Browse All : Images by Sandra Magnus

Printer Friendly
1 2
1-50 of 93
     
     
Space Station Photo Op
STS-119 and Expedition 18 cr …
3/26/09
Description STS-119 and Expedition 18 crew members pose for a group photo in the Harmony node of the International Space Station while space shuttle Discovery was docked with the station. From the left (bottom row) are NASA astronauts Tony Antonelli, Lee Archambault and Joseph Acaba. From the left (middle row) are NASA astronauts Sandra Magnus and Michael Fincke, cosmonaut Yury Lonchakov and JAXA astronaut Koichi Wakata, both Expedition 18 flight engineers. From the left (top row) are NASA astronauts Steve Swanson, Richard Arnold and John Phillips. Photo credit: NASA March 24, 2009
Date 3/26/09
STS-135 New York City Visit …
nasa, nasaheadquartersflickr …
STS-135 crew members from ri …
6050823882_4584a1eb67_b
mediatype IMAGE
mediatype image
date 2011-08-16
creator NASA
identifier 6050823882_4584a1eb67_b
STS-135 New York City Visit …
nasa, nasaheadquartersflickr …
STS-135 Commander Chris Ferg …
6050821802_9b954fb954_b
mediatype IMAGE
mediatype image
date 2011-08-16
creator NASA
identifier 6050821802_9b954fb954_b
Chamitoff and Magnus in Kibo
johnsonspacecentermediaarchi …
STS-126 Mission Specialist G …
s126e008603
mediatype IMAGE
mediatype image
date 2008-11-20
creator NASA
identifier s126e008603
Magnus and Chamitoff in Node …
johnsonspacecentermediaarchi …
Expedition 18 Flight Enginee …
s126e008370
mediatype IMAGE
mediatype image
date 2008-11-19
creator NASA
identifier s126e008370
Atlantis STS-135 Rollout (20 …
nasa, nasaheadquartersflickr …
STS-135 crew members Chris F …
5785402923_de1227f618_o
mediatype IMAGE
mediatype image
date 2011-06-01
creator NASA
identifier 5785402923_de1227f618_o
STS-126 and Expedition 18 Cr …
johnsonspacecentermediaarchi …
STS-126 and Expedition 18 cr …
s126e008859
mediatype IMAGE
mediatype image
date 2008-11-21
creator NASA
identifier s126e008859
Kimbrough and Magnus on MDDK …
johnsonspacecentermediaarchi …
STS-126 Mission Specialists …
s126e005038
mediatype IMAGE
mediatype image
date 2008-11-15
creator NASA
identifier s126e005038
STS-126 and Expedition 18 Cr …
johnsonspacecentermediaarchi …
STS-126 and Expedition 18 cr …
s126e008877
mediatype IMAGE
mediatype image
date 2008-11-21
creator NASA
identifier s126e008877
Crewmembers Share Thanksgivi …
johnsonspacecentermediaarchi …
Crewmembers pose for a photo …
s126e012247
mediatype IMAGE
mediatype image
date 2008-11-27
creator NASA
identifier s126e012247
Kimbrough and Magnus on MDDK
johnsonspacecentermediaarchi …
STS-126 Mission Specialists …
s126e007618
mediatype IMAGE
mediatype image
date 2008-11-16
creator NASA
identifier s126e007618
Magnus and Chamitoff in Node …
johnsonspacecentermediaarchi …
Expedition 18 Flight Enginee …
s126e008372
mediatype IMAGE
mediatype image
date 2008-11-19
creator NASA
identifier s126e008372
Magnus and Kimbrough on MDDK …
johnsonspacecentermediaarchi …
STS-126 Mission Specialists …
s126e005024
mediatype IMAGE
mediatype image
date 2008-11-15
creator NASA
identifier s126e005024
STS-135 Launch Day (20110708 …
nasa, nasaheadquartersflickr …
James Branson of United Spac …
5916790492_e90133c036_b
mediatype IMAGE
mediatype image
date 2011-07-08
creator NASA
identifier 5916790492_e90133c036_b
STS-135 Launch Day (20110708 …
nasa, nasaheadquartersflickr …
The STS-135 crew, clockwise: …
5916791170_49f44e81d7_b
mediatype IMAGE
mediatype image
date 2011-07-08
creator NASA
identifier 5916791170_49f44e81d7_b
General Description STS-112 Shuttle Mission Imagery
General Description STS-112 Shuttle Mission Imagery
General Description STS-112 Shuttle Mission Imagery
General Description STS-112 Shuttle Mission Imagery
General Description STS-120 Shuttle Mission Imagery
General Description STS-120 Shuttle Mission Imagery
General Description COLUMBIA Shuttle Mission Imagery
General Description COLUMBIA Shuttle Mission Imagery
