|
|
Browse All
:
International Space Station (ISS) and Destiny and Space Shuttle Orbiter by Ellen Ochoa
|
Printer Friendly |
STS-110 S0 Truss Removed Fro
| Name of Image |
STS-110 S0 Truss Removed From Cargo Bay |
| Date of Image |
2002-04-11 |
| Full Description |
Backdropped against the blackness of space and the Earth's horizon, the S0 (S-zero) truss is removed from Atlantis' cargo bay and onto the Destiny laboratory of the International Space Station (ISS) by Astronauts Ellen Ochoa, STS-110 mission specialist, and Daniel W. Bursch, Expedition Four flight engineer, using the ISS' Canadarm2. Space Shuttle Orbiter Atlantis, STS-110 mission, prepared the International Space Station (ISS) for future spacewalks by installing and outfitting the 43-foot-long S0 truss and preparing the first railroad in space, the Mobile Transporter. The 27,000-pound S0 truss was the first of 9 segments that will make up the Station's external framework that will eventually stretch 356 feet (109 meters), or approximately the length of a football field. This central truss segment also includes a flatcar called the Mobile Transporter and rails that will become the first "space railroad," which will allow the Station's robotic arm to travel up and down the finished truss for future assembly and maintenance. The completed truss structure will hold solar arrays and radiators to provide power and cooling for additional international research laboratories from Japan and Europe that will be attached to the Station. Milestones of the STS-110 mission included the first use of the Station's robotic arm to maneuver spacewalkers around the Station and it was the first time all of a Shuttle crew's spacewalks were based out of the Station's Quest Airlock. It was also the first Shuttle to use three Block II Main Engines. The Space Shuttle Orbiter Atlantis, STS-110 mission, was launched April 8, 2002 and returned to Earth April 19, 2002. |
|
Canadarm2 Viewed by Astronau
| Name of Image |
Canadarm2 Viewed by Astronaut Aboard the International Space Station |
| Date of Image |
2002-04-16 |
| Full Description |
Astronaut Ellen Ochoa, STS-110 mission specialist, looks through the window of the Destiny laboratory on the International Space Station (ISS) as she views portions of the Space Shuttle Atlantis and the Canadarm2. It was during the STS-110 mission that the Canadian-developed ISS robotic arm was used to maneuver spacewalkers around the station for the first time. The STS-110 mission, carried by the Space Shuttle Orbiter Atlantis, was launched on April 8, 2002. |
|
STS-110 and Expedition Four
| Name of Image |
STS-110 and Expedition Four Crews Pose for Onboard Portrait |
| Date of Image |
2002-04-01 |
| Full Description |
Posed inside the Destiny Laboratory aboard the International Space Station (ISS) are the STS-110 and Expedition Four crews for a traditional onboard portrait From the left, bottom row, are astronauts Ellen Ochoa, STS mission specialist, Michael J. Bloomfield, STS mission commander, and Yury I Onufrienko, Expedition Four mission commander. From the left, middle row, are astronauts Daniel W. Bursch, Expedition Four flight engineer, Rex J. Walheim, STS mission specialist, and Carl E. Walz, Expedition Four flight engineer. From the left, top row, are astronauts Stephen N. Frick, STS pilot, Jerry L. Ross, Lee M.E. Morin, and Steven L. Smith, all mission specialists. Launched aboard the Space Shuttle Orbiter Atlantis on April 8, 2002, the STS-110 mission crew prepared the ISS for future space walks by installing and outfitting the 43-foot-long Starboard side S0 truss and preparing the Mobile Transporter. The mission served as the 8th ISS assembly flight. |
|
| General Description |
International Space Station Imagery |
|
| General Description |
STS-110 Shuttle Mission Imagery |
|
| General Description |
STS-110 Shuttle Mission Imagery |
|
| General Description |
STS-110 Shuttle Mission Imagery |
|
| General Description |
STS-110 Shuttle Mission Imagery |
|
| General Description |
STS-110 Shuttle Mission Imagery |
|
| General Description |
STS-110 Shuttle Mission Imagery |
