Browse All : Space Shuttle Orbiter by Soichi Noguchi of Kennedy Space Center (KSC)

Printer Friendly
1 2
1-50 of 77
     
     
Close-up of Shuttle Thermal …
Name of Image Close-up of Shuttle Thermal Tiles in Space
Date of Image 2005-08-03
Full Description Launched on July 26 2005, from the Kennedy Space Center in Florida, STS-114 was classified as Logistics Flight 1. Among the Station-related activities of the mission were the delivery of new supplies and the replacement of one of the orbital outpost's Control Moment Gyroscopes (CMGs). STS-114 also carried the Raffaello Multi-Purpose Logistics Module and the External Stowage Platform-2. A major focus of the mission was the testing and evaluation of new Space Shuttle flight safety, which included new inspection and repair techniques. Upon its approach to the International Space Station (ISS), the Space Shuttle Discovery underwent a photography session in order to assess any damages that may have occurred during its launch and/or journey through Space. The mission?s third and final Extra Vehicular Activity (EVA) included taking a close-up look and the repair of the damaged heat shield. Gap fillers were removed from between the orbiter?s heat-shielding tiles located on the craft?s underbelly. Never before had any repairs been done to an orbiter while still in space. This close up of the thermal tiles was taken by astronaut Stephen K. Robinson, STS-114 mission specialist (out of frame). Astronaut Soichi Noguchi, STS-114 mission specialist representing the Japan Aerospace Exploration (JAXA), can be seen in the background perched on a Space Station truss.
General Description STS-114 Shuttle Mission Imagery
General Description STS-114 Shuttle Mission Imagery
General Description STS-114 Shuttle Mission Imagery
General Description STS-114 Shuttle Mission Imagery
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- STS-114 Mission Specialist Soichi Noguchi looks closely at low pressure oxidizer duct in the Space Shuttle Main Engine Shop at KSC. He and other crew members are touring several areas on the Center. The STS-114 mission is Logistics Flight 1, which is scheduled to deliver supplies and equipment plus the external stowage platform to the International Space Station.
Release Date 05/07/2004
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Shuttle Main Engine Shop at KSC, the STS-114 crew poses for a photo in front of two of the main engines. Crew members, from left, are Mission Commander Eileen Collins, Mission Specialists Charles Camarda and Wendy Lawrence, Pilot James Kelly, and Mission Specialists Andrew Thomas and Soichi Noguchi, who represents the Japanese Aerospace and Exploration Agency. Behind them are Dan Hausman (director, Product Support, Boeing), Dan Sweety (manager, Safety & Mission Assurance, Boeing) and Matt McClelland (team manager, Tech Ops, Boeing). The STS-114 mission is Logistics Flight 1, which is scheduled to deliver supplies and equipment plus the external stowage platform to the International Space Station.
Release Date 05/07/2004
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Astronaut Soichi Noguchi, with the National Space Development Agency of Japan (NASDA), looks at the Japanese Experiment Module after its arrival at Port Canaveral, Fla. Built by the Tsukuba Space Center near Tokyo, the pressurized module is the first element of the JEM, Japan?s primary contribution to the space station, to be delivered to KSC. It will enhance the unique research capabilities of the orbiting complex by providing an additional shirt-sleeve environment for astronauts to conduct science experiments. The JEM also includes two logistics modules, an exposed pallet for space environment experiments and a robotic manipulator system that are still under construction in Japan. The various JEM components will be assembled in space over the course of three space shuttle missions. .
Release Date 05/30/2003
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Astronaut Soichi Noguchi, with the National Space Development Agency of Japan (NASDA), looks at the Japanese Experiment Module after its arrival at Port Canaveral, Fla. Built by the Tsukuba Space Center near Tokyo, the pressurized module is the first element of the JEM, Japan?s primary contribution to the space station, to be delivered to KSC. It will enhance the unique research capabilities of the orbiting complex by providing an additional shirt-sleeve environment for astronauts to conduct science experiments. The JEM also includes two logistics modules, an exposed pallet for space environment experiments and a robotic manipulator system that are still under construction in Japan. The various JEM components will be assembled in space over the course of three space shuttle missions.
