|
|
| General Description |
STS-97 Shuttle Mission Imagery |
|
| General Description |
STS-97 Shuttle Mission Imagery |
|
| General Description |
STS-97 Shuttle Mission Imagery |
|
The STS-97 crew members wave
| Description |
The STS-97 crew members wave for the camera as they gather outside Launch Pad 39B. Standing left to right are Mission Specialist Carlos Noriega, Pilot Michael Bloomfield, Commander Brent Jett and Mission Specialists Joseph Tanner and Marc Garneau, who is with the Canadian Space Agency. The mission to the International Space Station carries the P6 Integrated Truss Segment containing solar arrays and batteries that will be temporarily installed to the Unity connecting module by the Z1 truss, recently delivered to and installed on the Station on mission STS-92. The two solar arrays are each more than 100 feet long. They will capture energy from the sun and convert it to power for the Station. Two spacewalks will be required to install the solar array connections. STS-97 is scheduled to launch Nov. 30 at about 10:06 p.m. EST |
| Release Date |
11/29/2000 |
|
Gathered at Launch Pad 39B,
| Description |
Gathered at Launch Pad 39B, the STS-97 crew pause for a photo. Standing left to right are Mission Specialist Carlos Noriega, Pilot Michael Bloomfield, Commander Brent Jett and Mission Specialists Joseph Tanner and Marc Garneau, who is with the Canadian Space Agency. The mission to the International Space Station carries the P6 Integrated Truss Segment containing solar arrays and batteries that will be temporarily installed to the Unity connecting module by the Z1 truss, recently delivered to and installed on the Station on mission STS-92. The two solar arrays are each more than 100 feet long. They will capture energy from the sun and convert it to power for the Station. Two spacewalks will be required to install the solar array connections. STS-97 is scheduled to launch Nov. 30 at about 10:06 p.m. EST |
| Release Date |
11/29/2000 |
|
From the payload changeout r
| Description |
From the payload changeout room on Launch Pad 39B, STS-97 Mission Specialists Joseph Tanner and Marc Garneau (pointing) look over the payload in Endeavour?s payload bay. At right center of the photo is the orbiter docking system (ODS). At left and below the ODS is the Canadian robotic arm that will be used during spacewalks on the mission to install solar arrays. Each more than 100 feet long, the arrays will capture energy from the sun and convert it to power for the Station. STS-97 is scheduled to launch Nov. 30 at about 10:06 p.m. EST |
| Release Date |
11/22/2000 |
|
Members of the STS-97 crew l
| Description |
Members of the STS-97 crew look into Endeavour?s payload bay at some of the equipment that will be carried on the mission. At far left are (left to right) Commander Brent Jett and Mission Specialist Joseph Tanner, with a technician. At center are Mission Specialists Marc Garneau and Carlos Noriega, plus Pilot Michael Bloomfield. The equipment visible at right are the orbiter docking system (ODS) (center) and Canadian robotic arm (left and below the ODS). The arm will be used during spacewalks on the mission to install solar arrays. Each more than 100 feet long, the arrays will capture energy from the sun and convert it to power for the Station. STS-97 is scheduled to launch Nov. 30 at about 10:06 p.m. EST |
| Release Date |
11/22/2000 |
|
Eager to speed into space, t
| Description |
Eager to speed into space, the STS-97 crew hurries out of the Operations and Checkout Building for the ride to Launch Pad 39B. Leading the way are Pilot Michael Bloomfield (left) and Commander Brent Jett (right). In the middle is Mission Specialist Marc Garneau (waving), who is with the Canadian Space Agency. Behind are Mission Specialists Carlos Noriega (left, waving) and Joseph Tanner. Mission STS-97 is the sixth construction flight to the International Space Station. It is transporting the P6 Integrated Truss Structure that comprises Solar Array Wing-3 and the Integrated Electronic Assembly, to be installed on the Space Station. The solar arrays are mounted on a ?blanket? that can be folded like an accordion for delivery. Once in orbit, astronauts will deploy the blankets to their full size. The 11-day mission includes two spacewalks to complete the solar array connections. The Station?s electrical power system will use eight photovoltaic solar arrays, each 112 feet long by 39 feet wide, to convert sunlight to electricity. Gimbals will be used to rotate the arrays so that they will face the Sun to provide maximum power to the Space Station. Launch is scheduled for Nov. 30 at 10:06 p.m. EST |
| Release Date |
11/30/2000 |
|
Leaving the Operations and C
| Description |
