Browse All : Images by Koichi Wakata of Florida and Kennedy Space Center (KSC)

Printer Friendly
1 2 3
1-50 of 138
     
     
Ready to Rehearse
The STS-119 crew flew to NAS …
1/19/09
Description The STS-119 crew flew to NASA's Kennedy Space Center in Florida to take part in terminal countdown demonstration test activities, which include equipment familiarization and emergency exit training and culminate in a simulated launch countdown. After their arrival at the Shuttle Landing Facility, the astronauts took part in a question-and-answer session with the media. Mission Specialist Koichi Wakata (far right) responds to a Japanese reporter. Wakata represents the Japan Aerospace Exploration Agency and will remain on the International Space Station as a member of the Expedition 18 crew. Image credit: NASA/Kim Shiflett Jan. 19, 2009
Date 1/19/09
STS-92 - Discovery Fly-away …
Title STS-92 - Discovery Fly-away - return to Florida
Description Carrying the Space Shuttle Discovery piggyback, one of NASA's modified Boeing 747 Shuttle Carrier Aircraft lifts off the runway at Edwards Air Force Base, California. The Discovery was ferried from NASA's Dryden Flight Research Center at Edwards to NASA's Kennedy Space Center in Florida on November 2, 2000, after extensive post-landing servicing and ferry flight preparations. STS-92 was the 100th mission since the fleet of four Space Shuttles began flying in 1981. (Due to schedule changes, missions are not always launched in the order that was originally planned.) The almost 13-day mission, the 46th Shuttle mission to land at Edwards, was the last construction mission for the International Space Station prior to the first scientists taking up residency in the orbiting space laboratory the following month. The seven-member crew on STS-92 included mission specialists Koichi Wakata, Michael Lopez-Alegria, Jeff Wisoff, Bill McArthur and Leroy Chiao, pilot Pam Melroy and mission commander Brian Duffy.
Date 11.02.2000
STS-92 - Discovery Fly-away …
Title STS-92 - Discovery Fly-away - return to Florida
Description One of NASA's two modified Boeing 747 Shuttle Carrier Aircraft with the Space Shuttle orbiter Discovery on its back climbs out after takeoff from Edwards Air Force Base, California. The Discovery was ferried from NASA's Dryden Flight Research Center at Edwards to NASA's Kennedy Space Center in Florida on November 2, 2000, after extensive post-landing servicing and ferry flight preparations. STS-92 was the 100th mission since the fleet of four Space Shuttles began flying in 1981. (Due to schedule changes, missions are not always launched in the order that was originally planned.) The almost 13-day mission, the 46th Shuttle mission to land at Edwards, was the last construction mission for the International Space Station prior to the first scientists taking up residency in the orbiting space laboratory the following month. The seven-member crew on STS-92 included mission specialists Koichi Wakata, Michael Lopez-Alegria, Jeff Wisoff, Bill McArthur and Leroy Chiao, pilot Pam Melroy and mission commander Brian Duffy.
Date 11.02.2000
STS-92 - Orbiter in Mate-Dem …
Title STS-92 - Orbiter in Mate-Demate Device (MDD)
Description The early-morning Sun bathes the Space Shuttle Discovery in hues of purple, pink and gold as it is encased in the Mate-Demate Device (MDD) at NASA's Dryden Flight Research Center at Edwards, California. The gantry-like MDD structure is used to prepare the shuttle for its ferry flight back to the Kennedy space Center in Florida, including mounting the shuttle atop NASA's modified Boeing 747 Shuttle Carrier Aircraft. STS-92 was the 100th mission since the fleet of four Space Shuttles began flying in 1981. (Due to schedule changes, missions are not always launched in the order that was originally planned.) The almost 13-day mission, the 46th Shuttle mission to land at Edwards, was the last construction mission for the International Space Station prior to the first scientists taking up residency in the orbiting space laboratory the following month. The seven-member crew on STS-92 included mission specialists Koichi Wakata, Michael Lopez-Alegria, Jeff Wisoff, Bill McArthur and Leroy Chiao, pilot Pam Melroy and mission commander Brian Duffy.
