Browse All : Images by Daniel Burbank of Kennedy Space Center (KSC)

Printer Friendly
1 2
1-50 of 85
     
     
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- STS-115 Mission Specialist Daniel Burbank checks out equipment during Crew Equipment Interface Test activities in the Space Station Processing Facility. The mission will deliver the second port truss segment, the P3/P4 Truss, to attach to the first port truss segment, the P1 Truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Endeavour is scheduled for May 23, 2003.
Release Date 01/13/2003
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, STS-115 Mission Specialists Daniel Burbank (left) and Steven MacLean (right) check out equipment during Crew Equipment Interface Test activities. MacLean is with the Canadian Space Agency. The mission will deliver the second port truss segment, the P3/P4 Truss, to attach to the first port truss segment, the P1 Truss, as well as deploy solar array set 2A and 4A. Launch on Space Shuttle Endeavour is scheduled for May 23, 2003.
Release Date 01/13/2003
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - STS-115 Mission Specialist Daniel Burbank is ready to practice driving the M-113 armored personnel carrier. The STS-115 crew are at NASA's Kennedy Space Center for Terminal Countdown Demonstration Test activities such as the M-113 training. They will also practice emergency egress from the launch pad and take part in a simulated launch countdown. Liftoff of mission STS-115 aboard Space Shuttle Atlantis is scheduled in a window beginning Aug. 27. Photo credit: NASA/Cory Huston
Release Date 08/08/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - STS-115 Commander Brent Jett introduces his crew to waiting media at KSC's Shuttle Landing Facility after their arrival from Houston. At left are Mission Specialists Daniel Burbank, Steven MacLean and Joseph Tanner, at right are Mission Specialist Heidemarie Stefanyshyn-Piper and Pilot Christopher Ferguson. The STS-115 crew has flown to NASA's Kennedy Space Center to take part in Terminal Countdown Demonstration Test activities. The TCDT is a pre-launch preparation that includes practicing emergency egress from the pad, driving an M-113 armored personnel carrier, and simulating the launch countdown. Launch of STS-115 is currently scheduled for Aug. 27. Photo credit: NASA/George Shelton
Release Date 08/07/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Sitting inside the M-113 armored personnel carrier, the STS-115 crew members get instructions from Capt. George Hoggard, who is astronaut rescue team leader. The astronauts at left are Mission Specialist Heidemarie Stefanyshyn-Piper and Pilot Christopher Ferguson. At right are Commander Brent Jett and Mission Specialists Joseph Tanner and Daniel Burbank. Not seen is Mission Specialist Steven MacLean, who represents the Canadian Space Agency. The STS-115 crew are at NASA's Kennedy Space Center for Terminal Countdown Demonstration Test activities such as the M-113 training. They will also practice emergency egress from the launch pad and take part in a simulated launch countdown. Liftoff of mission STS-115 aboard Space Shuttle Atlantis is scheduled in a window beginning Aug. 27. Photo credit: NASA/Cory Huston
Release Date 08/08/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - STS-115 Mission Specialist Steven MacLean takes his turn driving the M-113 armored personnel carrier. STS-115 Mission Specialist Steven MacLean takes his turn driving the M-113 armored personnel carrier. Passengers on the carrier are Mission Specialists Daniel Burbank and Heidemarie Stefanyshyn-Piper, Pilot Christopher Ferguson and Capt. George Hoggard, who is astronaut rescue team leader. MacLean represents the Canadian Space Agency. The STS-115 crew are at NASA's Kennedy Space Center for Terminal Countdown Demonstration Test activities such as the M-113 training. They will also practice emergency egress from the launch pad and take part in a simulated launch countdown. Liftoff of mission STS-115 aboard Space Shuttle Atlantis is scheduled in a window beginning Aug. 27. Photo credit: NASA/Cory Huston
Release Date 08/08/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - STS-115 Pilot Christopher Ferguson takes the wheel to practice driving the M-113 armored personnel carrier. Passengers on the carrier are (from left) Mission Specialists Daniel Burbank and Heidemarie Stefanyshyn-Piper, Capt. George Hoggard, who is astronaut rescue team leader, and Mission Specialist Steven MacLean. The STS-115 crew are at NASA's Kennedy Space Center for Terminal Countdown Demonstration Test activities such as the M-113 training. They will also practice emergency egress from the launch pad and take part in a simulated launch countdown. Liftoff of mission STS-115 aboard Space Shuttle Atlantis is scheduled in a window beginning Aug. 27. Photo credit: NASA/Cory Huston
