |
|
The STS-100 crew walks out o
| Description |
The STS-100 crew walks out of the Operations and Checkout Building on their way to Launch Pad 39A and liftoff for an 11-day mission to the International Space Station. Leading in front are Pilot Jeffrey S. Ashby (left) and Commander Kent V. Rominger (right). Behind them are (left to right) Mission Specialists Umberto Guidoni, Yuri Lonchakov and Chris A. Hadfield. Following in the rear are Mission Specialists Scott E. Parazynski (left) and John L. Phillips (right). An international crew, Guidoni represents the European Space Agency, Lonchakov the Russian Aviation and Space Agency and Hadfield the Canadian Space Agency. Space Shuttle Endeavour and its crew will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator System and the UHF Antenna. The mission includes two planned spacewalks for installation of the SSRMS, which will be performed by Parazynski and Hadfield. The mission is also the inaugural flight of Multi-Purpose Logistics Module Raffaello, carrying resupply stowage racks and resupply/return stowage platforms. Liftoff of Space Shuttle Endeavour on mission STS-100 is scheduled at 2:41 p.m. EDT April 19 |
| Release Date |
04/19/2001 |
|
Leaving the Operations and C
| Description |
Leaving the Operations and Checkout Building, the STS-100 crew waves to well-wishers and heads to the Astrovan for transport to Launch Pad 39A. . Leading in front are Pilot Jeffrey S. Ashby (left) and Commander Kent V. Rominger (right). Behind them are (left to right) Mission Specialists Yuri Lonchakov and Chris A. Hadfield. Next are Mission Specialists Umberto Guidoni (left) and John L. Phillips (right). Following in the rear is Mission Specialist Scott E. Parazynski. An international crew, Guidoni represents the European Space Agency, Lonchakov the Russian Aviation and Space Agency and Hadfield the Canadian Space Agency. Space Shuttle Endeavour and its crew will deliver and integrate the Spacelab Logistics Pallet/Launch Deployment Assembly, which includes the Space Station Remote Manipulator System and the UHF Antenna. The mission includes two planned spacewalks for installation of the SSRMS, which will be performed by Parazynski and Hadfield. The mission is also the inaugural flight of Multi-Purpose Logistics Module Raffaello, carrying resupply stowage racks and resupply/return stowage platforms. Liftoff of Space Shuttle Endeavour on mission STS-100 is scheduled at 2:41 p.m. EDT April 19 |
| Release Date |
04/19/2001 |
|
Official portrait of Umberto
| Title |
Official portrait of Umberto Guidoni, STS-46 backup payload specialist |
| Description |
Official portrait of Umberto Guidoni, STS-46 Atlantis, Orbiter Vehicle (OV) 104, backup payload specialist, wearing blue flight suit, with flag, space shuttle and tethered satellite system (TSS) models. |
| Date Taken |
1991-09-03 |
|
|