Date 10.29.2000
STS-92 - Orbiter in Mate-Dem …
Title STS-92 - Orbiter in Mate-Demate Device (MDD) - closeup view from front
Description The Space Shuttle Discovery is centered in the Mate-Demate Device (MDD) at NASA's Dryden Flight Research Center at Edwards, California. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA's modified Boeing 747 Shuttle Carrier Aircraft. STS-92 was the 100th mission since the fleet of four Space Shuttles began flying in 1981. (Due to schedule changes, missions are not always launched in the order that was originally planned.) The almost 13-day mission was the last construction mission for the International Space Station prior to the first scientists taking up residency in the orbiting space laboratory the following month. The seven-member crew on STS-92 included mission specialists Koichi Wakata, Michael Lopez-Alegria, Jeff Wisoff, Bill McArthur and Leroy Chiao, pilot Pam Melroy and mission commander Brian Duffy.
Date 10.29.2000
STS-92 - Orbiter in Mate-Dem …
Title STS-92 - Orbiter in Mate-Demate Device (MDD) at sunrise with Shuttle Carrier Aircraft (SCA) in backg
Description The early-morning Sun provides a golden backdrop to the Space Shuttle Discovery encased in the Mate-Demate Device (MDD) at NASA's Dryden Flight Research Center at Edwards, California. The gantry-like MDD structure is used to prepare the shuttle for its ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA's modified Boeing 747 Shuttle Carrier Aircraft. STS-92 was the 100th mission since the fleet of four Space Shuttles began flying in 1981. (Due to schedule changes, missions are not always launched in the order that was originally planned.) The almost 13-day mission was the last construction mission for the International Space Station prior to the first scientists taking up residency in the orbiting space laboratory the following month. The seven-member crew on STS-92 included mission specialists Koichi Wakata, Michael Lopez-Alegria, Jeff Wisoff, Bill McArthur and Leroy Chiao, pilot Pam Melroy and mission commander Brian Duffy.
Date 10.29.2000
STS-92 - Orbiter in Mate-Dem …
Title STS-92 - Orbiter in Mate-Demate Device (MDD) at sunrise with Shuttle Carrier Aircraft (SCA) in backg
Description The early-morning Sun bathes the Space Shuttle Discovery in hues of purple, pink and gold as it is encased in the Mate-Demate Device (MDD) at NASA's Dryden Flight Research Center at Edwards, California. The gantry-like MDD structure is used to prepare the shuttle for its ferry flight back to the Kennedy space Center in Florida, including mounting the shuttle atop NASA's modified Boeing 747 Shuttle Carrier Aircraft. STS-92 was the 100th mission since the fleet of four Space Shuttles began flying in 1981. (Due to schedule changes, missions are not always launched in the order that was originally planned.) The almost 13-day mission, the 46th Shuttle mission to land at Edwards, was the last construction mission for the International Space Station prior to the first scientists taking up residency in the orbiting space laboratory the following month. The seven-member crew on STS-92 included mission specialists Koichi Wakata, Michael Lopez-Alegria, Jeff Wisoff, Bill McArthur and Leroy Chiao, pilot Pam Melroy and mission commander Brian Duffy.
Date 10.29.2000
STS-92 - Shuttle Carrier Air …
Title STS-92 - Shuttle Carrier Aircraft (SCA)
Description One of NASA's two modified Boeing 747 Shuttle Carrier Aircraft is bathed in the morning Sun at NASA's Dryden Flight Research Center at Edwards, California. The modified jumbo jetliners are used to ferry the Space Shuttle orbiters between Dryden and the Kennedy Space Center in Florida and Boeing's Reusable Space Systems modification facility at Palmdale, California. Features which distinguish the two SCAs from standard 747 jetliners are three struts, with associated interior structural strengthening, which protrude from the top of the fuselage (two aft, one forward) on which the orbiter is attached, and two additional vertical stabilizers, one on each end of the standard horizontal stabilizer, to enhance directional stability. All interior furnishings and equipment aft of the forward No. 1 doors have also been removed to reduce weight. The two SCAs are under the operational control of NASA's Johnson Space Center, Houston, Texas. STS-92 was the 100th mission since the fleet of four Space Shuttles began flying in 1981. (Due to schedule changes, missions are not always launched in the order that was originally planned.) The almost 13-day mission, the 46th Shuttle mission to land at Edwards, was the last construction mission for the International Space Station prior to the first scientists taking up residency in the orbiting space laboratory the following month. The seven-member crew on STS-92 included mission specialists Koichi Wakata, Michael Lopez-Alegria, Jeff Wisoff, Bill McArthur and Leroy Chiao, pilot Pam Melroy and mission commander Brian Duffy.
