|
|
Browse All
:
Space Shuttle Orbiter and International Space Station (ISS) by Steven MacLean from 2006
|
Printer Friendly |
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, STS-115 Mission Speciailsts Steven MacLean and Heidemarie Stefanyshyn-Piper (center) review procedures for launch while inspecting the orbiter Atlantis. The crew is at KSC for Crew Equipment Interface Test activities, which involve equipment familiarization and inspection, a routine part of astronaut training and launch preparations. The STS-115 mission will deliver the second port truss segment, the P3/P4 truss, to the International Space Station. The crew will attach the P3 to the first port truss segment, the P1 truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Atlantis is scheduled for late August. Photo credit: NASA/Kim Shiflett |
| Release Date |
06/24/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - The STS-115 crew pauses for a photo during training on Launch Pad 39B. From left are Mission Commander Brent Jett, Pilot Chris Ferguson, and Mission Specialists Daniel Burbank, Steven MacLean, Heidemarie Stefanyshyn-Piper and Joseph Tanner. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/09/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - The STS-115 crew is in the White Room on the orbiter access arm on Launch Pad 39B to get instruction on using the emergency egress system. From left are Commander Brent Jett, Pilot Chris Ferguson, and Mission Specialists Heidemarie Stefanyshyn-Piper, Joseph Tanner, Steven MacLean and Daniel Burbank. MacLean is with the Canadian Space Agency. he White Room provides access into the orbiter through the crew access hatch. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/09/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - The STS-115 crew is in the White Room on the orbiter access arm on Launch Pad 39B to get instruction on using the emergency egress system. From left are Commander Brent Jett, Pilot Chris Ferguson, and Mission Specialists Heidemarie Stefanyshyn-Piper, Joseph Tanner, Steven MacLean and Daniel Burbank. MacLean is with the Canadian Space Agency. The White Room provides access into the orbiter through the crew access hatch. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/09/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - The STS-115 crew gets instructions on landing the slidewire baskets, used during emergency egress from the launch pad. Visible from left are Pilot Chris Ferguson, Mission Specialist Joseph Tanner, Commander Brent Jett, Mission Specialist Steven MacLean, who is with the Canadian Space Agency. Partially hidden behind them are Mission Specialists Heidemarie Stefanyshyn-Piper and Daniel Burbank. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/09/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - The STS-115 crew gets instructions on landing the slidewire baskets, used during emergency egress from the launch pad. From left are Mission Specialists Joseph Tanner and Heidemarie Stefanyshyn-Piper, Commander Brent Jett, and Mission Specialists Daniel Burbank, Chris Ferguson and Steven MacLean, who is with the Canadian Space Agency. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/09/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - The STS-115 crew practices exiting from the slidewire basket, used during emergency egress from the launch pad. Sitting in the basket is Pilot Chris Ferguson. Helping are Commander Brent Jett (left) and Mission Specialist Steven MacLean (right). The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/09/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - The STS-115 crew gets instructions about using the slidewire baskets for emergency egress from the space shuttle on the pad. Seen here are Mission Specialists Heidemarie Stefanyshyn-Piper and Daniel Burbank, Pilot Chris Ferguson, Mission Specialist Steven MacLean and Commander Brent Jett. MacLean is with the Canadian Space Agency. Not seen is Mission Specialist Joseph Tanner. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/09/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - The STS-115 crew members are suiting up for their simulated launch countdown. Shown here fixing his glove is Mission Specialist Steven MacLean, who is with the Canadian Space Agency. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. The TCDT has included emergency egress training as well as the simulation. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/10/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - The STS-115 crew responds to questions from the media at a press conference held on Launch Pad 39B. Seen left to right are Commander Brent Jett, Mission Specialist Steven MacLean, Pilot Chris Ferguson, and Mission Specialist Daniel Burbank. Crew members not seen are Mission Specialists Heidemarie Stefanyshyn-Piper and Joseph Tanner. MacLean is with the Canadian Space Agency. The mission crew is at KSC for Terminal Countdown Demonstration Test activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. The TCDT culminates in a simulated launch countdown. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/09/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - The STS-115 crew learn about use of the bunker in the event of an emergency at the launch pad. Seen in the photo are, from left, Commander Brent Jett, Mission Specialists Daniel Burbank and Steven MacLean, Pilot Chris Ferguson and Mission Specialist Joseph Tanner. Not pictured is Mission Specialist Heidemarie Stefanyshyn-Piper. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/09/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - The STS-115 crew poses for the media before a press conference on Launch Pad 39B. Seen left to right are Mission Specialist Steven MacLean, Commander Brent Jett, Mission Specialist Daniel Burbank, Pilot Chris Ferguson, and Mission Specialists Heidemarie Stefanyshyn-Piper and Joseph Tanner. MacLean is with the Canadian Space Agency. The mission crew is at KSC for Terminal Countdown Demonstration Test activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. Behind the crew is the shuttle, surrounded by the fixed and rotating service structures, with the orange external tank and while solid rocket boosters showing. The TCDT culminates in a simulated launch countdown. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/09/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - The STS-115 crew gets instructions on landing the slidewire baskets, used during emergency egress from the launch pad. From left are Mission Specialists Joseph Tanner and Heidemarie Stefanyshyn-Piper, Commander Brent Jett, and Mission Specialists Daniel Burbank, Chris Ferguson and Steven MacLean, who is with the Canadian Space Agency. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/09/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - The STS-115 crew gets instructions about using the slidewire baskets for emergency egress from the space shuttle on the pad. From left are Commander Brent Jett and Mission Specialists Steven MacLean, Heidemarie Stefanyshyn-Piper and Joseph Tanner. MacLean is with the Canadian Space Agency. Not pictured are Pilot Chris Ferguson and Mission Specialist Daniel Burbank. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/09/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - The STS-115 crew gets instructions about using the slidewire baskets for emergency egress from the space shuttle on the pad. From left are Commander Brent Jett and Mission Specialists Steven MacLean, Heidemarie Stefanyshyn-Piper and Joseph Tanner, and Pilot Chris Ferguson. MacLean is with the Canadian Space Agency. Not pictured is Mission Specialist Daniel Burbank. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/09/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - The STS-115 crew responds to questions from the media at a press conference held on Launch Pad 39B. Seen left to right are Commander Brent Jett, Mission Specialist Steven MacLean, Pilot Chris Ferguson, and Mission Specialists Daniel Burbank, Heidemarie Stefanyshyn-Piper and Joseph Tanner. MacLean is with the Canadian Space Agency. The mission crew is at KSC for Terminal Countdown Demonstration Test activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. The TCDT culminates in a simulated launch countdown. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/09/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - The STS-115 crew practices exiting from the slidewire basket, used during emergency egress from the launch pad. Sitting in the basket are Pilot Chris Ferguson and Mission Specialist Steven MacLean, who is with the Canadian Space Agency. On the left is Mission Specialist Daniel Burbank. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/09/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - The STS-115 crew is in the White Room on the orbiter access arm on Launch Pad 39B to get instruction on using the emergency egress system. From left are Pilot Chris Ferguson, Commander Brent Jett, and Mission Specialists Heidemarie Stefanyshyn-Piper, Joseph Tanner, Steven MacLean and Daniel Burbank. MacLean is with the Canadian Space Agency. The White Room provides access into the orbiter through the crew access hatch. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/09/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - The STS-115 crew responds to questions from the media at a press conference held on Launch Pad 39B. Seen left to right are Commander Brent Jett, Mission Specialist Steven MacLean, Pilot Chris Ferguson, and Mission Specialists Daniel Burbank, Heidemarie Stefanyshyn-Piper and Joseph Tanner. MacLean is with the Canadian Space Agency. The mission crew is at KSC for Terminal Countdown Demonstration Test activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. The TCDT culminates in a simulated launch countdown. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/09/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - The STS-115 crew practices exiting from the slidewire basket, used during emergency egress from the launch pad. At left is Pilot Chris Ferguson, at right is Mission Specialist Steven MacLean, who is with the Canadian Space Agency. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/09/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - The STS-115 crew gets instructions about using the slidewire baskets for emergency egress from the space shuttle on the pad. At center, foreground, is Commander Brent Jett. The others, from left are Mission Specialists Joseph Tanner, gesturing, Steven MacLean, Daniel Burbank and Heidemarie Stefanyshyn-Piper. MacLean is with the Canadian Space Agency. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/09/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - The STS-115 crew responds to questions from the media at a press conference on Launch Pad 39B. Seen left to right are Commander Brent Jett, Mission Specialist Steven MacLean, Pilot Chris Ferguson, and Mission Specialists Daniel Burbank, Heidemarie Stefanyshyn-Piper and Joseph Tanner. MacLean is with the Canadian Space Agency. The mission crew is at KSC for Terminal Countdown Demonstration Test activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. The TCDT culminates in a simulated launch countdown. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/09/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - The STS-115 crew members are suiting up for their simulated launch countdown. Shown here is Mission Specialist Steven MacLean, who is with the Canadian Space Agency. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. The TCDT has included emergency egress training as well as the simulation. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/10/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - STS-115 crew members take another look at an M-113 armored personnel carrier that could be used to move quickly away from the launch pad in the event of an emergency. From left are Commander Brent Jett, Pilot Chris Ferguson and Mission Specialists Heidemarie Stefanyshyn-Piper and Joseph Tanner. In the foreground are Mission Specialists Daniel Burbank and Steven MacLean, who is with the Canadian Space Agency. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/09/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - The STS-115 crew members are checking the fit of their launch and entry suits before tomorrow's simulated launch countdown. Checking his glove is Mission Specialist Steven MacLean, who represents the Canadian Space Agency. The simulation is the culmination of Terminal Countdown Demonstration Test activities at NASA's Kennedy Space Center. The crew is getting ready for their launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During the 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/08/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - Following a simulated launch countdown and emergency egress practice, the STS-115 crew gathers on the 215-foot level of the fixed service structure on Launch Pad 39B. From left are Mission Specialists Joseph Tanner and Heidemarie Stefanyshyn-Piper, Commander Brent Jett, Pilot Christopher Ferguson, and Mission Specialists Steven MacLean and Daniel Burbank. MacLean is with the Canadian Space Agency. Behind them loom the top of Space Shuttle Atlantis' external tank and one of the solid rocket boosters. The TCDT is a prelaunch preparation for the mission that is scheduled to lift off in a window opening Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/10/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - Following a simulated launch countdown and emergency egress practice, the STS-115 crew gathers on the 215-foot level of the fixed service structure on Launch Pad 39B. From left are Pilot Christopher Ferguson, Mission Specialists Heidemarie Stefanyshyn-Piper and Joseph Tanner, Commander Brent Jett, and Mission Specialists Steven MacLean and Daniel Burbank. MacLean is with the Canadian Space Agency. Behind them loom the top of Space Shuttle Atlantis' external tank and one of the solid rocket boosters. The TCDT is a prelaunch preparation for the mission that is scheduled to lift off in a window opening Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston |
| Release Date |
08/10/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - STS-115 Mission Specialist Steven MacLean tests the fit of his helmet before launching on Aug. 27. MacLean, who represents the Canadian Space Agency, will be making his second flight on a shuttle. Mission STS-115 is scheduled to lift off about 4:30 p.m. Aug. 27 on Space Shuttle Atlantis. The crew will deliver and install the P3/P4 segment to the port side of the integrated truss system on the International Space Station. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. The mission is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett |
| Release Date |
08/25/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - STS-115 Mission Specialist Steven MacLean has his launch suit checked for fit before the launch on Aug. 27. MacLean, who represents the Canadian Space Agency, will be making his second flight on a shuttle. Mission STS-115 is scheduled to lift off about 4:30 p.m. Aug. 27 on Space Shuttle Atlantis. The crew will deliver and install the P3/P4 segment to the port side of the integrated truss system on the International Space Station. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. The mission is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett |
| Release Date |
08/25/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - During suit check, STS-115 Mission Specialist Steven MacLean signals confidence about the launch on Space Shuttle Atlantis on Aug. 27. MacLean, who represents the Canadian Space Agency, will be making his second flight on a shuttle. Mission STS-115 is scheduled to lift off about 4:30 p.m. Aug. 27. The crew will deliver and install the P3/P4 segment to the port side of the integrated truss system on the International Space Station. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. The mission is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett |
| Release Date |
08/25/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - During suit check, STS-115 Mission Specialist Steven MacLean waves in confidence about the launch on Space Shuttle Atlantis on Aug. 27. MacLean, who represents the Canadian Space Agency, will be making his second flight on a shuttle. Mission STS-115 is scheduled to lift off about 4:30 p.m. Aug. 27. The crew will deliver and install the P3/P4 segment to the port side of the integrated truss system on the International Space Station. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. The mission is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett |
| Release Date |
08/25/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility at NASA's Kennedy Space Center, STS-115 crew members inspect equipment in Atlantis's payload bay. Looking at the airlock are Mission Specialist Daniel Burbank (left) and Steven MacLean. The crew is at KSC for Crew Equipment Interface Test activities, which involves equipment familiarization, a routine part of astronaut training and launch preparations. The STS-115 mission will deliver the second port truss segment, the P3/P4 truss, to the International Space Station. The crew will attach the P3 to the first port truss segment, the P1 truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Atlantis is scheduled for late August. Photo credit: NASA/Kim Shiflett |