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- The STS-112 crew gathers in front of structures in the Space Station Processing Facility where they have been looking over part of the payload as part of the Crew Equipment Interface Test activities. From left are Commander Jeffrey Ashby, Pilot Pamela Melroy and Mission Specialists Sandra Magnus, David Wolf, Piers Sellers and Fyodor Yurchikhin, who is with the Russian Space Agency. The S1 truss is the first starboard (right-side) truss segment for the International Space Station, whose main job is providing structural support for the orbiting research facility's radiator panels that cool the Station's complex power system. The S1 truss segment also will house communications systems, external experiment positions and other subsystems. The S1 truss will be attached to the S0 truss. Launch of STS-112 is scheduled for Aug. 22, 2002
Release Date 06/15/2002
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Members of the STS-112 crew look over the S1 ITS, primary payload on their mission, as part of the Crew Equipment Interface Test. Seen at left are Mission Specialist Sandra Magnus, Pilot Pamela Melroy, below at right is Mission Specialist Piers Sellers. Mission STS-112 will be ferrying the S1 truss to the International Space Station on its scheduled Aug. 22 flight. The S1 truss is the first starboard (right-side) truss segment, whose main job is providing structural support for the orbiting research facility's radiator panels that cool the Space Station's complex power system. The S1 truss segment also will house communications systems, external experiment positions and other subsystems. The S1 truss will be attached to the S0 truss
Release Date 06/15/2002
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, STS-112 Pilot Pamela Melroy looks at equipment for the mission as part of the Crew Equipment Interface Test. Mission Specialist Sandra Magnus is behind her. Mission STS-112 will be ferrying the S1 truss to the International Space Station on its scheduled Aug. 22 flight. The S1 truss is the first starboard (right-side) truss segment, whose main job is providing structural support for the orbiting research facility's radiator panels that cool the Space Station's complex power system. The S1 truss segment also will house communications systems, external experiment positions and other subsystems. The S1 truss will be attached to the S0 truss
Release Date 06/15/2002
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- As part of the Crew Equipment Interface Test, members of the STS-112 crew look at the S1 Integrated Truss Structure, part of the payload for their mission to the International Space Station. From left are Pilot Pamela Melroy and Mission Specialists Piers Sellers and Sandra Magnus. At right, looking up, is Commander Jeffrey Ashby. The S1 truss is the first starboard (right-side) truss segment, whose main job is providing structural support for the orbiting research facility's radiator panels that cool the Space Station's complex power system. The S1 truss segment also will house communications systems, external experiment positions and other subsystems. The S1 truss will be attached to the S0 truss. Launch of STS-112 is scheduled for Aug. 22, 2002
Release Date 06/15/2002
KENNEDY SPACE CENTER, Fla. - …
Description KENNEDY SPACE CENTER, Fla. - The STS-112 crew poses for a photo on the back of the M-113 armored personnel carrier they practiced driving as part of Terminal Countdown Demonstration Test activities. From left are Mission Specialist David Wolf, Pilot Pamela Melroy, Mission Specialist Sandra Magnus, Commander Jeffrey Ashby, and Mission Specialists Piers Sellers and Fyodor Yurchikhin, who is with the Russian Space Agency. Mission STS-112 aboard Space Shuttle Atlantis is scheduled to launch no earlier than Oct. 2, between 2 and 6 p.m. EDT. STS-112 is the 15th assembly mission to the International Space Station. Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment. The S1 will be attached to the central truss segment, S0, during the 11-day mission.
Release Date 09/16/2002
KENNEDY SPACE CENTER, Fla. - …
Description KENNEDY SPACE CENTER, Fla. - STS-112 Mission Specialist Sandra Magnus is ready for her practice run driving the M-113 armored personnel carrier. Magnus and the rest of the crew are at KSC for Terminal Countdown Demonstration Test activities, which also include a simulated launch countdown. Mission STS-112 aboard Space Shuttle Atlantis is scheduled to launch no earlier than Oct. 2, between 2 and 6 p.m. EDT. STS-112 is the 15th assembly mission to the International Space Station. Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment. The S1 will be attached to the central truss segment, S0, during the 11-day mission.