Leaving the Operations and Checkout Building, the STS-97 crew hurries toward the waiting Astrovan that will take them to Launch Pad 39B. Starting at left, they are Mission Specialists Carlos Noriega, Joseph Tanner and Marc Garneau, Pilot Michael Bloomfield, and Commander Brent Jett. Garneau is with the Canadian Space Agency. Mission STS-97 is the sixth construction flight to the International Space Station. It is transporting the P6 Integrated Truss Structure that comprises Solar Array Wing-3 and the Integrated Electronic Assembly, to be installed on the Space Station. The solar arrays are mounted on a ?blanket? that can be folded like an accordion for delivery. Once in orbit, astronauts will deploy the blankets to their full size. The 11-day mission includes two spacewalks to complete the solar array connections. The Station?s electrical power system will use eight photovoltaic solar arrays, each 112 feet long by 39 feet wide, to convert sunlight to electricity. Gimbals will be used to rotate the arrays so that they will face the Sun to provide maximum power to the Space Station. Launch is scheduled for Nov. 30 at 10:06 p.m. EST |
| Release Date |
11/30/2000 |
|
STS-97 Mission Specialist Jo
| Description |
STS-97 Mission Specialist Joseph Tanner signals thumbs up for launch as he dons his launch and entry suit. this is his third Shuttle flight., Mission STS-97 is the sixth construction flight to the International Space Station. It is transporting the P6 Integrated Truss Structure that comprises Solar Array Wing-3 and the Integrated Electronic Assembly, to be installed on the Space Station. The solar arrays are mounted on a ?blanket? that can be folded like an accordion for delivery. Once in orbit, astronauts will deploy the blankets to their full size. The 11-day mission includes two spacewalks to complete the solar array connections. The Station?s electrical power system will use eight photovoltaic solar arrays, each 112 feet long by 39 feet wide, to convert sunlight to electricity.. Gimbals will be used to rotate the arrays so that they will face the Sun to provide maximum power to the Space Station. Launch is scheduled for Nov. 30 at 10:06 p.m. EST |
| Release Date |
11/30/2000 |
|
The STS-97 crew are ready to
| Description |
The STS-97 crew are ready to enjoy a snack in the crew quarters, Operations and Checkout Building, before beginning to suit up for launch. Seated from left are Mission Specialists Marc Garneau and Carlos Noriega, Commander Brent Jett, Mission Specialist Joseph Tanner and Pilot Michael Bloomfield. Garneau is with the Canadian Space Agency. Mission STS-97 is the sixth construction flight to the International Space Station. It is transporting the P6 Integrated Truss Structure that comprises Solar Array Wing-3 and the Integrated Electronic Assembly, to be installed on the Space Station. The solar arrays are mounted on a ?blanket? that can be folded like an accordion for delivery. Once in orbit, astronauts will deploy the blankets to their full size. The 11-day mission includes two spacewalks to complete the solar array connections. The Station?s electrical power system will use eight photovoltaic solar arrays, each 112 feet long by 39 feet wide, to convert sunlight to electricity.. Gimbals will be used to rotate the arrays so that they will face the Sun to provide maximum power to the Space Station. Launch is scheduled for Nov. 30 at 10:06 p.m. EST |
| Release Date |
11/30/2000 |
|
Gathered at Launch Pad 39B,
| Description |
Gathered at Launch Pad 39B, the STS-97 crew pause for a photo. Standing left to right are Mission Specialist Carlos Noriega, Pilot Michael Bloomfield, Commander Brent Jett and Mission Specialists Joseph Tanner and Marc Garneau, who is with the Canadian Space Agency. Behind them can be seen the top of the external tank and solid rocket boosters. The mission to the International Space Station carries the P6 Integrated Truss Segment containing solar arrays and batteries that will be temporarily installed to the Unity connecting module by the Z1 truss, recently delivered to and installed on the Station on mission STS-92. The two solar arrays are each more than 100 feet long. They will capture energy from the sun and convert it to power for the Station. Two spacewalks will be required to install the solar array connections. STS-97 is scheduled to launch Nov. 30 at about 10:06 p.m. EST |
| Release Date |
11/29/2000 |
|
The STS-97 crew members wave
| Description |
The STS-97 crew members wave for the camera as they gather outside Launch Pad 39B. Standing left to right are Mission Specialist Carlos Noriega, Pilot Michael Bloomfield, Commander Brent Jett and Mission Specialists Joseph Tanner and Marc Garneau, who is with the Canadian Space Agency. Behind Tanner can be seen the top of the external tank. The mission to the International Space Station carries the P6 Integrated Truss Segment containing solar arrays and batteries that will be temporarily installed to the Unity connecting module by the Z1 truss, recently delivered to and installed on the Station on mission STS-92. The two solar arrays are each more than 100 feet long. They will capture energy from the sun and convert it to power for the Station. Two spacewalks will be required to install the solar array connections. STS-97 is scheduled to launch Nov. 30 at about 10:06 p.m. EST |
| Release Date |
11/29/2000 |
|
|