| Release Date |
06/23/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility at NASA's Kennedy Space Center, STS-115 crew members inspect equipment in Atlantis's payload bay. Looking at the airlock are Mission Specialists Steven MacLean (left) and Daniel Burbank (foreground). The crew is at KSC for Crew Equipment Interface Test activities, which involves equipment familiarization, a routine part of astronaut training and launch preparations. The STS-115 mission will deliver the second port truss segment, the P3/P4 truss, to the International Space Station. The crew will attach the P3 to the first port truss segment, the P1 truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Atlantis is scheduled for late August. Photo credit: NASA/Kim Shiflett |
| Release Date |
06/23/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility at NASA's Kennedy Space Center, STS-115 crew members inspect equipment in Atlantis's payload bay. Mission Specialist Daniel Burbank (second from left) looks into the bay. Next to him on the right is Mission Specialist Steven MacLean, talking to a technician. The crew is at KSC for Crew Equipment Interface Test activities, which involves equipment familiarization, a routine part of astronaut training and launch preparations. The STS-115 mission will deliver the second port truss segment, the P3/P4 truss, to the International Space Station. The crew will attach the P3 to the first port truss segment, the P1 truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Atlantis is scheduled for late August. Photo credit: NASA/Kim Shiflett |
| Release Date |
06/23/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility at NASA's Kennedy Space Center, STS-115 crew members inspect equipment in Atlantis's payload bay. Mission Specialists (starting second from left) Daniel Burbank and Steven MacLean look at the orbiter boom sensor system. The crew is at KSC for Crew Equipment Interface Test activities, which involves equipment familiarization, a routine part of astronaut training and launch preparations. The STS-115 mission will deliver the second port truss segment, the P3/P4 truss, to the International Space Station. The crew will attach the P3 to the first port truss segment, the P1 truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Atlantis is scheduled for late August. Photo credit: NASA/Kim Shiflett |
| Release Date |
06/23/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - STS-115 Mission Specialists Daniel Burbank (left) and Steven MacLean get help with their launch suits from the closeout crew before entering Space Shuttle Atlantis. Both astronauts are making their second shuttle flights. MacLean is with the Canadian Space Agency. During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC |
| Release Date |
09/09/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - In the White Room on Launch Pad 39B, STS-115 Mission Specialist Steven MacLean adjusts his launch suit while talking with the closeout crew. MacLean, who represents the Canadian Space Agency, is making his second shuttle flight. During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC |
| Release Date |
09/09/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - After a week's delay of launching due to weather and technical issues, the crew of mission STS-115 enjoy the traditional breakfast before their second attempt to launch on Space Shuttle Atlantis. Seated left to right are Mission Specialists Joseph Tanner and Heidemarie Stefanyshyn-Piper, Pilot Christopher Ferguson, Commander Brent Jett and Mission Specialists Steven MacLean and Daniel Burbank. MacLean is with the Canadian Space Agency. Following the breakfast, the crew will don their launch suits before heading to Launch Pad 39B. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Kim Shiflett |
| Release Date |
09/08/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Steven MacLean dons his launch and re-entry suit before heading to the launch pad. MacLean is with the Canadian Space Agency. MacLean is making his second shuttle flight on this mission to the International Space Station aboard Space Shuttle Atlantis. On its second attempt for launch, Atlantis is scheduled to lift off at 11:41 a.m. EDT today from Launch Pad 39B. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Kim Shiflett |
| Release Date |
09/08/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Steven MacLean checks his glove during suitup before heading to the launch pad. MacLean is with the Canadian Space Agency. MacLean is making his second shuttle flight on this mission to the International Space Station aboard Space Shuttle Atlantis. On its second attempt for launch, Atlantis is scheduled to lift off at 11:41 a.m. EDT today from Launch Pad 39B. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Kim Shiflett |
| Release Date |
09/08/2006 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - The STS-115 crew members stride out of the Operations and Checkout Building eager to get to Launch Pad 39B and the start of their mission to the International Space Station. This is the second attempt at launch after a week's postponement due to weather and technical concerns. On the left side, front to back, are Pilot Christopher Ferguson and Mission Specialists Steven MacLean and Heidemarie Stefanyshyn-Piper. On the right side, front to back, are Commander Brent Jett and Mission Specialists Daniel Burbank and Joseph Tanner. On its second attempt for launch, Atlantis is scheduled to lift off at 11:41 a.m. EDT today from Launch Pad 39B. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Kim Shiflett |
| Release Date |
09/08/2006 |
|
|