Release Date 09/16/2002
KENNEDY SPACE CENTER, Fla. - …
Description KENNEDY SPACE CENTER, Fla. - STS-112 Commander Jeffrey Ashby drives the M-113 armored personnel carrier during Terminal Countdown Demonstration Test activities. At the far left is Mission Specialist Sandra Magnus. The TCDT also includes a simulated launch countdown. The mission aboard Space Shuttle Atlantis is scheduled to launch no earlier than Oct. 2, between 2 and 6 p.m. EDT. STS-112 is the 15th assembly mission to the International Space Station. Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment. The S1 will be attached to the central truss segment, S0, during the 11-day mission.
Release Date 09/16/2002
KENNEDY SPACE CENTER, Fla. - …
Description KENNEDY SPACE CENTER, Fla. - STS-112 Mission Specialist Sandra Magnus takes her turn driving the M-113 armored personnel carrier. Space Shuttle Atlantis is in the background. Magnus and the rest of the crew are at KSC for Terminal Countdown Demonstration Test activities, which also include a simulated launch countdown. Mission STS-112 aboard Space Shuttle Atlantis is scheduled to launch no earlier than Oct. 2, between 2 and 6 p.m. EDT. STS-112 is the 15th assembly mission to the International Space Station. Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment. The S1 will be attached to the central truss segment, S0, during the 11-day mission.
Release Date 09/16/2002
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, astronauts are getting first-hand experience with the fluid experiment rack of the Japanese Experiment Module, or JEM, part of the mission payload to the International Space Station. At center is Sandra Magnus who will join the Expedition 17 crew on the International Space Station in 2008 after the arrival of the JEM. The JEM comprises six components: two research facilities -- the Pressurized Module and Exposed Facility, a Logistics Module attached to each of them, a Remote Manipulator System, and an Inter-Orbit Communication System unit. The various components of JEM will be assembled in space over the course of three Space Shuttle missions. The first of those three missions, STS-123, will carry the Experiment Logistics Module Pressurized Section aboard the Space Shuttle Endeavour, targeted for launch in February 2008. Photo credit: NASA/Jim Grossmann
Release Date 05/14/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, astronauts are getting first-hand experience with the fluid experiment rack of the Japanese Experiment Module, or JEM, part of the mission payload to the International Space Station. Seen here at right is Sandra Magnus who will join the Expedition 17 crew on the International Space Station in 2008 after the arrival of the JEM. The JEM comprises six components: two research facilities -- the Pressurized Module and Exposed Facility, a Logistics Module attached to each of them, a Remote Manipulator System, and an Inter-Orbit Communication System unit. The various components of JEM will be assembled in space over the course of three Space Shuttle missions. The first of those three missions, STS-123, will carry the Experiment Logistics Module Pressurized Section aboard the Space Shuttle Endeavour, targeted for launch in February 2008. Photo credit: NASA/Jim Grossmann
Release Date 05/14/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, astronauts are getting first-hand experience with the fluid experiment rack of the Japanese Experiment Module, or JEM, part of the mission payload to the International Space Station. Seen here is Sandra Magnus who will join the Expedition 17 crew on the International Space Station in 2008. The JEM comprises six components: two research facilities -- the Pressurized Module and Exposed Facility, a Logistics Module attached to each of them, a Remote Manipulator System, and an Inter-Orbit Communication System unit. The various components of JEM will be assembled in space over the course of three Space Shuttle missions. The first of those three missions, STS-123, will carry the Experiment Logistics Module Pressurized Section aboard the Space Shuttle Endeavour, targeted for launch in February 2008. Photo credit: NASA/Jim Grossmann
Release Date 05/14/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Members of the STS-114 crew pose for a photo during training. Standing left to right are Pilot James Kelly, Mission Specialist Soichi Noguchi, Commander Eileen Collins and Mission Specialist Stephen Robinson. At far right is Mission Specialist Sandra Magnus, a member of the STS-112 crew. Noguchi is with the National Space and Development Agency of Japan. STS-114 is a utilization and logistics flight that will carry Multi-Purpose Logistics Module Raffaello and the External Stowage Platform (ESP-2), plus the Expedition 7 crew to the International Space Station. Launch of STS-114 is currently scheduled for January 2003
Release Date 12/11/2001
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- The STS-112 crew pauses for a photo in the White Room during Terminal Countdown Demonstration Test activities. From left, clockwise, are Mission Specialists Piers Sellers and Sandra Magnus, Pilot Pamela Melroy, Commander Jeffrey Ashby and Mission Specialists Fyodor Yurchikhin and David Wolf. Ashby is holding the mission insignia. Yurchikhin is with the Russian Space Agency. Mission STS-112 aboard Space Shuttle Atlantis is scheduled to launch no earlier than Oct. 2, between 2 and 6 p.m. EDT. STS-112 is the 15th assembly mission to the International Space Station. Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment, to be attached to the central truss segment, S0, and the Crew and Equipment Translation Aid (CETA) Cart A. The CETA is the first of two human-powered carts that will ride along the ISS railway, providing mobile work platforms for future spacewalking astronauts.
