Browse All : Space Shuttle Orbiter and Columbia by James H. Newman

Printer Friendly
1 2
1-50 of 70
     
     
STS-109 Crew Portrait
Name of Image STS-109 Crew Portrait
Date of Image 2001-11-08
Full Description Posing for the traditional preflight crew portrait, the seven astronauts of the STS-109 mission are (left to right) astronauts Michael J. Massimino, Richard M. Linnehan, Duane G. Carey, Scott D. Altman, Nancy J. Currie, John M. Grunsfeld and James H. Newman. Altman and Carey were commander and pilot, respectively, with the others serving as mission specialists. Grunsfeld was payload commander. Launched aboard the Space Shuttle Columbia on March 1, 2002, the group was the fourth visit to the the Hubble Space Telescope (HST) for performing upgrade and servicing on the giant orbital observatory.
STS-109 Extra Vehicular Acti …
Name of Image STS-109 Extra Vehicular Activity (EVA)
Date of Image 2002-03-05
Full Description Astronaut James H. Newman, mission specialist, floats about in the Space Shuttle Columbia's cargo bay while working in tandem with astronaut Michael J. Massimino (out of frame),mission specialist, during the STS-109 mission's second day of extravehicular activity (EVA). Inside Columbia's cabin, astronaut Nancy J. Currie, mission specialist, controlled the Remote Manipulator System (RMS) to assist the two in their work on the Hubble Space Telescope (HST). The RMS was used to capture the telescope and secure it into Columbia's cargo bay.Part of the giant telescope's base, latched down in the payload bay, can be seen behind Newman. The Space Shuttle Columbia STS-109 mission lifted off March 1, 2002 with goals of repairing and upgrading the HST. The Marshall Space Flight Center in Huntsville, Alabama had responsibility for the design, development, and contruction of the HST, which is the most powerful and sophisticated telescope ever built. STS-109 upgrades to the HST included: replacement of the solar array panels, replacement of the power control unit (PCU), replacement of the Faint Object Camera (FOC) with a new advanced camera for Surveys (ACS), and installation of the experimental cooling system for the Hubble's Near-Infrared Camera and Multi-object Spectrometer (NICMOS), which had been dormant since January 1999 when its original coolant ran out. Lasting 10 days, 22 hours, and 11 minutes, the STS-109 mission was the 108th flight overall in NASA's Space Shuttle Program.
STS-109 Astronaut Michael J. …
Name of Image STS-109 Astronaut Michael J. Massimino Peers Into Window of Shuttle During EVA
Date of Image 2002-03-05
Full Description STS-109 Astronauts Michael J. Massimino and James H. Newman were making their second extravehicular activity (EVA) of their mission when astronaut Massimino, mission specialist, peered into Columbia's crew cabin during a brief break from work on the Hubble Space Telescope (HST). The HST is latched down just a few feet behind him in Columbia's cargo bay. The Space Shuttle Columbia STS-109 mission lifted off March 1, 2002 with goals of repairing and upgrading the Hubble Space Telescope (HST). STS-109 upgrades to the HST included: replacement of the solar array panels, replacement of the power control unit (PCU), replacement of the Faint Object Camera (FOC) with a new advanced camera for Surveys (ACS), and installation of the experimental cooling system for the Hubble's Near-Infrared Camera and Multi-object Spectrometer (NICMOS), which had been dormant since January 1999 when its original coolant ran out. The Marshall Space Flight Center in Huntsville, Alabama had the responsibility for the design, development, and construction of the HST, which is the most powerful and sophisticated telescope ever built. Lasting 10 days, 22 hours, and 11 minutes, the STS-109 mission was the 108th flight overall in NASA's Space Shuttle Program.