Date 10.29.2000
STS-92 - Towing of Shuttle D …
Title STS-92 - Towing of Shuttle Discovery and Boeing 747 Shuttle Carrier Aircraft (SCA)
Description The Space Shuttle Discovery sits atop one of NASA's modified Boeing 747 Shuttle Carrier Aircraft as the unusual piggyback duo is towed along a taxiway at NASA's Dryden Flight Research Center at Edwards, California. The Discovery was ferried from NASA Dryden to NASA's Kennedy Space Center in Florida on November 2, 2000, after extensive pre-ferry servicing and preparations. STS-92 was the 100th mission since the fleet of four Space Shuttles began flying in 1981. (Due to schedule changes, missions are not always launched in the order that was originally planned.) The almost 13-day mission, the 46th Shuttle mission to land at Edwards, was the last construction mission for the International Space Station prior to the first scientists taking up residency in the orbiting space laboratory the following month. The seven-member crew on STS-92 included mission specialists Koichi Wakata, Michael Lopez-Alegria, Jeff Wisoff, Bill McArthur and Leroy Chiao, pilot Pam Melroy and mission commander Brian Duffy.
Date 11.02.2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Members of the STS-92 crew pose for the photographer during a break from checking out Discovery's payload bay in the Orbiter Processing Facility bay 1. Their mission, the fourth U.S. flight to the ISS, includes as payload the Integrated Truss Structure Z1, an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power, Ku-band communication to support early science capability and U.S. television, and PMA-3 to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The crew comprises Mission Commander Brian Duffy, Pilot Pamela Melroy, and Mission Specialists Koichi Wakata, Leroy Chiao, Peter "Jeff" Wisoff, Michael Lopez-Alegria, and William McArthur. Launch of STS-92 is scheduled for Sept. 21, 2000. Wakata is with the National Space Development Agency of Japan
Release Date 04/20/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Members of the STS-92 crew take a moment for discussion while checking out the payload bay of the orbiter Discovery in the Orbiter Processing Facility bay 1. Their mission, the fourth U.S. flight to the ISS, includes as payload the Integrated Truss Structure Z1, an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power, Ku-band communication to support early science capability and U.S. television, and PMA-3 to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The crew comprises Mission Commander Brian Duffy, Pilot Pamela Melroy, and Mission Specialists Koichi Wakata, Leroy Chiao, Peter "Jeff" Wisoff, Michael Lopez-Alegria, and William McArthur. Launch of STS-92 is scheduled for Sept. 21, 2000. Wakata is with the National Space Development Agency of Japan
Release Date 04/20/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, members of the STS-92 crew examine equipment that will be part of their mission to the International Space Station (ISS). The fourth U.S. flight to the ISS, the mission payload includes the Integrated Truss Structure Z1, an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power, Ku-band communication to support early science capability and U.S. television, and PMA-3 to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The crew comprises Mission Commander Brian Duffy, Pilot Pamela Melroy, and Mission Specialists Koichi Wakata, Leroy Chiao, Peter "Jeff" Wisoff, Michael Lopez-Alegria, and William McArthur. Launch of STS-92 is scheduled for Sept. 21, 2000. Wakata is with the National Space Development Agency of Japan.