Release Date 09/17/2002
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Members of the STS-112 crew stand inside a slidewire basket, a component of the emergency egress system at the pad. From left are Mission Specialists Sandra Magnus, Fyodor Yurchikhin (with the Russian Space Agency), and Piers Sellers. The training is part of Terminal Countdown Demonstration Test activities, which include a simulated launch countdown. Mission STS-112 aboard Space Shuttle Atlantis is scheduled to launch no earlier than Oct. 2, between 2 and 6 p.m. EDT. STS-112 is the 15th assembly mission to the International Space Station. Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment, to be attached to the central truss segment, S0, and the Crew and Equipment Translation Aid (CETA) Cart A. The CETA is the first of two human-powered carts that will ride along the ISS railway, providing mobile work platforms for future spacewalking astronauts.
Release Date 09/17/2002
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- The STS-112 crew pauses for a photo in the White Room during Terminal Countdown Demonstration Test activities. Kneeling in front are Mission Specialists Piers Sellers and David Wolf, standing, left to right, are Mission Specialist Sandra Magnus, Pilot Pamela Melroy, Commander Jeffrey Ashby and Mission Specialist Fyodor Yurchikhin. (with the Russian Space Agency). Mission STS-112 aboard Space Shuttle Atlantis is scheduled to launch no earlier than Oct. 2, between 2 and 6 p.m. EDT. STS-112 is the 15th assembly mission to the International Space Station. Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment, to be attached to the central truss segment, S0, and the Crew and Equipment Translation Aid (CETA) Cart A. The CETA is the first of two human-powered carts that will ride along the ISS railway, providing mobile work platforms for future spacewalking astronauts.
Release Date 09/17/2002
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- The STS-112 crew listen to further instructions about emergency egress from the Shuttle. Standing, left to right, are Mission Specialist Piers Sellers, Commander Jeffrey Ashby, Pilot Pamela Melroy, Mission Specialists Fyodor Yurchikhin (with the Russian Space Agency), David Wolf and Sandra Magnus. The training is part of Terminal Countdown Demonstration Test activities, which include a simulated launch countdown. Mission STS-112 aboard Space Shuttle Atlantis is scheduled to launch no earlier than Oct. 2, between 2 and 6 p.m. EDT. STS-112 is the 15th assembly mission to the International Space Station. Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment, to be attached to the central truss segment, S0, and the Crew and Equipment Translation Aid (CETA) Cart A. The CETA is the first of two human-powered carts that will ride along the ISS railway, providing mobile work platforms for future spacewalking astronauts.
Release Date 09/17/2002
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- During Terminal Countdown Demonstration Test activities, the STS-112 crew poses for a group photo near the launch pad where Space Shuttle Atlantis waits for launch. Standing left to right are Mission Specialist Piers Sellers, Commander Jeffrey Ashby, Mission Specialist David Wolf, Pilot Pamela Melroy, and Mission Specialists Sandra Magnus and Fyodor Yurchikhin, who is with the Russian Space Agency. The TCDT includes emergency egress training and a simulated launch countdown. Mission STS-112 aboard Space Shuttle Atlantis is scheduled to launch no earlier than Oct. 2, between 2 and 6 p.m. EDT. STS-112 is the 15th assembly mission to the International Space Station. Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment, to be attached to the central truss segment, S0, and the Crew and Equipment Translation Aid (CETA) Cart A. The CETA is the first of two human-powered carts that will ride along the ISS railway, providing mobile work platforms for future spacewalking astronauts.