STS-109 Astronaut Michael J. …
Name of Image STS-109 Astronaut Michael J. Massimino Carries the Electronic Support Module (ESM)
Date of Image 2002-03-07
Full Description STS-109 Astronaut Michael J. Massimino, mission specialist, perched on the Shuttle's robotic arm, is preparing to install the Electronic Support Module (ESM) in the aft shroud of the Hubble Space telescope (HST), with the assistance of astronaut James H. Newman (out of frame). The module will support a new experimental cooling system to be installed during the next day's fifth and final space walk of the mission. That cooling system is designed to bring the telescope's Near-Infrared Camera and Multi Spectrometer (NICMOS) back to life the which had been dormant since January 1999 when its original coolant ran out. The Space Shuttle Columbia STS-109 mission lifted off March 1, 2002 with goals of repairing and upgrading the Hubble Space Telescope (HST). The Marshall Space Flight Center in Huntsville, Alabama had the responsibility for the design, development, and construction of the HST, which is the most powerful and sophisticated telescope ever built. In addition to the installation of the experimental cooling system for the Hubble's Near-Infrared Camera and NICMOS, STS-109 upgrades to the HST included replacement of the solar array panels, replacement of the power control unit (PCU), and replacement of the Faint Object Camera (FOC) with a new advanced camera for Surveys (ACS). Lasting 10 days, 22 hours, and 11 minutes, the STS-109 mission was the 108th flight overall in NASA's Space Shuttle Program.
STS-109 Shuttle Mission Onbo …
Name of Image STS-109 Shuttle Mission Onboard Crew Portrait
Date of Image 2002-03-11
Full Description On the Space Shuttle Columbia's mid deck, the STS-109 crew of seven pose for the traditional in-flight portrait. From the left (front row), are astronauts Nancy J. Currie, mission specialist, Scott D. Altman, mission commander, and Duane G. Carey, pilot. Pictured on the back row from left to right are astronauts John M. Grunsfield, payload commander, and Richard M. Lirneham, James H. Newman, and Michael J. Massimino, all mission specialists. The 108th flight overall in NASA's Space Shuttle Program, the STS-109 mission launched March 1, 2002, and lasted 10 days, 22 hours, and 11 minutes. The goal of the mission was the maintenance and upgrade of the Hubble Space Telescope (HST). Using Columbia's robotic arm, the telescope was captured and secured on a work stand in Columbia's payload bay where four members of the crew performed five space walks to complete system upgrades to the HST. The Marshall Space Flight Center had the responsibility for the design, development, and construction of the HST, which is the most complex and sensitive optical telescope ever made, to study the cosmos from a low-Earth orbit.
STS-109 Shuttle Mission Crew
Name of Image STS-109 Shuttle Mission Crew
Date of Image 2002-03-01
Full Description The STS-109 crew of seven waved to onlookers as they emerged from the Operations and Checkout Buildings at Kennedy Space Flight Center eager to get to the launch pad to embark upon the Space Shuttle Orbiter Columbia's 27th flight into space. Crew members included, from front to back, Duane G. Carey (left) and Scott D. Altman (right), Nancy J. Currie, mission specialist, John M. Grunsfield (left), payload commander, and Richard M. Linneham (right), James H. Newman (left) and Michael J. Massimino (right), all mission specialists. Launched March 1, 2002, the goal of the mission was the maintenance and upgrade of the Hubble Space Telescope (HST). The Marshall Space Flight Center had the responsibility for the design, development, and construction of the HST, which is the most complex and sensitive optical telescope ever made, to study the cosmos from a low-Earth orbit. By using Columbia's robotic arm, the telescope was captured and secured on a work stand in Columbia's payload bay where four members of the crew performed five spacewalks to complete system upgrades to the HST. Lasting 10 days, 22 hours, and 11 minutes, the STS-109 mission was the 108th flight overall in NASA's Space Shuttle Program.