Release Date 04/20/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility bay 1, members of the STS-92 crew examine equipment that will be part of their mission to the International Space Station (ISS). The fourth U.S. flight to the ISS, the mission payload includes the Integrated Truss Structure Z1, an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power, Ku-band communication to support early science capability and U.S. television, and PMA-3 to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The crew comprises Mission Commander Brian Duffy, Pilot Pamela Melroy, and Mission Specialists Koichi Wakata, Leroy Chiao, Peter "Jeff" Wisoff, Michael Lopez-Alegria, and William McArthur. Launch of STS-92 is scheduled for Sept. 21, 2000. Wakata is with the National Space Development Agency of Japan
Release Date 04/20/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, members of the STS-92 crew get a close look at some of the equipment, such as the Integrated Truss Structure Z1, to fly on their mission. STS-92 is the fifth U.S. flight in the construction of the International Space Station. At left is Commander Brian Duffy, with their backs to the camera are Mission Specialist Koichi Wakata and Pilot Pamela A. Melroy. The Z1 is an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. Another part of the payload is a pressurized mating adapter, PMA-3, to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The other crew members are Mission Specialists Leroy Chiao, Peter J.K. Wisoff, Michael E. Lopez-Alegria, and William S. McArthur Jr. Wakata is with the National Space Development Agency of Japan. Launch of STS-92 is scheduled for Sept. 21, 2000
Release Date 04/21/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, members of the STS-92 crew get a close look at some of the equipment, such as the Integrated Truss Structure Z1, to fly on their mission. STS-92 is the fifth U.S. flight in the construction of the International Space Station. At left is Pilot Pamela A. Melroy, at right is Mission Specialist Koichi Wakata, who is with the National Space Development Agency of Japan. The Z1 is an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. Another part of the payload is a pressurized mating adapter, PMA-3, to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The other crew members are Mission Commander Brian Duffy and Mission Specialists Leroy Chiao, Peter J.K. Wisoff, Michael E. Lopez-Alegria, and William S. McArthur Jr. Launch of STS-92 is scheduled for Sept. 21, 2000
Release Date 04/21/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, members of the STS-92 crew get a close look at some of the equipment, such as the Integrated Truss Structure Z1, to fly on their mission. STS-92 is the fifth U.S. flight in the construction of the International Space Station. At left is Mission Specialist Koichi Wakata, who is with the National Space Development Agency of Japan. The Z1 is an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. Another part of the payload is a pressurized mating adapter, PMA-3, to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The other crew members are Mission Commander Brian Duffy, Pilot Pamela A. Melroy, and Mission Specialists Leroy Chiao, Peter J.K. Wisoff, Michael E. Lopez-Alegria, and William S. McArthur Jr. Launch of STS-92 is scheduled for Sept. 21, 2000
Release Date 04/21/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- The STS-92 crew pose in front of the Integrated Truss Structure Z1, an element of the International Space Station that will be part of the mission payload. STS-92 is the fifth U.S. flight in the construction of the International Space Station. Standing left to right are Mission Specialists William S. McArthur Jr., Leroy Chiao, and Michael E. Lopez-Alegria, Pilot Pamela A. Melroy, Mission Specialists Peter J.K. Wisoff and Koichi Wakata, and Commander Brian Duffy. Wakata is with the National Space Development Agency of Japan. The Z1 is an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. Another part of the payload is a pressurized mating adapter, PMA-3, to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. Launch of STS-92 is scheduled for Sept. 21, 2000
Release Date 04/21/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, members of the STS-92 crew get a close look at some of the equipment, such as the Integrated Truss Structure Z1, to fly on their mission. STS-92 is the fifth U.S. flight in the construction of the International Space Station. At left is Mission Specialist Koichi Wakata, who is with the National Space Development Agency of Japan . The Z1 is an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. Another part of the payload is a pressurized mating adapter, PMA-3, to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. Other crew members are Mission Commander Brian Duffy, Pilot Pamela A. Melroy, and Mission Specialists Leroy Chiao, Peter J.K. Wisoff, Michael E. Lopez-Alegria, and William S. McArthur Jr. Launch of STS-92 is scheduled for Sept. 21, 2000
Release Date 04/21/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, members of the STS-92 crew get hands-on experience with some of the equipment, such as the Integrated Truss Structure Z1, to fly on their mission. STS-92 is the fifth U.S. flight in the construction of the International Space Station. The Z1 is an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. Another part of the payload is a pressurized mating adapter, PMA-3, to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The crew comprises Mission Commander Brian Duffy, Pilot Pamela A. Melroy, and Mission Specialists Koichi Wakata, Leroy Chiao, Peter J.K. Wisoff, Michael E. Lopez-Alegria, and William S. McArthur Jr. Wakata is with the National Space Development Agency of Japan. Launch of STS-92 is scheduled for Sept. 21, 2000