Release Date 05/30/2003
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Astronaut Soichi Noguchi, with the National Space Development Agency of Japan (NASDA), stands next to the Japanese Experiment Module after its arrival at Port Canaveral, Fla. Built by the Tsukuba Space Center near Tokyo, the pressurized module is the first element of the JEM, Japan?s primary contribution to the space station, to be delivered to KSC. It will enhance the unique research capabilities of the orbiting complex by providing an additional shirt-sleeve environment for astronauts to conduct science experiments. The JEM also includes two logistics modules, an exposed pallet for space environment experiments and a robotic manipulator system that are still under construction in Japan. The various JEM components will be assembled in space over the course of three space shuttle missions.
Release Date 05/30/2003
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Astronaut Soichi Noguchi, with the National Space Development Agency of Japan (NASDA), looks at the Japanese Experiment Module after its arrival at Port Canaveral, Fla. Built by the Tsukuba Space Center near Tokyo, the pressurized module is the first element of the JEM, Japan?s primary contribution to the space station, to be delivered to KSC. It will enhance the unique research capabilities of the orbiting complex by providing an additional shirt-sleeve environment for astronauts to conduct science experiments. The JEM also includes two logistics modules, an exposed pallet for space environment experiments and a robotic manipulator system that are still under construction in Japan. The various JEM components will be assembled in space over the course of three space shuttle missions.
Release Date 05/30/2003
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Members of the Space Shuttle Discovery?s Return to Flight STS-114 crew are conducting a payload Crew Equipment Interface Test (CEIT) in the Space Station Processing Facility at NASA?s Kennedy Space Center, Fla. Seen here looking at tile samples are Mission Specialists Stephen Robinson (left) and Soichi Noguchi (right), who is with the Japanese Aerospace Exploration Agency. The launch window for STS-114 is May 15 to June 3, 2005. During CEIT, the crew is inspecting the resupply stowage racks installed in the Italian-built Multi-Purpose Logistics Module Raffaello and performing tool and equipment interface checks with the Thermal Protection System (TPS) repair sample box, the Control Moment Gyroscope (CMG) and the External Stowage Platform-2 in preparation for the mission?s three scheduled spacewalks. The seven-member crew will fly to the International Space Station primarily to evaluate procedures for flight safety, including Shuttle inspection and repair techniques. The TPS repair sample box contains tile samples for the Detailed Test Objective (DTO) that will enable the crew to test new on-orbit TPS repair techniques. The CMG installed on the Lightweight Multi-Purpose Experiment Support Structure Carrier (LMC) is a replacement for an inoperable CMG on the International Space Station. The CMGs provide altitude control for the outpost keeping it properly oriented toward the Sun without use of rocket fuel. The ESP2 will carry replacement parts, known as orbital replacement units (ORU) to the Station. The platform will be deployed and attached to the Station?s airlock and will be used as a permanent spare parts facility.
Release Date 03/18/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Members of the Space Shuttle Discovery?s Return to Flight STS-114 crew are conducting a payload Crew Equipment Interface Test (CEIT) in the Space Station Processing Facility at NASA?s Kennedy Space Center, Fla. Seen here are Commander Eileen Collins (left) and Mission Specialist Soichi Noguchi (right), who is with the Japanese Aerospace Exploration Agency. The launch window for STS-114 is May 15 to June 3, 2005. During CEIT, the crew is inspecting the resupply stowage racks installed in the Italian-built Multi-Purpose Logistics Module Raffaello and performing tool and equipment interface checks with the Thermal Protection System (TPS) repair sample box, the Control Moment Gyroscope (CMG) and the External Stowage Platform-2 in preparation for the mission?s three scheduled spacewalks. The seven-member crew will fly to the International Space Station primarily to evaluate procedures for flight safety, including Shuttle inspection and repair techniques. The TPS repair sample box contains tile samples for the Detailed Test Objective (DTO) that will enable the crew to test new on-orbit TPS repair techniques. The CMG installed on the Lightweight Multi-Purpose Experiment Support Structure Carrier (LMC) is a replacement for an inoperable CMG on the International Space Station. The CMGs provide altitude control for the outpost keeping it properly oriented toward the Sun without use of rocket fuel. The ESP2 will carry replacement parts, known as orbital replacement units (ORU) to the Station. The platform will be deployed and attached to the Station?s airlock and will be used as a permanent spare parts facility.