Release Date 08/08/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - With a video camera trained on him, STS-115 Mission Specialist Daniel Burbank takes his turn driving the M-113 armored personnel carrier. Also along for the ride are Mission Specialist Daniel Burbank, Capt. George Hoggard, who is astronaut rescue team leader, and Mission Specialist Steven MacLean, who represents the Canadian Space Agency. The STS-115 crew are at NASA's Kennedy Space Center for Terminal Countdown Demonstration Test activities such as the M-113 training. They will also practice emergency egress from the launch pad and take part in a simulated launch countdown. Liftoff of mission STS-115 aboard Space Shuttle Atlantis is scheduled in a window beginning Aug. 27. Photo credit: NASA/Cory Huston
Release Date 08/08/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - After their arrival at KSC's Shuttle Landing Facility, the STS-115 crew poses for a photo after talking to the media. From left are Mission Specialists Daniel Burbank, Steven MacLean, Joseph Tanner and Heidemarie Stefanyshyn-Piper, Commander Brent Jett, and Pilot Christopher Ferguson. The STS-115 crew has flown to NASA's Kennedy Space Center to take part in Terminal Countdown Demonstration Test activities. The TCDT is a pre-launch preparation that includes practicing emergency egress from the pad, driving an M-113 armored personnel carrier, and simulating the launch countdown. Launch of STS-115 is currently scheduled for Aug. 27. Photo credit: NASA/George Shelton
Release Date 08/07/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-115 crew pauses for a photo during training on Launch Pad 39B. From left are Mission Commander Brent Jett, Pilot Chris Ferguson, and Mission Specialists Daniel Burbank, Steven MacLean, Heidemarie Stefanyshyn-Piper and Joseph Tanner. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/09/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-115 crew is in the White Room on the orbiter access arm on Launch Pad 39B to get instruction on using the emergency egress system. From left are Commander Brent Jett, Pilot Chris Ferguson, and Mission Specialists Heidemarie Stefanyshyn-Piper, Joseph Tanner, Steven MacLean and Daniel Burbank. MacLean is with the Canadian Space Agency. he White Room provides access into the orbiter through the crew access hatch. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/09/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-115 crew is in the White Room on the orbiter access arm on Launch Pad 39B to get instruction on using the emergency egress system. From left are Commander Brent Jett, Pilot Chris Ferguson, and Mission Specialists Heidemarie Stefanyshyn-Piper, Joseph Tanner, Steven MacLean and Daniel Burbank. MacLean is with the Canadian Space Agency. The White Room provides access into the orbiter through the crew access hatch. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/09/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-115 crew gets instructions on landing the slidewire baskets, used during emergency egress from the launch pad. Visible from left are Pilot Chris Ferguson, Mission Specialist Joseph Tanner, Commander Brent Jett, Mission Specialist Steven MacLean, who is with the Canadian Space Agency. Partially hidden behind them are Mission Specialists Heidemarie Stefanyshyn-Piper and Daniel Burbank. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/09/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-115 crew gets instructions on landing the slidewire baskets, used during emergency egress from the launch pad. From left are Mission Specialists Joseph Tanner and Heidemarie Stefanyshyn-Piper, Commander Brent Jett, and Mission Specialists Daniel Burbank, Chris Ferguson and Steven MacLean, who is with the Canadian Space Agency. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/09/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-115 crew members are suiting up for their simulated launch countdown. Shown here is Mission Specialist Daniel Burbank. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. The TCDT has included emergency egress training as well as the simulation. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/10/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-115 crew gets instructions about using the slidewire baskets for emergency egress from the space shuttle on the pad. Seen here are Mission Specialists Heidemarie Stefanyshyn-Piper and Daniel Burbank, Pilot Chris Ferguson, Mission Specialist Steven MacLean and Commander Brent Jett. MacLean is with the Canadian Space Agency. Not seen is Mission Specialist Joseph Tanner. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/09/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-115 crew responds to questions from the media at a press conference held on Launch Pad 39B. Seen left to right are Commander Brent Jett, Mission Specialist Steven MacLean, Pilot Chris Ferguson, and Mission Specialist Daniel Burbank. Crew members not seen are Mission Specialists Heidemarie Stefanyshyn-Piper and Joseph Tanner. MacLean is with the Canadian Space Agency. The mission crew is at KSC for Terminal Countdown Demonstration Test activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. The TCDT culminates in a simulated launch countdown. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/09/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-115 crew learn about use of the bunker in the event of an emergency at the launch pad. Seen in the photo are, from left, Commander Brent Jett, Mission Specialists Daniel Burbank and Steven MacLean, Pilot Chris Ferguson and Mission Specialist Joseph Tanner. Not pictured is Mission Specialist Heidemarie Stefanyshyn-Piper. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/09/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-115 crew poses for the media before a press conference on Launch Pad 39B. Seen left to right are Mission Specialist Steven MacLean, Commander Brent Jett, Mission Specialist Daniel Burbank, Pilot Chris Ferguson, and Mission Specialists Heidemarie Stefanyshyn-Piper and Joseph Tanner. MacLean is with the Canadian Space Agency. The mission crew is at KSC for Terminal Countdown Demonstration Test activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. Behind the crew is the shuttle, surrounded by the fixed and rotating service structures, with the orange external tank and while solid rocket boosters showing. The TCDT culminates in a simulated launch countdown. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/09/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-115 crew gets instructions on landing the slidewire baskets, used during emergency egress from the launch pad. From left are Mission Specialists Joseph Tanner and Heidemarie Stefanyshyn-Piper, Commander Brent Jett, and Mission Specialists Daniel Burbank, Chris Ferguson and Steven MacLean, who is with the Canadian Space Agency. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/09/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-115 crew gets instructions about using the slidewire baskets for emergency egress from the space shuttle on the pad. From left are Commander Brent Jett and Mission Specialists Steven MacLean, Heidemarie Stefanyshyn-Piper and Joseph Tanner. MacLean is with the Canadian Space Agency. Not pictured are Pilot Chris Ferguson and Mission Specialist Daniel Burbank. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/09/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-115 crew gets instructions about using the slidewire baskets for emergency egress from the space shuttle on the pad. From left are Commander Brent Jett and Mission Specialists Steven MacLean, Heidemarie Stefanyshyn-Piper and Joseph Tanner, and Pilot Chris Ferguson. MacLean is with the Canadian Space Agency. Not pictured is Mission Specialist Daniel Burbank. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/09/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-115 crew responds to questions from the media at a press conference held on Launch Pad 39B. Seen left to right are Commander Brent Jett, Mission Specialist Steven MacLean, Pilot Chris Ferguson, and Mission Specialists Daniel Burbank, Heidemarie Stefanyshyn-Piper and Joseph Tanner. MacLean is with the Canadian Space Agency. The mission crew is at KSC for Terminal Countdown Demonstration Test activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. The TCDT culminates in a simulated launch countdown. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/09/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-115 crew practices exiting from the slidewire basket, used during emergency egress from the launch pad. Sitting in the basket are Pilot Chris Ferguson and Mission Specialist Steven MacLean, who is with the Canadian Space Agency. On the left is Mission Specialist Daniel Burbank. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/09/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-115 crew is in the White Room on the orbiter access arm on Launch Pad 39B to get instruction on using the emergency egress system. From left are Pilot Chris Ferguson, Commander Brent Jett, and Mission Specialists Heidemarie Stefanyshyn-Piper, Joseph Tanner, Steven MacLean and Daniel Burbank. MacLean is with the Canadian Space Agency. The White Room provides access into the orbiter through the crew access hatch. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/09/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-115 crew responds to questions from the media at a press conference held on Launch Pad 39B. Seen left to right are Commander Brent Jett, Mission Specialist Steven MacLean, Pilot Chris Ferguson, and Mission Specialists Daniel Burbank, Heidemarie Stefanyshyn-Piper and Joseph Tanner. MacLean is with the Canadian Space Agency. The mission crew is at KSC for Terminal Countdown Demonstration Test activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. The TCDT culminates in a simulated launch countdown. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/09/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-115 crew gets instructions about using the slidewire baskets for emergency egress from the space shuttle on the pad. At center, foreground, is Commander Brent Jett. The others, from left are Mission Specialists Joseph Tanner, gesturing, Steven MacLean, Daniel Burbank and Heidemarie Stefanyshyn-Piper. MacLean is with the Canadian Space Agency. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/09/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-115 crew responds to questions from the media at a press conference on Launch Pad 39B. Seen left to right are Commander Brent Jett, Mission Specialist Steven MacLean, Pilot Chris Ferguson, and Mission Specialists Daniel Burbank, Heidemarie Stefanyshyn-Piper and Joseph Tanner. MacLean is with the Canadian Space Agency. The mission crew is at KSC for Terminal Countdown Demonstration Test activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. The TCDT culminates in a simulated launch countdown. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/09/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - After successfully completing their driving practice on the M-113 armored personnel carrier behind them, the STS-115 crew poses for a photo. From left are Pilot Christopher Ferguson, Mission Specialists Steven MacLean, Heidemarie Stefanyshyn-Piper, Joseph Tanner and Daniel Burbank, and Commander Brent Jett. The STS-115 crew are at NASA's Kennedy Space Center for Terminal Countdown Demonstration Test activities such as the M-113 training. They will also practice emergency egress from the launch pad and take part in a simulated launch countdown. Liftoff of mission STS-115 aboard Space Shuttle Atlantis is scheduled in a window beginning Aug. 27. Photo credit: NASA/Cory Huston
Release Date 08/08/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - STS-115 Commander Brent Jett takes his turn at the wheel, driving the M-113 armored personnel carrier. Also on the ride are (left to right) Capt. George Hoggard, who is astronaut rescue team leader, and Mission Specialists Joseph Tanner, Steven MacLean and Daniel Burbank. The STS-115 crew are at NASA's Kennedy Space Center for Terminal Countdown Demonstration Test activities such as the M-113 training. They will also practice emergency egress from the launch pad and take part in a simulated launch countdown. Liftoff of mission STS-115 aboard Space Shuttle Atlantis is scheduled in a window beginning Aug. 27. Photo credit: NASA/Cory Huston
Release Date 08/08/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-115 crew gets instructions about using the slidewire baskets for emergency egress from the space shuttle on the pad. In the front, at left, is Pilot Chris Ferguson, at right is Commander Brent Jett. The other crew members are Mission Specialists Heidemarie Stefanyshyn-Piper, Joseph Tanner and Daniel Burbank. MacLean is with the Canadian Space Agency. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/09/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - STS-115 crew members take another look at an M-113 armored personnel carrier that could be used to move quickly away from the launch pad in the event of an emergency. From left are Commander Brent Jett, Pilot Chris Ferguson and Mission Specialists Heidemarie Stefanyshyn-Piper and Joseph Tanner. In the foreground are Mission Specialists Daniel Burbank and Steven MacLean, who is with the Canadian Space Agency. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/09/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-115 crew members are checking the fit of their launch and entry suits before tomorrow's simulated launch countdown. In the chair is Mission Specialist Daniel Burbank. The simulation is the culmination of Terminal Countdown Demonstration Test activities at NASA's Kennedy Space Center. The crew is getting ready for their launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. During the 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/08/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - STS-115 Commander Brent Jett is ready to practice driving the M-113 armored personnel carrier. Behind him are seen Mission Specialists Daniel Burbank and Steven MacLean, who represents the Canadian Space Agency. The STS-115 crew are at NASA's Kennedy Space Center for Terminal Countdown Demonstration Test activities such as the M-113 training. They will also practice emergency egress from the launch pad and take part in a simulated launch countdown. Liftoff of mission STS-115 aboard Space Shuttle Atlantis is scheduled in a window beginning Aug. 27. Photo credit: NASA/Cory Huston
Release Date 08/08/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-115 crew members are suiting up for their simulated launch countdown. Shown Shown here is Mission Specialist Daniel Burbank. The mission crew is at KSC for Terminal Countdown Demonstration Test (TCDT) activities that are preparation for launch on Space Shuttle Atlantis, scheduled to take place in a window that opens Aug. 27. The TCDT has included emergency egress training as well as the simulation. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/10/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - In the payload changeout room on Launch Pad 39B, STS-115 crew members look over the mission payload one more time before launch. From left are mission specialists Heidemarie Stefanyshyn-Piper, Steven MacLean, representing the Canadian Space Agency, Daniel Burbank and Joseph Tanner. The mission crew has been at KSC to take part in Terminal Countdown Demonstration Test activities, which include emergency egress training, a simulated launch countdown and the payload familiarization. The TCDT is a prelaunch preparation for the mission that is scheduled to lift off in a window opening Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/10/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - In the payload changeout room on Launch Pad 39B, STS-115 crew members look over the mission payload one more time before launch. Looking up at the payload from left, are mission specialists Steven MacLean, who represents the Canadian Space Agency, Heidemarie Stefanyshyn-Piper, Joseph Tanner, and Daniel Burbank. The mission crew has been at KSC to take part in Terminal Countdown Demonstration Test activities, which include emergency egress training, a simulated launch countdown and the payload familiarization. The TCDT is a prelaunch preparation for the mission that is scheduled to lift off in a window opening Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/10/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Following a simulated launch countdown and emergency egress practice, the STS-115 crew gathers on the 215-foot level of the fixed service structure on Launch Pad 39B. From left are Pilot Christopher Ferguson, Mission Specialists Heidemarie Stefanyshyn-Piper and Joseph Tanner, Commander Brent Jett, and Mission Specialists Steven MacLean and Daniel Burbank. MacLean is with the Canadian Space Agency. The TCDT is a prelaunch preparation for the mission that is scheduled to lift off in a window opening Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/10/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Following a simulated launch countdown and emergency egress practice, the STS-115 crew gathers on the 215-foot level of the fixed service structure on Launch Pad 39B. From left are Mission Specialists Joseph Tanner and Heidemarie Stefanyshyn-Piper, Commander Brent Jett, Pilot Christopher Ferguson, and Mission Specialists Steven MacLean and Daniel Burbank. MacLean is with the Canadian Space Agency. Behind them loom the top of Space Shuttle Atlantis' external tank and one of the solid rocket boosters. The TCDT is a prelaunch preparation for the mission that is scheduled to lift off in a window opening Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/10/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - In the payload changeout room on Launch Pad 39B, STS-115 crew members look over the mission payload one more time before launch. From front to back are mission specialists Joseph Tanner, Daniel Burbank, Steven MacLean, who represents the Canadian Space Agency, and Heidemarie Stefanyshyn-Piper. The mission crew has been at KSC to take part in Terminal Countdown Demonstration Test activities, which include emergency egress training, a simulated launch countdown and the payload familiarization. The TCDT is a prelaunch preparation for the mission that is scheduled to lift off in a window opening Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/10/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - In the payload changeout room on Launch Pad 39B, STS-115 crew members look over the mission payload one more time before launch. From left are mission specialists Heidemarie Stefanyshyn-Piper, Steven MacLean, representing the Canadian Space Agency, Daniel Burbank and Joseph Tanner. The mission crew has been at KSC to take part in Terminal Countdown Demonstration Test activities, which include emergency egress training, a simulated launch countdown and the payload familiarization. The TCDT is a prelaunch preparation for the mission that is scheduled to lift off in a window opening Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/10/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - In the payload changeout room on Launch Pad 39B, STS-115 crew members look over the mission payload one more time before launch. From left are mission specialists Joseph Tanner, Daniel Burbank, Steven MacLean, who represents the Canadian Space Agency, and Heidemarie Stefanyshyn-Piper (standing). The mission crew has been at KSC to take part in Terminal Countdown Demonstration Test activities, which include emergency egress training, a simulated launch countdown and the payload familiarization. The TCDT is a prelaunch preparation for the mission that is scheduled to lift off in a window opening Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/10/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Following a simulated launch countdown and emergency egress practice, the STS-115 crew gathers on the 215-foot level of the fixed service structure on Launch Pad 39B. From left are Pilot Christopher Ferguson, Mission Specialists Heidemarie Stefanyshyn-Piper and Joseph Tanner, Commander Brent Jett, and Mission Specialists Steven MacLean and Daniel Burbank. MacLean is with the Canadian Space Agency. Behind them loom the top of Space Shuttle Atlantis' external tank and one of the solid rocket boosters. The TCDT is a prelaunch preparation for the mission that is scheduled to lift off in a window opening Aug. 27. During their 11-day mission to the International Space Station, the STS-115 crew will continue construction of the station and attach the payload elements, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Cory Huston