|
| General Description |
STS-110 Shuttle Mission Imagery |
|
| General Description |
STS-110 Shuttle Mission Imagery |
|
| General Description |
STS-110 Shuttle Mission Imagery |
|
| General Description |
STS-110 Shuttle Mission Imagery |
|
| General Description |
STS-110 Shuttle Mission Imagery |
|
| General Description |
STS-110 Shuttle Mission Imagery |
|
| General Description |
STS-110 Shuttle Mission Imagery |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- STS-110 Mission Specialist Ellen Ochoa has final suit preparations - In the White Room before entering Space Shuttle Atlantis for launch. The White Room provides entry into the cockpit area of the orbiter. This is Ochoa's fourth Shuttle flight. On this 13th assembly flight to the International Space Station, STS-110 is carrying the S0 Integrated Truss Structure and Mobile Transporter (MT). During the 11-day mission, astronauts will make four spacewalks to attach the S0 truss, which will become the backbone of the Space Station, to the U.S. Lab, "Destiny." The MT, a space "railcar," is attached to the truss segment and will make its debut run during the flight. Launch is scheduled for 4:40 p.m. EDT (20:40 GMT). |
| Release Date |
04/08/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - STS-110 Mission Specialist Ellen Ochoa arrives at the KSC Shuttle Landing Facility to prepare for launch April 4. The mission will be her fourth Space Shuttle flight. Mission STS-110 is the 13th assembly flight to the International Space Station. During four planned spacewalks, crew members will install the S0 Integrated Truss Structure (ITS), centerpiece of the orbiting International Space Station (ISS), at the center of the 10-truss, girderlike structure that will ultimately extend the length of a football field on the ISS. The S0 truss will be attached to the U.S. Lab, "Destiny," on the 11-day mission. |
| Release Date |
04/01/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- While gathering with friends and family at the pad, the STS-110 crew poses in front of Space Shuttle Atlantis still enclosed by the Rotating Service Structure. Standing left to right are Mission Specialist Steven Smith, Jerry Ross and Lee Morin, Pilot Stephen Frick, Mission Specialist Rex Walheim, Commander Michael Bloomfield, and Mission Specialist Ellen Ochoa. The mission continues the expansion of the International Space Station by delivering and installing the S0 Integrated Truss Structure, the initial section of a framework that will eventually hold the power and cooling systems needed for future international research laboratories. The payload also comprises the Canadian Mobile Transporter (attached to the S0 truss), power distribution system modules, a heat pipe radiator for cooling, computers and a pair of rate gyroscopes. The 11-day mission is the 13th assembly flight to the ISS and includes four spacewalks to attach the S0 truss to the U.S. Lab Destiny. Launch is scheduled for April 4 |
| Release Date |
04/03/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- While gathering with friends and family at the pad, the STS-110 crew poses in front of Space Shuttle Atlantis still enclosed by the Rotating Service Structure. Standing left to right are Mission Specialist Steven Smith, Jerry Ross and Lee Morin, Pilot Stephen Frick, Mission Specialist Rex Walheim, Commander Michael Bloomfield, and Mission Specialist Ellen Ochoa. The mission continues the expansion of the International Space Station by delivering and installing the S0 Integrated Truss Structure, the initial section of a framework that will eventually hold the power and cooling systems needed for future international research laboratories. The payload also comprises the Canadian Mobile Transporter (attached to the S0 truss), power distribution system modules, a heat pipe radiator for cooling, computers and a pair of rate gyroscopes. The 11-day mission is the 13th assembly flight to the ISS and includes four spacewalks to attach the S0 truss to the U.S. Lab Destiny. Launch is scheduled for April 4 |
| Release Date |
04/03/2002 |
|
|