Release Date 03/18/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Members of the Space Shuttle Discovery?s Return to Flight STS-114 crew are conducting a payload Crew Equipment Interface Test (CEIT) in the Space Station Processing Facility at NASA?s Kennedy Space Center, Fla. Seen here inside the Multi-Purpose Logistics Module Raffaello are Mission Specialists Wendy Lawrence (left) and Soichi Noguchi (right), who is with the Japanese Aerospace Exploration Agency. The launch window for STS-114 is May 15 to June 3, 2005. During CEIT, the crew is inspecting the resupply stowage racks installed in the Italian-built Multi-Purpose Logistics Module Raffaello and performing tool and equipment interface checks with the Thermal Protection System (TPS) repair sample box, the Control Moment Gyroscope (CMG) and the External Stowage Platform-2 in preparation for the mission?s three scheduled spacewalks. The seven-member crew will fly to the International Space Station primarily to evaluate procedures for flight safety, including Shuttle inspection and repair techniques. The TPS repair sample box contains tile samples for the Detailed Test Objective (DTO) that will enable the crew to test new on-orbit TPS repair techniques. The CMG installed on the Lightweight Multi-Purpose Experiment Support Structure Carrier (LMC) is a replacement for an inoperable CMG on the International Space Station. The CMGs provide altitude control for the outpost keeping it properly oriented toward the Sun without use of rocket fuel. The ESP2 will carry replacement parts, known as orbital replacement units (ORU) to the Station. The platform will be deployed and attached to the Station?s airlock and will be used as a permanent spare parts facility.
Release Date 03/18/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Members of the Space Shuttle Discovery?s Return to Flight STS-114 crew are conducting a payload Crew Equipment Interface Test (CEIT) in the Space Station Processing Facility at NASA?s Kennedy Space Center, Fla. Seen here is Mission Specialist Soichi Noguchi, who is with the Japanese Aerospace Exploration Agency. The launch window for STS-114 is May 15 to June 3, 2005. During CEIT, the crew is inspecting the resupply stowage racks installed in the Italian-built Multi-Purpose Logistics Module Raffaello and performing tool and equipment interface checks with the Thermal Protection System (TPS) repair sample box, the Control Moment Gyroscope (CMG) and the External Stowage Platform-2 in preparation for the mission?s three scheduled spacewalks. The seven-member crew will fly to the International Space Station primarily to evaluate procedures for flight safety, including Shuttle inspection and repair techniques. The TPS repair sample box contains tile samples for the Detailed Test Objective (DTO) that will enable the crew to test new on-orbit TPS repair techniques. The CMG installed on the Lightweight Multi-Purpose Experiment Support Structure Carrier (LMC) is a replacement for an inoperable CMG on the International Space Station. The CMGs provide altitude control for the outpost keeping it properly oriented toward the Sun without use of rocket fuel. The ESP2 will carry replacement parts, known as orbital replacement units (ORU) to the Station. The platform will be deployed and attached to the Station?s airlock and will be used as a permanent spare parts facility.
Release Date 03/18/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - During Crew Equipment Interface Test (CEIT) at SPACEHAB in Cape Canaveral, Fla., STS-114 Mission Specialists Stephen Robinson, Soichi Noguchi and Andrew Thomas check out the External Stowage Platform-2 (ESP2). Noguchi is with the Japanese Aerospace Exploration Agency. As payload on Space Shuttle Discovery?s Return to Flight mission, the ESP2 will carry replacement parts, known as orbital replacement units (ORU) to the International Space Station. The platform will be deployed and attached to the Station?s airlock and will be used as a permanent spare parts facility. The launch window for STS-114 is May 15 to June 3, 2005. Earlier, during CEIT in the Space Station Processing Facility, the crew also inspected the resupply stowage racks installed in the Italian-built Multi-Purpose Logistics Module Raffaello and performed tool and equipment interface checks with the Thermal Protection System (TPS) repair sample box, and the Control Moment Gyroscope (CMG) in preparation for the mission?s three scheduled spacewalks. The seven-member crew will fly to the Space Station primarily to evaluate procedures for flight safety, including Shuttle inspection and repair techniques.