Release Date 04/21/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, members of the STS-92 crew get a close look at the Integrated Truss Structure Z1, part of the payload on their mission. STS-92 is the fifth U.S. flight in the construction of the International Space Station. The crew comprises Mission Commander Brian Duffy, Pilot Pamela A. Melroy, and Mission Specialists Koichi Wakata, Leroy Chiao, Peter J.K. Wisoff, Michael E. Lopez-Alegria, and William S. McArthur Jr. Wakata is with the National Space Development Agency of Japan. The Z1 is an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. Another part of the payload is a pressurized mating adapter, PMA-3, to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. Launch of STS-92 is scheduled for Sept. 21, 2000
Release Date 04/21/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, members of the STS-92 crew get a close look at some of the equipment, such as the Integrated Truss Structure Z1, to fly on their mission. STS-92 is the fifth U.S. flight in the construction of the International Space Station. At right are Mission Specialists Leroy Chiao and William S. McArthur Jr. (pointing). Other crew members are Commander Brian Duffy, Pilot Pamela A. Melroy, and Mission Specialists Koichi Wakata, Peter J.K. Wisoff, and Michael E. Lopez-Alegria. Wakata is with the National Space Development Agency of Japan. The Z1 is an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. Another part of the payload is a pressurized mating adapter, PMA-3, to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. Launch of STS-92 is scheduled for Sept. 21, 2000
Release Date 04/21/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, STS-92 Pilot Pamela A. Melroy gets a close look at the Integrated Truss Structure Z1 that will fly on the mission, the fifth U.S. flight in the construction of the International Space Station. Other crew members are Commander Brian Duffy, and Mission Specialists Koichi Wakata, Leroy Chaio, Peter J.K. Wisoff, Michael E. Lopez-Alegria, and William S. McArthur Jr. Wakata is with the National Space Development Agency of Japan. The Z1 is an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. Another part of the payload is a pressurized mating adapter, PMA-3, to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. Launch of STS-92 is scheduled for Sept. 21, 2000
Release Date 04/21/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, Japanese astronaut Koichi Wakata is dressed in protective clothing before entering the Pressurized Module, or PM, behind him. Part of the Japanese Experiment Module (JEM), the PM provides a shirt-sleeve environment in which astronauts on the International Space Station can conduct microgravity experiments. There are a total of 23 racks, including 10 experiment racks, inside the PM providing a power supply, communications, air conditioning, hardware cooling, water control and experiment support functions.
Release Date 09/24/2003
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, Japanese astronaut Koichi Wakata (top left) and technicians watch as a tray is extended from inside the Pressurized Module, or PM, part of the Japanese Experiment Module (JEM). The PM provides a shirt-sleeve environment in which astronauts on the International Space Station can conduct microgravity experiments. There are a total of 23 racks, including 10 experiment racks, inside the PM providing a power supply, communications, air conditioning, hardware cooling, water control and experiment support functions.
Release Date 09/24/2003
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Japanese astronaut Koichi Wakata (right) works with a tray extended from inside the Pressurized Module, or PM, part of the Japanese Experiment Module (JEM). The PM provides a shirt-sleeve environment in which astronauts on the International Space Station can conduct microgravity experiments. There are a total of 23 racks, including 10 experiment racks, inside the PM providing a power supply, communications, air conditioning, hardware cooling, water control and experiment support functions.
Release Date 09/24/2003
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, Japanese astronaut Koichi Wakata, dressed in blue protective clothing (at right), looks at the inside of the Pressurized Module, or PM, part of the Japanese Experiment Module (JEM), along with technicians. The PM provides a shirt-sleeve environment in which astronauts on the International Space Station can conduct microgravity experiments. There are a total of 23 racks, including 10 experiment racks, inside the PM providing a power supply, communications, air conditioning, hardware cooling, water control and experiment support functions.
Release Date 09/24/2003
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Japanese astronaut Koichi Wakata (left) works with a tray extended from inside the Pressurized Module, or PM, part of the Japanese Experiment Module (JEM). The PM provides a shirt-sleeve environment in which astronauts on the International Space Station can conduct microgravity experiments. There are a total of 23 racks, including 10 experiment racks, inside the PM providing a power supply, communications, air conditioning, hardware cooling, water control and experiment support functions.
Release Date 09/24/2003
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, Japanese astronaut Koichi Wakata looks over the Pressurized Module, or PM, part of the Japanese Experiment Module (JEM). The PM provides a shirt-sleeve environment in which astronauts on the International Space Station can conduct microgravity experiments. There are a total of 23 racks, including 10 experiment racks, inside the PM providing a power supply, communications, air conditioning, hardware cooling, water control and experiment support functions.
