Browse All : Images by Chris Hadfield and Robert Curbeam

Printer Friendly
1-3 of 3
     
     
Salimbeti Andrea, with the I …
Description Salimbeti Andrea, with the Italian company Alenia Aerospazio, and STS-100 Mission Specialists Robert Curbeam and Chris Hadfield (Canada) inspect the opening to the Multi-Purpose Logistics Module (MPLM) that will be launched on STS-100 on Dec. 2, 1999. The Italian-built MPLM will be carried in the payload bay of the Shuttle orbiter, and will provide storage and additional work space for up to two astronauts when docked to the International Space Station. Named Leonardo, the MPLM is the first of three modules being provided by Alenia. The second MPLM, to be handed over in April 1999, is named Raffaello. A third module, to be named Donatello, is due to be delivered in October 2000 for launch in January 2001
Release Date 08/13/1998
STS-100 Mission Specialist C …
Description STS-100 Mission Specialist Chris Hadfield (Canada), Salimbeti Andrea (of Alenia Aerospazio), observers Astronaut Winston Scott and Scott McIntyre, and Mission Specialist Robert Curbeam take a close look at the opening of the Multi-Purpose Logistics Module (MPLM) that will be launched on STS-100 on Dec. 2, 1999. Behind them is Paolo Prato , a systems engineer with Alenia. The MPLM will be carried in the payload bay of the Shuttle orbiter, and will provide storage and additional work space for up to two astronauts when docked to the International Space Station. Named Leonardo, the MPLM is the first of three modules being provided by Alenia Aerospazio. The second MPLM, to be handed over in April 1999, is named Raffaello. A third module, to be named Donatello, is due to be delivered in October 2000 for launch in January 2001
Release Date 08/13/1998
(Left to right) STS-100 Miss …
Description (Left to right) STS-100 Mission Specialist Chris Hadfield, Salimbeti Andrea of Alenia Aerospazio, observer Astronaut Winston Scott, and Mission Specialist Robert Curbeam examine the interior of the Multi-Purpose Logistics Module (MPLM) Leonardo. The Italian-built MPLM will be carried in the payload bay of the Shuttle orbiter, and will provide storage and additional work space for up to two astronauts when docked to the International Space Station. It is expected to fly on the Space Shuttle Endeavour scheduled for launch on Dec. 2, 1999. Leonardo is the first of three modules being provided by Alenia. The second MPLM, to be handed over in April 1999, is named Raffaello. A third module, to be named Donatello, is due to be delivered in October 2000 for launch in January 2001
Release Date 08/13/1998
1-3 of 3