Release Date 03/18/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - During Crew Equipment Interface Test (CEIT) at SPACEHAB in Cape Canaveral, Fla., STS-114 Mission Specialists Soichi Noguchi (left) and Andrew Thomas (right) check out a component on the External Stowage Platform-2 (ESP2). Noguchi is with the Japanese Aerospace Exploration Agency. As payload on Space Shuttle Discovery?s Return to Flight mission, the ESP2 will carry replacement parts, known as orbital replacement units (ORU) to the International Space Station. The platform will be deployed and attached to the Station?s airlock and will be used as a permanent spare parts facility. The launch window for STS-114 is May 15 to June 3, 2005. Earlier, during CEIT in the Space Station Processing Facility, the crew also inspected the resupply stowage racks installed in the Italian-built Multi-Purpose Logistics Module Raffaello and performed tool and equipment interface checks with the Thermal Protection System (TPS) repair sample box, and the Control Moment Gyroscope (CMG) in preparation for the mission?s three scheduled spacewalks. The seven-member crew will fly to the Space Station primarily to evaluate procedures for flight safety, including Shuttle inspection and repair techniques.
Release Date 03/18/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - After arriving at Kennedy Space Center?s Shuttle Landing Facility, STS-114 Mission Specialist Soichi Noguchi talks to the media. Noguchi is with the Japan Aerospace Exploration Agency. He and other crew members are taking part in the Terminal Countdown Demonstration Test (TCDT) over the next three days. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. This is Noguchi?s first space flight. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/01/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - After arriving at Kennedy Space Center?s Shuttle Landing Facility, STS-114 Mission Specialist Soichi Noguchi talks to the media. Noguchi is with the Japan Aerospace Exploration Agency. He and other crew members are taking part in the Terminal Countdown Demonstration Test (TCDT) over the next three days. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. This is Noguchi?s first space flight. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/01/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialist Soichi Noguchi arrives at NASA?s Kennedy Space Center aboard a T-38 jet training aircraft. Noguchi is with the Japan Aerospace Exploration Agency. He and other crew members are taking part in the Terminal Countdown Demonstration Test (TCDT) over the next three days. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. This is Noguchi?s first space flight. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/01/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - During Terminal Countdown Demonstration Test (TCDT) activities at NASA?s Kennedy Space Center, the STS-114 crew takes part in training on an M-113, an armored personnel carrier that is used for speedy departure from the launch pad in an emergency. Seated in the M-113, left to right, are Commander Eileen Collins, Mission Specialist Stephen Robinson, Capt. George Hoggard, astronaut rescue team leader, Mission Specialists Andrew Thomas, Soichi Noguchi and Charles Camarda, and Pilot James Kelly. Noguchi is with the Japan Aerospace Exploration Agency. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/02/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Dozens of media are gathered at the slidewire basket landing area on Launch Pad 39B to interview and hear comments from the STS-114 crew: Mission Specialists Andrew Thomas, Wendy Lawrence and Stephen Robinson, Commander Eileen Collins, Mission Specialists Charles Camarda and Soichi Noguchi, and Pilot James Kelly. Noguchi is with the Japan Aerospace Exploration Agency. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is designated the first Return to Flight mission, with a launch window extending from July 13 to July 31.
Release Date 05/03/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - On the Fixed Service Structure at Launch Pad 39B, the STS-114 crew gets instructions on using the slidewire basket, emergency egress equipment from the pad. Crew members seen here are (from lower left) Mission Specialist Wendy Lawrence, Commander Eileen Collins, Mission Specialist Soichi Noguchi, (on the right, from center) Mission Specialists Stephen Robinson, Charles Camarda and Andrew Thomas, and Pilot James Kelly. Noguchi is with the Japan Aerospace Exploration Agency. The training is part of Terminal Countdown Demonstration Test activities. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is designated the first Return to Flight mission, with a launch window extending from July 13 to July 31.
Release Date 05/03/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - On the Fixed Service Structure at Launch Pad 39B, the STS-114 crew gets instructions on using the slidewire basket, emergency egress equipment from the pad. Crew members seen here are (from left) Mission Specialists Andrew Thomas and Charles Camarda, Commander Eileen Collins, and Mission Specialists Soichi Noguchi and Wendy Lawrence. Noguchi is with the Japan Aerospace Exploration Agency. The training is part of Terminal Countdown Demonstration Test activities. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is designated the first Return to Flight mission, with a launch window extending from July 13 to July 31.