Release Date 09/24/2003
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Japanese astronaut Koichi Wakata (left) releases a tray extended from inside the Pressurized Module, or PM, that he was working with. Part of the Japanese Experiment Module (JEM), the PM provides a shirt-sleeve environment in which astronauts on the International Space Station can conduct microgravity experiments. There are a total of 23 racks, including 10 experiment racks, inside the PM providing a power supply, communications, air conditioning, hardware cooling, water control and experiment support functions. The JEM/PM is in the Space Station Processing Facility.
Release Date 09/24/2003
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, Japanese astronaut Koichi Wakata, dressed in protective clothing, talks with workers before entering the Pressurized Module, or PM, behind him. Part of the Japanese Experiment Module (JEM), the PM provides a shirt-sleeve environment in which astronauts on the International Space Station can conduct microgravity experiments. There are a total of 23 racks, including 10 experiment racks, inside the PM providing a power supply, communications, air conditioning, hardware cooling, water control and experiment support functions.
Release Date 09/24/2003
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, (left to right) astronauts Dan Tani, Leopold Eyharts, Koichi Wakata and Peggy Whitson study hardware for an upcoming shuttle flight. With construction of the Space Station the primary focus of future shuttle missions, astronaut crews will be working with one or more of the elements and hardware already being processed in the SSPF. Photo credit: NASA/Kim Shiflett
Release Date 02/06/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- From the floor of the Space Station Processing Facility, astronauts get a look at the S6 integrated truss and solar arrays, scheduled to fly on STS-119 in 2008. On the left are Koichi Wakata, Dan Tani and Peggy Whitson. With construction of the Space Station the primary focus of future shuttle missions, astronaut crews will be working with one or more of the elements and hardware already being processed in the SSPF. Photo credit: NASA/Kim Shiflett
Release Date 02/06/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- During a bench review in the Space Station Processing Facility, astronauts dressed in bunny suits get a close look at hardware they will be taking into and using in orbit. The astronauts are slated to join future expedition crews aboard the International Space Station. Among those participating in the review are Mission Specialist Garrett Reisman, who will fly on mission STS-123 in 2008, Koichi Wakata, who will fly on mission STS-126 in 2008, and Tim Kopra, who is a backup for Reisman.Photo credit: NASA/George Shelton
Release Date 05/04/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- During a bench review in the Space Station Processing Facility, astronauts, in the background, get a close look at hardware they will be taking into and using in orbit. The astronauts are slated to join future expedition crews aboard the International Space Station. Among those participating in the review are Mission Specialist Garrett Reisman, who will fly on mission STS-123, Koichi Wakata, who will fly on mission STS-126, and Tim Kopra, who is a backup for Reisman. Photo credit: NASA/George Shelton
Release Date 05/04/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Astronauts dressed in bunny suits, who are slated to join future expedition crews aboard the International Space Station, take part in a bench review in the Space Station Processing Facility. Among those seen here are Mission Specialist Garrett Reisman, who will fly on mission STS-123 in 2008, Koichi Wakata, who will fly on mission STS-126 in 2008, and Tim Kopra, who is a backup for Reisman. The bench review allows crew members to review equipment they will be taking into and using in orbit. Photo credit: NASA/George Shelton
Release Date 05/04/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- During a bench review in the Space Station Processing Facility, astronauts dressed in bunny suits get a close look at hardware they will be taking into and using in orbit. The astronauts are slated to join future expedition crews aboard the International Space Station. Among those participating in the review are Mission Specialist Garrett Reisman, who will fly on mission STS-123 in 2008, Koichi Wakata, who will fly on mission STS-126 in 2008, and Tim Kopra, who is a backup for Reisman. Photo credit: NASA/George Shelton