Release Date 09/17/2002
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - During emergency egress practice on the 195-foot level of the Fixed Service Structure, Launch Pad 39B, STS-112 Mission Specialist Sandra Magnus opens her helmet visor. She and the rest of the crew are taking part in Terminal Countdown Demonstration Test activities, which include a simulated launch countdown. Mission STS-112 aboard Space Shuttle Atlantis is scheduled to launch no earlier than Oct. 2, between 2 and 6 p.m. EDT. STS-112 is the 15th assembly mission to the International Space Station. Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment, to be attached to the central truss segment, S0, and the Crew and Equipment Translation Aid (CETA) Cart A. The CETA is the first of two human-powered carts that will ride along the ISS railway, providing mobile work platforms for future spacewalking astronauts.
Release Date 09/18/2002
KENNEDY SPACE CENTER, Fla. - …
Description KENNEDY SPACE CENTER, Fla. - STS-112 Mission Specialist Sandra Magnus gets help donning her boots during suit check, part of Terminal Countdown Demonstration Test activities. The TCDT also includes emergency egress training and a simulated launch countdown. The mission aboard Space Shuttle Atlantis is scheduled to launch no earlier than Oct. 2, between 2 and 6 p.m. EDT. STS-112 is the 15th assembly mission to the International Space Station. Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment. The S1 will be attached to the central truss segment, S0, during the 11-day mission. Magnus will serve as one of two operators of the Canadarm2 robotic arm for S1 truss installation and during three scheduled spacewalks. STS-112 is her first Shuttle flight.
Release Date 09/16/2002
KENNEDY SPACE CENTER, Fla. - …
Description KENNEDY SPACE CENTER, Fla. - STS-112 Mission Specialist Sandra Magnus has her helmet adjusted during suit check, part of Terminal Countdown Demonstration Test activities. The TCDT also includes emergency egress training and a simulated launch countdown. The mission aboard Space Shuttle Atlantis is scheduled to launch no earlier than Oct. 2, between 2 and 6 p.m. EDT. STS-112 is the 15th assembly mission to the International Space Station. Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment. The S1 will be attached to the central truss segment, S0, during the 11-day mission. Magnus will serve as one of two operators of the Canadarm2 robotic arm for S1 truss installation and during three scheduled spacewalks. STS-112 is her first Shuttle flight.
Release Date 09/16/2002
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- The STS-112 crew listen to further instructions about emergency egress from the Shuttle using the slidewire basket. In the basket are Mission Specialists Sandra Magnus, Fyodor Yurchikhin (with the Russian Space Agency), and Piers Sellers. At left are Mission Specialist David Wolf and Pilot Pamela Melroy, at right is Commander Jeffrey Ashby. The training is part of Terminal Countdown Demonstration Test activities, which include a simulated launch countdown. Mission STS-112 aboard Space Shuttle Atlantis is scheduled to launch no earlier than Oct. 2, between 2 and 6 p.m. EDT. STS-112 is the 15th assembly mission to the International Space Station. Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment, to be attached to the central truss segment, S0, and the Crew and Equipment Translation Aid (CETA) Cart A. The CETA is the first of two human-powered carts that will ride along the ISS railway, providing mobile work platforms for future spacewalking astronauts.
Release Date 09/17/2002
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- STS-112 Commander Jeffrey Ashby, Mission Specialist Sandra Magnus, and Pilot Pamela Melroy take a momentary break from training at Pad 39B during Terminal Countdown Demonstration Test activities, which include a simulated launch countdown. Launch of STS-112 aboard Space Shuttle Atlantis is scheduled for Oct. 2, between 2 and 6 p.m. EDT. STS-112 is the 15th assembly mission to the International Space Station. Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment, to be attached to the central truss segment, S0, and the Crew and Equipment Translation Aid (CETA) Cart A. The CETA is the first of two human-powered carts that will ride along the ISS railway, providing mobile work platforms for future spacewalking astronauts.