Release Date 05/03/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - During Terminal Countdown Demonstration Test (TCDT) activities, the STS-114 crew gets instructions about the White Room they are in. It is the point of entry into Space Shuttle Discovery. The crew, from left, are Commander Eileen Collins and Mission Specialists Charles Camarda, Wendy Lawrence, Soichi Noguchi and Stephen Robinson. Not seen are Pilot James Kelly and Mission Specialist Andrew Thomas. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is designated the first Return to Flight mission, with a launch window extending from July 13 to July 31.
Release Date 05/03/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - During Terminal Countdown Demonstration Test (TCDT) activities at NASA?s Kennedy Space Center, the STS-114 crew pauses during M-113 training at the launch pad. From left are Mission Specialist Andrew Thomas, Commander Eileen Collins, Mission Specialists Charles Camarda, Soichi Noguchi, Wendy Lawrence and Stephen Robinson, and Pilot James Kelly. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/02/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - On the Fixed Service Structure at Launch Pad 39B, STS-114 Mission Specialist Soichi Noguchi practices using a fire extinguisher. Noguchi is with the Japan Aerospace Exploration Agency. The training is part of Terminal Countdown Demonstration Test activities. Other crew members looking on, behind Noguchi, are Mission Specialists Charles Camarda and Andrew Thomas. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is designated the first Return to Flight mission, with a launch window extending from July 13 to July 31.
Release Date 05/03/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - During Terminal Countdown Demonstration Test (TCDT) activities at NASA?s Kennedy Space Center, STS-114 Mission Specialist Soichi Noguchi is ready to practice driving an M-113, an armored personnel carrier that is used for speedy departure from the launch pad in an emergency. Behind him at left is Capt. George Hoggard, who is astronaut rescue team leader. Noguchi is with the Japan Aerospace Exploration Agency.The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/02/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - During Terminal Countdown Demonstration Test (TCDT) activities at NASA?s Kennedy Space Center, STS-114 Mission Specialist Soichi Noguchi drives an M-113, an armored personnel carrier that is used for speedy departure from the launch pad in an emergency. Behind him at left is Capt. George Hoggard, who is astronaut rescue team leader. Noguchi is with the Japan Aerospace Exploration Agency. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/02/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-114 crew gathers for media questions at the slidewire basket landing area on Launch Pad 39B. Pilot James Kelly (far right) responds to a question. The other crew members are, from left, Mission Specialists Andrew Thomas, Wendy Lawrence and Stephen Robinson, Commander Eileen Collins, and Mission Specialists Charles Camarda and Soichi Noguchi, who is with the Japan Aerospace Exploration Agency. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is designated the first Return to Flight mission, with a launch window extending from July 13 to July 31.
Release Date 05/03/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - During Terminal Countdown Demonstration Test (TCDT) activities, the STS-114 crew poses for a photo at the entry hatch into Space Shuttle Discovery. At left is Pilot James Kelly. Those standing are Mission Specialists Charles Camarda, Wendy Lawrence, Soichi Noguchi and Andrew Thomas. In front of them are Commander Eileen Collins and Mission Specialist Stephen Robinson. Collins holds the mission patch. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is designated the first Return to Flight mission, with a launch window extending from July 13 to July 31.
Release Date 05/03/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - STS-114 Commander Eileen Collins leads the way as the next Space Shuttle crew does a practice walkout from the Operations and Checkout Building en route to Launch Pad 39B for a mock launch countdown culminating in a simulated main engine cutoff. In the left row, from front, are Pilot James Kelly and Mission Specialists Wendy Lawrence, Charles Camarda, and Andrew Thomas. In the right row, from front, are Collins and Mission Specialists Soichi Noguchi and Stephen Robinson. Noguchi is with the Japan Aerospace Exploration Agency. The dress rehearsal is part of Terminal Countdown Demonstration Test (TCDT) activities held prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - On the Fixed Service Structure at Launch Pad 39B, the STS-114 crew gets instructions on using the slidewire basket, emergency egress equipment from the pad. Crew members seen here are (from lower left) Mission Specialist Wendy Lawrence, Commander Eileen Collins, Mission Specialist Soichi Noguchi, (on the right, back to front) Mission Specialists Stephen Robinson, Charles Camarda and Andrew Thomas, and Pilot James Kelly. Noguchi is with the Japan Aerospace Exploration Agency. The training is part of Terminal Countdown Demonstration Test activities. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is designated the first Return to Flight mission, with a launch window extending from July 13 to July 31.