Release Date 05/04/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- During a bench review in the Space Station Processing Facility, astronauts dressed in bunny suits get a close look at hardware they will be taking into and using in orbit. The astronauts are slated to join future expedition crews aboard the International Space Station. Among those participating in the review are Mission Specialist Garrett Reisman, who will fly on mission STS-123 in 2008, Koichi Wakata, who will fly on mission STS-126 in 2008, and Tim Kopra, who is a backup for Reisman.Photo credit: NASA/George Shelton
Release Date 05/04/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- During a bench review in the Space Station Processing Facility, astronauts dressed in bunny suits get a close look at hardware they will be taking into and using in orbit. The astronauts are slated to join future expedition crews aboard the International Space Station. Among those participating in the review are Mission Specialist Garrett Reisman, who will fly on mission STS-123, Koichi Wakata, who will fly on mission STS-126, and Tim Kopra, who is a backup for Reisman. Photo credit: NASA/George Shelton
Release Date 05/04/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- During a bench review in the Space Station Processing Facility, astronauts Tim Kopra (left) and Garrett Reisman (center) get a close look at hardware they will be taking into and using in orbit. Reisman is slated to join Expedition 16 aboard the International Space Station in 2008, flying on mission STS-123, Kopra is his backup. Behind them is Koichi Wakata, with the Japanese Aerospace and Exploration Agency, who will join the Expedition 18 crew, flying on mission STS-126. Photo credit: NASA/George Shelton
Release Date 05/04/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- During a bench review in the Space Station Processing Facility, astronauts Garrett Reisman (left) and Koichi Wakata get hands-on experience on hardware they will be taking into and using in orbit. Reisman will join the Expedition 16 crew on the International Space Station in 2008, flying on mission STS-123. Wakata, with the Japanese Aerospace and Exploration Agency, will join the Expedition 18 crew in 2008, flying on mission STS-126. Photo credit: NASA/George Shelton
Release Date 05/04/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- During a bench review in the Space Station Processing Facility, astronauts get a close look at hardware they will be taking into and using in orbit. At left are Garrett Reisman (foreground) and Koichi Wakata, practicing with the equipment is Tim Kopra. Reisman will join the Expedition 16 crew on the International Space Station in 2008, flying on mission STS-123. Wakata, with the Japanese Aerospace and Exploration Agency, will join the Expedition 18 crew in 2008, flying on mission STS-126. Kopra is backup for Reisman. Photo credit: NASA/George Shelton
Release Date 05/04/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- During a bench review in the Space Station Processing Facility, astronauts get a close look at hardware they will be taking into and using in orbit. At far left is Koichi Wakata, with the Japanese Aerospace and Exploration Agency, will join the Expedition 18 crew in 2008, flying on mission STS-126. At right are Tim Kopra and Garrett Reisman, who will join Expedition 16 aboard the International Space Station in 2008, flying on mission STS-123. Kopra is his backup. Photo credit: NASA/George Shelton
Release Date 05/04/2007
The STS-92 crew strides acro …
Description The STS-92 crew strides across the runway at KSC?s Shuttle Landing Facility, heading toward the aircraft that will take them back to Houston. They were at KSC for Crew Equipment Interface Test (CEIT) activities, looking over their mission payload and related equipment. From left are Mission Specialists Bill McArthur and Jeff Wisoff, Pilot Pam Melroy, Mission Specialist Michael Lopez-Alegria, Commander Brian Duffy and Mission Specialist Koichi Wakata, who is with the Japanese space agency. Not seen is Mission Specialist Leroy Chiao, who was also at KSC for the CEIT. STS-92 is scheduled to launch Oct. 5 on Shuttle Discovery from Launch Pad 39A on the fifth flight to the International Space Station. Discovery will carry the Integrated Truss Structure (ITS) Z1, the PMA-3, Ku-band Communications System, and Control Moment Gyros (CMGs)
Release Date 07/12/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- On a platform inside the payload bay of Discovery, STS-92 Mission Specialists Leroy Chiao and Bill McArthur take a close look at Pressurized Mating Adapter-3 (PMA-3). They and other crew members Commander Brian Duffy, Pilot Pam Melroy and Mission Specialists Koichi Wakata, Jeff Wisoff, and Michael Lopez-Alegria are at KSC to take part in Crew Equipment Interface Test activities. Discovery is in the Orbiter Processing Facility bay 1. STS-92 is scheduled to launch Oct. 5 on Shuttle Discovery from Launch Pad 39A on the fifth flight to the International Space Station. Discovery will carry the Integrated Truss Structure (ITS) Z1, the PMA-3, Ku-band Communications System, and Control Moment Gyros (CMGs)