Release Date 08/10/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The crew of mission STS-115 stop to talk to the media after arriving at NASA Kennedy Space Center's Shuttle Landing Facility to prepare for launch on Aug. 27 to the International Space Station. Seen here, left to right, are Mission Specialists Steven MacLean and Daniel Burbank, Pilot Christopher Ferguson, Commander Brent Jett, and Mission Specialists Heidemarie Stefanyshyn-Piper and Joseph Tanner. The mission will deliver and install the 17-and-a-half-ton P3/P4 truss segment to the port side of the integrated truss system on the orbital outpost. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. STS-115 is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett
Release Date 08/24/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The crew of mission STS-115 arrives at NASA Kennedy Space Center's Shuttle Landing Facility to prepare for launch on Aug. 27 to the International Space Station. Seen here is Mission Specialist Daniel Burbank, who will be making his second flight on the shuttle. The mission will deliver and install the 17-and-a-half-ton P3/P4 truss segment to the port side of the integrated truss system on the orbital outpost. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. STS-115 is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett
Release Date 08/24/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - STS-115 Mission Specialist Daniel Burbank talks with a suit technician during suit check. Burbank will me making his second flight on a shuttle. He and other crew members are checking their launch suits and apparatus before the launch on Space Shuttle Atlantis on Aug. 27. Mission STS-115 is scheduled to lift off about 4:30 p.m. Aug. 27. The crew will deliver and install the P3/P4 segment to the port side of the integrated truss system on the International Space Station. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. The mission is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett
Release Date 08/25/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - STS-115 Mission Specialist Daniel Burbank checks the equipment on the head set in his launch suit. Burbank is making his second flight on a shuttle. He and other crew members are checking their launch suits and apparatus before the launch on Space Shuttle Atlantis on Aug. 27. Mission STS-115 is scheduled to lift off about 4:30 p.m. Aug. 27. The crew will deliver and install the P3/P4 segment to the port side of the integrated truss system on the International Space Station. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. The mission is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett
Release Date 08/25/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - STS-115 Mission Specialist Daniel Burbank checks the fit of his gloves. Burbank is making his second flight on a shuttle. He and other crew members are checking their launch suits and apparatus before the launch on Space Shuttle Atlantis on Aug. 27. Mission STS-115 is scheduled to lift off about 4:30 p.m. Aug. 27. The crew will deliver and install the P3/P4 segment to the port side of the integrated truss system on the International Space Station. The truss includes a new set of photovoltaic solar arrays. When unfurled to their full length of 240 feet, the arrays will provide additional power for the station in preparation for the delivery of international science modules over the next two years. The mission is expected to last 11 days and includes three scheduled spacewalks. Photo credit: NASA/Kim Shiflett
Release Date 08/25/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - After suiting up, the STS-115 mission crew exits the Operations and Checkout Building to board the Astrovan to Launch Pad 39B. On the left, front to back, are Pilot Christopher Ferguson and Mission Specialists Steven MacLean and Heidemarie Stefanyshyn-Piper. On the right, front to back, are Commander Brent Jett and Mission Specialists Daniel Burbank and Joseph Tanner. The launch attempt on Sept. 8 was scrubbed due to an issue with a fuel cut-off sensor system inside the external fuel tank. This is one of several systems that protect the shuttle's main engines by triggering their shutdown if fuel runs unexpectedly low. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Kim Shiflett
Release Date 09/09/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building at NASA Kennedy Space Center, STS-115 Mission Specialist Daniel Burbank dons his launch and re-entry suit before heading to the launch pad for another attempt at liftoff. The launch attempt on Sept. 8 was scrubbed due to an issue with a fuel cut-off sensor system inside the external fuel tank. This is one of several systems that protect the shuttle's main engines by triggering their shutdown if fuel runs unexpectedly low. During the STS-115 mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the ISS. STS-115 is scheduled to last 11 days with a planned landing at KSC. Photo credit: NASA/Kim Shiflett
Release Date 09/09/2006
1 2
1-50 of 85