Release Date 05/03/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Outside the Operations and Checkout Building, STS-114 Commander Eileen Collins leads the way to the Astrovan that will transport the crew to Launch Pad 39B for a mock launch countdown culminating in a simulated main engine cutoff. In the left row, from front, are Pilot James Kelly and Mission Specialists Wendy Lawrence, Charles Camarda, and Andrew Thomas. In the right row, from front, are Collins and Mission Specialists Soichi Noguchi and Stephen Robinson. Noguchi is with the Japan Aerospace Exploration Agency. The dress rehearsal is part of Terminal Countdown Demonstration Test (TCDT) activities held prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-114 crew partakes of the traditional breakfast in the crew quarters at the Operations and Checkout (O&C) Building prior to suit-up for the trip to Launch Pad 39B for a mock launch countdown culminating in a simulated main engine cutoff. Seated, from left, are Mission Specialist Wendy Lawrence, Pilot James Kelly, Mission Specialist Soichi Noguchi, Commander Eileen Collins, and Mission Specialists Andrew Thomas, Stephen Robinson, and Charles Camarda. Noguchi is with the Japan Aerospace Exploration Agency. The dress rehearsal is part of Terminal Countdown Demonstration Test (TCDT) activities held prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-114 crew learn what to do if they need to leave the Space Shuttle in an emergency situation while on the pad, using the slidewire baskets that bring them to this landing area. Crew members are, from left, Mission Specialists Soichi Noguchi, Stephen Robinson, Andrew Thomas and Charles Camarda, Commander Eileen Collins, and Pilot James Kelly. Not pictured is Mission Specialist Wendy Lawrence. Noguchi is with the Japan Aerospace Exploration Agency. The training is part of Terminal Countdown Demonstration Test activities. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is designated the first Return to Flight mission, with a launch window extending from July 13 to July 31.
Release Date 05/03/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - With a member of the Closeout Crew following behind, STS-114 Mission Specialist Soichi Noguchi heads for the White Room on Launch Pad 39B, where he will complete adjustments to his launch suit before entering Space Shuttle Discovery. Noguchi is with the Japan Aerospace Exploration Agency. The crew is taking part in a full dress rehearsal for launch, including countdown and culminating in main engine cutoff. The rehearsal is the final part of Terminal Countdown Demonstration Test (TCDT) activities that the crew has been involved in for three days. TCDT provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialist Soichi Noguchi holds the mission patch that will be attached to Space Shuttle Discovery for flight. Noguchi is with the Japan Aerospace Exploration Agency. The crew is taking part in a full dress rehearsal for launch, including countdown and culminating in main engine cutoff. The rehearsal is the final part of Terminal Countdown Demonstration Test (TCDT) activities that the crew has been involved in for three days. TCDT provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - On the Fixed Service Structure at Launch Pad 39B, STS-114 Mission Specialists Stephen Robinson (left) and Soichi Noguchi (right) have climbed into the slidewire basket, emergency egress equipment from the pad. Watching them (in center) are Pilot James Kelly and Mission Specialist Andrew Thomas. Noguchi is with the Japan Aerospace Exploration Agency. The training is part of Terminal Countdown Demonstration Test activities. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is designated the first Return to Flight mission, with a launch window extending from July 13 to July 31.
Release Date 05/03/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - On the Fixed Service Structure at Launch Pad 39B, the STS-114 crew gets instructions on using the slidewire basket, emergency egress equipment from the pad. Crew members seen here are (from left) Mission Specialist Wendy Lawrence, Commander Eileen Collins and Mission Specialist Soichi Noguchi, who is with the Japan Aerospace Exploration Agency. The training is part of Terminal Countdown Demonstration Test activities. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is designated the first Return to Flight mission, with a launch window extending from July 13 to July 31.
Release Date 05/03/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-114 crew learn about exiting the slidewire basket at this landing area should they need to leave the Space Shuttle in an emergency situation while on the pad. Crew members seen here are (from left) Commander Eileen Collins and Mission Specialists Andrew Thomas, Soichi Noguchi, Wendy Lawrence, Stephen Robinson and Charles Camarda. Not pictured is Pilot James Kelly. Noguchi is with the Japan Aerospace Exploration Agency. The training is part of Terminal Countdown Demonstration Test activities. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is designated the first Return to Flight mission, with a launch window extending from July 13 to July 31.