Release Date 07/12/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- STS-92 Mission Specialist Bill McArthur (with tool in hand) gets a close look at the Pressurized Mating Adapter-3 (PMA-3) in the payload bay of orbiter Discovery. He and other crew members Commander Brian Duffy, Pilot Pam Melroy and Mission Specialists Koichi Wakata, Leroy Chiao, Jeff Wisoff, and Michael Lopez-Alegria are at KSC to take part in Crew Equipment Interface Test activities. Discovery is in the Orbiter Processing Facility bay 1. STS-92 is scheduled to launch Oct. 5 on Shuttle Discovery from Launch Pad 39A on the fifth flight to the International Space Station. Discovery will carry the Integrated Truss Structure (ITS) Z1, the PMA-3, Ku-band Communications System, and Control Moment Gyros (CMGs
Release Date 07/12/2000
In the Orbiter Processing Fa …
Description In the Orbiter Processing Facility bay 1, STS-92 crew members, along with Boeing workers, look closely at the tools they will be using on their mission. The crew comprises Commander Brian Duffy, Pilot Pam Melroy and Mission Specialists Koichi Wakata, Leroy Chiao, Jeff Wisoff, Michael Lopez-Alegria and Bill McArthur. STS-92 is scheduled to launch Oct. 5 on Shuttle Discovery from Launch Pad 39A on the fifth flight to the International Space Station. Discovery will carry the Integrated Truss Structure (ITS) Z1, Pressurized Mating Adapter 3, Ku-band Communications System, and Control Moment Gyros (CMGs)
Release Date 07/12/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Being lowered into the payload bay of Discovery for a closer look at the payload are STS-92 Mission Specialists Leroy Chiao (second from left) and Bill McArthur (far right), accompanied by Boeing workers. In the foreground is the Pressurized Mating Adapter-3. They and other crew members Commander Brian Duffy, Pilot Pam Melroy and Mission Specialists Koichi Wakata, Jeff Wisoff and Michael Lopez-Alegria are taking part in Crew Equipment Interface Test activities. STS-92 is scheduled to launch Oct. 5 on Shuttle Discovery from Launch Pad 39A on the fifth flight to the International Space Station. Discovery will carry the Integrated Truss Structure (ITS) Z1, the PMA-3, Ku-band Communications System, and Control Moment Gyros (CMGs)
Release Date 07/12/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- STS-92 Mission Specialist Bill McArthur (with tool in hand) gets a close look at the Pressurized Mating Adapter-3 in the payload bay of orbiter Discovery. He and other crew members Commander Brian Duffy, Pilot Pam Melroy and Mission Specialists Koichi Wakata, Leroy Chiao, Jeff Wisoff, and Michael Lopez-Alegria are at KSC to take part in Crew Equipment Interface Test activities. Discovery is in the Orbiter Processing Facility bay 1. STS-92 is scheduled to launch Oct. 5 on Shuttle Discovery from Launch Pad 39A on the fifth flight to the International Space Station. Discovery will carry the Integrated Truss Structure (ITS) Z1, the PMA-3, Ku-band Communications System, and Control Moment Gyros (CMGs)
Release Date 07/12/2000
Checking out the tools they …
Description Checking out the tools they will be using on the STS-92 mission are Mission Specialists Jeff Wisoff (left) and Michael Lopez-Alegria (center), while a Boeing worker looks on. They are in the Orbiter Processing Facility bay 1 where Discovery is being outfitted for the mission. They and other crew members Commander Brian Duffy, Pilot Pam Melroy and Mission Specialists Koichi Wakata, Leroy Chiao and Bill McArthur are taking part in Crew Equipment Interface Test activities. STS-92 is scheduled to launch Oct. 5 on Shuttle Discovery from Launch Pad 39A on the fifth flight to the International Space Station. Discovery will carry the Integrated Truss Structure (ITS) Z1, Pressurized Mating Adapter 3, Ku-band Communications System, and Control Moment Gyros (CMGs)
Release Date 07/12/2000
In the Space Station Process …
Description In the Space Station Processing Facility, members of the STS-92 crew practice working with the Pressurized Mating Adapter-3, part of the payload for their mission to the International Space Station (ISS). STS-92 is targeted for launch in December 1999. STS-92 crew members visiting KSC are Commander Brian Duffy and Mission Specialists Koichi Wakata, Leroy Chiao, Jeff Wisoff, Michael Lopez-Alegria and Bill McArthur. STS-92 is the fourth U.S. flight for construction of the International Space Station. The payload also includes an integrated truss structure
Release Date 02/09/1999
1 2 3
1-50 of 138