Release Date 09/18/2002
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - STS-112 Mission Specialist Sandra Magnus (left) sits in the slidewire basket basket on the 195-foot level of the Fixed Service Structure, Launch Pad 39B, while Mission Specialist Piers Sellers (right) reaches for the release lever. They and the rest of the crew are practicing emergency egress from the pad during Terminal Countdown Demonstration Test activities. Mission STS-112 aboard Space Shuttle Atlantis is scheduled to launch no earlier than Oct. 2, between 2 and 6 p.m. EDT. STS-112 is the 15th assembly mission to the International Space Station. Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment, to be attached to the central truss segment, S0, and the Crew and Equipment Translation Aid (CETA) Cart A. The CETA is the first of two human-powered carts that will ride along the ISS railway, providing mobile work platforms for future spacewalking astronauts.
Release Date 09/18/2002
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- During emergency egress training from the launch pad, the STS-112 crew look at the slidewire basket. Seen here are, left to right, Commander Jeffrey Ashby, Pilot Pamela Melroy and Mission Specialists Sandra Magnus and Fyodor Yurchikhin (with the Russian Space Agency). Not seen are Mission Specialists Piers Sellers and David Wolf. The training is part of Terminal Countdown Demonstration Test activities, which include a simulated launch countdown. Mission STS-112 aboard Space Shuttle Atlantis is scheduled to launch no earlier than Oct. 2, between 2 and 6 p.m. EDT. STS-112 is the 15th assembly mission to the International Space Station. Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment, to be attached to the central truss segment, S0, and the Crew and Equipment Translation Aid (CETA) Cart A. The CETA is the first of two human-powered carts that will ride along the ISS railway, providing mobile work platforms for future spacewalking astronauts.
Release Date 09/17/2002
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- During emergency egress training from the launch pad, the STS-112 crew get instructions on using the slidewire basket. From left, Mission Specialist Piers Sellers (back to camera), Pilot Pamela Melroy, Mission Specialists Sandra Magnus and Fyodor Yurchikhin (with the Russian Space Agency), watch as Commander Jeffrey Ashby (below right) grabs the release lever. Not seen is Mission Specialist David Wolf. The training is part of Terminal Countdown Demonstration Test activities, which include a simulated launch countdown. Mission STS-112 aboard Space Shuttle Atlantis is scheduled to launch no earlier than Oct. 2, between 2 and 6 p.m. EDT. STS-112 is the 15th assembly mission to the International Space Station. Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment, to be attached to the central truss segment, S0, and the Crew and Equipment Translation Aid (CETA) Cart A. The CETA is the first of two human-powered carts that will ride along the ISS railway, providing mobile work platforms for future spacewalking astronauts.
Release Date 09/17/2002
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- During emergency egress training from the launch pad, the STS-112 crew listens to a trainer about use of the system. The crew members are, from left in the center, Commander Jeffrey Ashby, Mission Specialists Sandra Magnus, Piers Sellers and Fyodor Yurchikhin, and Pilot Pamela Melroy. In the foreground, left, is Mission Specialist David Wolf. Yurchikhin is with the Russian Space Agency. The training is part of Terminal Countdown Demonstration Test activities, which include a simulated launch countdown. Mission STS-112 aboard Space Shuttle Atlantis is scheduled to launch no earlier than Oct. 2, between 2 and 6 p.m. EDT. STS-112 is the 15th assembly mission to the International Space Station. Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment, to be attached to the central truss segment, S0, and the Crew and Equipment Translation Aid (CETA) Cart A. The CETA is the first of two human-powered carts that will ride along the ISS railway, providing mobile work platforms for future spacewalking astronauts.
Release Date 09/17/2002
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- STS-112 Mission Specialist Sandra Magnus takes a break during emergency egress practice on the 195-foot level of the Fixed Service Structure, Launch Pad 39B. She and the rest of the crew are taking part in Terminal Countdown Demonstration Test activities, which include a simulated launch countdown. Mission STS-112 aboard Space Shuttle Atlantis is scheduled to launch no earlier than Oct. 2, between 2 and 6 p.m. EDT. STS-112 is the 15th assembly mission to the International Space Station. Atlantis will be carrying the S1 Integrated Truss Structure, the first starboard truss segment, to be attached to the central truss segment, S0, and the Crew and Equipment Translation Aid (CETA) Cart A. The CETA is the first of two human-powered carts that will ride along the ISS railway, providing mobile work platforms for future spacewalking astronauts.
Release Date 09/18/2002
1 2
1-50 of 93