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
General Description STS-109 Shuttle Mission Imagery
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Space Shuttle Columbia emblazons the pre-dawn clouds as it soars into the sky on its 27th flight into space on mission STS-109. Liftoff occurred at 6:22:02:08 a.m. EST(11:22:02:08 GMT). The goal of the mission is the maintenance and upgrade of the Hubble Space Telescope, to be carried out in five spacewalks. The crew of STS-109 comprises Commander Scott D. Altman, Pilot Duane G. Carey, Payload Commander John M. Grunsfeld, and Mission Specialists Nancy Jane Currie, Richard M. Linnehan, James H. Newman and Michael J. Massimino. After an 11-day mission, Columbia is expected to return to Kennedy March 12 about 4:35 a.m. EST (09:35 GMT). [Photo by Anita Barrett]
Release Date 03/01/2002
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - In the White Room, STS-109 Mission Specialist James H. Newman is helped with his launch and entry suit by Rene Arriens (left), USA mechanical technician, and Danny Wyatt, NASA quality assurance specialist (right, kneeling). Behind Newman is the opened hatch of Space Shuttle Columbia. On the mission, Columbia will rendezvous with the Hubble Space Telescope for the crew to replace and upgrade key telescope systems through five challenging spacewalks. After an extensive 2-1/2 year modification period during which many systems were replaced and enhanced, Columbia is making its 27th flight in the Shuttle program. After the 11-day mission, Columbia is expected to land at Kennedy Space Center March 12
Release Date 03/01/2002
KENNEDY SPACE CENTER, Fla. - …
Description KENNEDY SPACE CENTER, Fla. - During suitup, STS-109 Mission Specialist James H. Newman gives a thumbs up for launch. Liftoff of Space Shuttle Columbia is scheduled for 6:22 a.m. EST March 1. On mission STS-109, the crew will capture the Hubble Space Telescope using the Shuttle's robotic arm and secure it on a workstand in Columbia's payload bay. Four mission specialists will perform five scheduled spacewalks to complete system upgrades to the telescope. More durable solar arrays, a large gyroscopic assembly to help point the telescope properly, a new telescope power control unit, and a cooling system to restore the use of a key infrared camera and spectrometer unit, which has been dormant since 1999, will all be installed. In addition, the telescope's view of the Universe will be improved with the addition of the Advanced Camera for Surveys (ACS), which replaces the Faint Object Camera, the last of Hubble's original instruments. Mission STS-109 is the 27th flight of the orbiter Columbia and the 108th flight overall in NASA's Space Shuttle program. After the 11-day mission, Columbia is scheduled to land about 4:35 a.m. EST March 12
Release Date 03/01/2002
KENNEDY SPACE CENTER, Fla. - …
Description KENNEDY SPACE CENTER, Fla. - The STS-109 crew members wave to onlookers as they stride out from the Operations and Checkout Building, eager to get to the launch pad. They are, from front to back, Pilot Duane G. Carey (left) and Commander Scott D. Altman (right), Mission Specialist Nance Jane Currie, Payload Commander John M. Grunsfeld (left) and Richard M. Linnehan (right), James H. Newman (left) and Michael J. Massimino (right). On mission STS-109, the crew will capture the Hubble Space Telescope using the Shuttle's robotic arm and secure it on a workstand in Columbia's payload bay. Four mission specialists will perform five scheduled spacewalks to complete system upgrades to the telescope. More durable solar arrays, a large gyroscopic assembly to help point the telescope properly, a new telescope power control unit, and a cooling system to restore the use of a key infrared camera and spectrometer unit, which has been dormant since 1999, will all be installed. In addition, the telescope's view of the Universe will be improved with the addition of the Advanced Camera for Surveys (ACS), which replaces the Faint Object Camera, the last of Hubble's original instruments. Mission STS-109 is the 27th flight of the orbiter Columbia and the 108th flight overall in NASA's Space Shuttle program. After the 11-day mission, STS-109 is scheduled to land about 4:35 a.m. EST on March 12
Release Date 03/01/2002
KENNEDY SPACE CENTER, Fla. - …
Description KENNEDY SPACE CENTER, Fla. - Space Shuttle Columbia spews flames and smoke as it leaps off the launch pad on its 27th flight into space on mission STS-109. Liftoff occurred at 6:22:02:08 a.m. EST (11:22:02:08 GMT). The goal of the mission is the maintenance and upgrade of the Hubble Space Telescope, to be carried out in five spacewalks. The crew of STS-109 comprises Commander Scott D. Altman, Pilot Duane G. Carey, Payload Commander John M. Grunsfeld, and Mission Specialists Nancy Jane Currie, Richard M. Linnehan, James H. Newman and Michael J. Massimino. After an 11-day mission, Columbia is expected to return to Kennedy March 12 about 4:35 a.m. EST (09:35 GMT).
Release Date 03/01/2002
1 2
1-50 of 70