Release Date 05/03/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-114 crew partakes of the traditional breakfast in the crew quarters at the Operations and Checkout (O&C) Building prior to suit-up for the trip to Launch Pad 39B for a mock launch countdown culminating in a simulated main engine cutoff. Seated, from left, are Mission Specialist Wendy Lawrence, Pilot James Kelly, Mission Specialist Soichi Noguchi, Commander Eileen Collins, and Mission Specialists Andrew Thomas, Stephen Robinson, and Charles Camarda. Noguchi is with the Japan Aerospace Exploration Agency. The dress rehearsal is part of Terminal Countdown Demonstration Test (TCDT) activities held prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialists Soichi Noguchi (left) and Charles Camarda are suited up in the Operations and Checkout Building and ready for the trip to Launch Pad 39B for a mock launch countdown culminating in a simulated main engine cutoff. Noguchi is with the Japan Aerospace Exploration Agency. The dress rehearsal is part of Terminal Countdown Demonstration Test (TCDT) activities held prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - A suit technician helps STS-114 Mission Specialist Soichi Noguchi suit up in the Operations and Checkout Building for the trip to Launch Pad 39B for a mock launch countdown culminating in a simulated main engine cutoff. Noguchi is with the Japan Aerospace Exploration Agency. The dress rehearsal is part of Terminal Countdown Demonstration Test (TCDT) activities held prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - At Launch Pad 39B, STS-114 Mission Specialist Soichi Noguchi (prone) inspects the payloads in Space Shuttle Discovery's payload bay. During its 12-day mission, Discovery?s seven-person crew will test new hardware and techniques to improve Shuttle safety, as well as deliver supplies to the International Space Station. Discovery?s payloads include the Multi-Purpose Logistics Module Raffaello, the Lightweight Multi-Purpose Experiment Support Structure Carrier (LMC), and the External Stowage Platform-2 (ESP-2). Raffaello will deliver supplies to the International Space Station including food, clothing and research equipment. The LMC will carry a replacement Control Moment Gyroscope and a tile repair sample box. The ESP-2 is outfitted with replacement parts. Launch of Discovery on its Return to Flight mission STS-114 is set for July 13.
Release Date 06/30/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - After their arrival at NASA?s Kennedy Space Center, the Return to Flight mission STS-114 crew talked briefly to media. Seen in the photo is Mission Specialist Charles Camarda. Other crew members are Mission Commander Eileen Collins, Pilot James Kelly, and Mission Specialists Soichi Noguchi, Wendy Lawrence, Andrew Thomas and Stephen Robinson. Noguchi is with the Japan Aerospace Exploration Agency, JAXA. The crew arrived a day early due to weather concerns associated with Hurricane Dennis. This historic mission is the 114th Space Shuttle flight and the 17th U.S. flight to the International Space Station. STS-114 is scheduled to launch at 3:51 p.m. July 13 and last about 12 days with a planned KSC landing at about 11:01 a.m. EDT on July 25. On mission STS-114, the crew will perform inspections on orbit for the first time of all of the Reinforced Carbon-Carbon (RCC) panels on the leading edge of the wings and the Thermal Protection System tiles using the new Canadian-built Orbiter Boom Sensor System and the data from 176 impact and temperature sensors. Mission Specialists will also practice repair techniques on RCC and tile samples during a spacewalk in the payload bay. During two additional spacewalks, the crew will install the External Stowage Platform-2, equipped with spare part assemblies, and a replacement Control Moment Gyroscope contained in the Lightweight Multi-Purpose Experiment Support Structure.
Release Date 07/09/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - After their arrival at NASA?s Kennedy Space Center, the Return to Flight mission STS-114 crew talked briefly to media. At the microphone is Mission Specialist Wendy Lawrence. Behind her (left to right) are Mission Specialist Andrew Thomas, Pilot James Kelly and Mission Specialist Soichi Noguchi, who is with the Japan Aerospace Exploration Agency, JAXA. Other crew members not pictured are Mission Commander Eileen Collins and Mission Specialists Charles Camarda and Stephen Robinson. The crew arrived a day early due to weather concerns associated with Hurricane Dennis. This historic mission is the 114th Space Shuttle flight and the 17th U.S. flight to the International Space Station. STS-114 is scheduled to launch at 3:51 p.m. July 13 and last about 12 days with a planned KSC landing at about 11:01 a.m. EDT on July 25. On mission STS-114, the crew will perform inspections on orbit for the first time of all of the Reinforced Carbon-Carbon (RCC) panels on the leading edge of the wings and the Thermal Protection System tiles using the new Canadian-built Orbiter Boom Sensor System and the data from 176 impact and temperature sensors. Mission Specialists will also practice repair techniques on RCC and tile samples during a spacewalk in the payload bay. During two additional spacewalks, the crew will install the External Stowage Platform-2, equipped with spare part assemblies, and a replacement Control Moment Gyroscope contained in the Lightweight Multi-Purpose Experiment Support Structure.
Release Date 07/09/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - After their arrival at NASA?s Kennedy Space Center, the Return to Flight mission STS-114 crew talked briefly to media. At the microphone is Mission Specialist Stephen Robinson. Behind him (left to right) are Mission Specialist Andrew Thomas, Pilot James Kelly and Mission Specialist Soichi Noguchi, who is with the Japan Aerospace Exploration Agency, JAXA. Other crew members not pictured are Mission Commander Eileen Collins and Mission Specialists Charles Camarda and Wendy Lawrence. The crew arrived a day early due to weather concerns associated with Hurricane Dennis. This historic mission is the 114th Space Shuttle flight and the 17th U.S. flight to the International Space Station. STS-114 is scheduled to launch at 3:51 p.m. July 13 and last about 12 days with a planned KSC landing at about 11:01 a.m. EDT on July 25. On mission STS-114, the crew will perform inspections on orbit for the first time of all of the Reinforced Carbon-Carbon (RCC) panels on the leading edge of the wings and the Thermal Protection System tiles using the new Canadian-built Orbiter Boom Sensor System and the data from 176 impact and temperature sensors. Mission Specialists will also practice repair techniques on RCC and tile samples during a spacewalk in the payload bay. During two additional spacewalks, the crew will install the External Stowage Platform-2, equipped with spare part assemblies, and a replacement Control Moment Gyroscope contained in the Lightweight Multi-Purpose Experiment Support Structure.
Release Date 07/09/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Center Director Jim Kennedy welcomes Mission Commander Eileen Collins to NASA?s Kennedy Space Center. She and the rest of the crew for Return to Flight mission STS-114 arrived aboard a Gulf Stream aircraft. The other crew members arriving are Pilot James Kelly and Mission Specialists Soichi Noguchi, Stephen Robinson, Andrew Thomas, Wendy Lawrence and Charles Camarda. Noguchi is with the Japan Aerospace Exploration Agency, JAXA. The crew arrived a day early due to weather concerns associated with Hurricane Dennis. This historic mission is the 114th Space Shuttle flight and the 17th U.S. flight to the International Space Station. STS-114 is scheduled to launch at 3:51 p.m. July 13 and last about 12 days with a planned KSC landing at about 11:01 a.m. EDT on July 25. On mission STS-114, the crew will perform inspections on orbit for the first time of all of the Reinforced Carbon-Carbon (RCC) panels on the leading edge of the wings and the Thermal Protection System tiles using the new Canadian-built Orbiter Boom Sensor System and the data from 176 impact and temperature sensors. Mission Specialists will also practice repair techniques on RCC and tile samples during a spacewalk in the payload bay. During two additional spacewalks, the crew will install the External Stowage Platform-2, equipped with spare part assemblies, and a replacement Control Moment Gyroscope contained in the Lightweight Multi-Purpose Experiment Support Structure.
Release Date 07/09/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building at NASA?s Kennedy Space Center, Return to Flight STS-114 Mission Specialist Soichi Noguchi checks the fit of his launch and entry suit and helmet. This is Noguchi?s first Shuttle flight. He represents the Japan Aerospace Exploration Agency (JAXA). There are two days to the launch of Space Shuttle Discovery scheduled for 3:51 p.m. July 13. This launch is the 114th Space Shuttle flight and is scheduled to last about 12 days with a planned KSC landing at about 11:06 a.m. EDT on July 25.
Release Date 07/11/2005
1 2
1-50 of 77