Browse All : Images by Brian Duffy of Florida from 2000

Printer Friendly
1 2 3
1-50 of 110
     
     
STS-92 - Discovery Fly-away …
Title STS-92 - Discovery Fly-away - return to Florida
Description Carrying the Space Shuttle Discovery piggyback, one of NASA's modified Boeing 747 Shuttle Carrier Aircraft lifts off the runway at Edwards Air Force Base, California. The Discovery was ferried from NASA's Dryden Flight Research Center at Edwards to NASA's Kennedy Space Center in Florida on November 2, 2000, after extensive post-landing servicing and ferry flight preparations. STS-92 was the 100th mission since the fleet of four Space Shuttles began flying in 1981. (Due to schedule changes, missions are not always launched in the order that was originally planned.) The almost 13-day mission, the 46th Shuttle mission to land at Edwards, was the last construction mission for the International Space Station prior to the first scientists taking up residency in the orbiting space laboratory the following month. The seven-member crew on STS-92 included mission specialists Koichi Wakata, Michael Lopez-Alegria, Jeff Wisoff, Bill McArthur and Leroy Chiao, pilot Pam Melroy and mission commander Brian Duffy.
Date 11.02.2000
STS-92 - Discovery Fly-away …
Title STS-92 - Discovery Fly-away - return to Florida
Description One of NASA's two modified Boeing 747 Shuttle Carrier Aircraft with the Space Shuttle orbiter Discovery on its back climbs out after takeoff from Edwards Air Force Base, California. The Discovery was ferried from NASA's Dryden Flight Research Center at Edwards to NASA's Kennedy Space Center in Florida on November 2, 2000, after extensive post-landing servicing and ferry flight preparations. STS-92 was the 100th mission since the fleet of four Space Shuttles began flying in 1981. (Due to schedule changes, missions are not always launched in the order that was originally planned.) The almost 13-day mission, the 46th Shuttle mission to land at Edwards, was the last construction mission for the International Space Station prior to the first scientists taking up residency in the orbiting space laboratory the following month. The seven-member crew on STS-92 included mission specialists Koichi Wakata, Michael Lopez-Alegria, Jeff Wisoff, Bill McArthur and Leroy Chiao, pilot Pam Melroy and mission commander Brian Duffy.
Date 11.02.2000
STS-92 - Orbiter in Mate-Dem …
Title STS-92 - Orbiter in Mate-Demate Device (MDD)
Description The early-morning Sun bathes the Space Shuttle Discovery in hues of purple, pink and gold as it is encased in the Mate-Demate Device (MDD) at NASA's Dryden Flight Research Center at Edwards, California. The gantry-like MDD structure is used to prepare the shuttle for its ferry flight back to the Kennedy space Center in Florida, including mounting the shuttle atop NASA's modified Boeing 747 Shuttle Carrier Aircraft. STS-92 was the 100th mission since the fleet of four Space Shuttles began flying in 1981. (Due to schedule changes, missions are not always launched in the order that was originally planned.) The almost 13-day mission, the 46th Shuttle mission to land at Edwards, was the last construction mission for the International Space Station prior to the first scientists taking up residency in the orbiting space laboratory the following month. The seven-member crew on STS-92 included mission specialists Koichi Wakata, Michael Lopez-Alegria, Jeff Wisoff, Bill McArthur and Leroy Chiao, pilot Pam Melroy and mission commander Brian Duffy.
Date 10.29.2000
STS-92 - Orbiter in Mate-Dem …
Title STS-92 - Orbiter in Mate-Demate Device (MDD) - closeup view from front
Description The Space Shuttle Discovery is centered in the Mate-Demate Device (MDD) at NASA's Dryden Flight Research Center at Edwards, California. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA's modified Boeing 747 Shuttle Carrier Aircraft. STS-92 was the 100th mission since the fleet of four Space Shuttles began flying in 1981. (Due to schedule changes, missions are not always launched in the order that was originally planned.) The almost 13-day mission was the last construction mission for the International Space Station prior to the first scientists taking up residency in the orbiting space laboratory the following month. The seven-member crew on STS-92 included mission specialists Koichi Wakata, Michael Lopez-Alegria, Jeff Wisoff, Bill McArthur and Leroy Chiao, pilot Pam Melroy and mission commander Brian Duffy.
Date 10.29.2000
STS-92 - Orbiter in Mate-Dem …
Title STS-92 - Orbiter in Mate-Demate Device (MDD) at sunrise with Shuttle Carrier Aircraft (SCA) in backg
Description The early-morning Sun provides a golden backdrop to the Space Shuttle Discovery encased in the Mate-Demate Device (MDD) at NASA's Dryden Flight Research Center at Edwards, California. The gantry-like MDD structure is used to prepare the shuttle for its ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA's modified Boeing 747 Shuttle Carrier Aircraft. STS-92 was the 100th mission since the fleet of four Space Shuttles began flying in 1981. (Due to schedule changes, missions are not always launched in the order that was originally planned.) The almost 13-day mission was the last construction mission for the International Space Station prior to the first scientists taking up residency in the orbiting space laboratory the following month. The seven-member crew on STS-92 included mission specialists Koichi Wakata, Michael Lopez-Alegria, Jeff Wisoff, Bill McArthur and Leroy Chiao, pilot Pam Melroy and mission commander Brian Duffy.
Date 10.29.2000
STS-92 - Orbiter in Mate-Dem …
Title STS-92 - Orbiter in Mate-Demate Device (MDD) at sunrise with Shuttle Carrier Aircraft (SCA) in backg
Description The early-morning Sun bathes the Space Shuttle Discovery in hues of purple, pink and gold as it is encased in the Mate-Demate Device (MDD) at NASA's Dryden Flight Research Center at Edwards, California. The gantry-like MDD structure is used to prepare the shuttle for its ferry flight back to the Kennedy space Center in Florida, including mounting the shuttle atop NASA's modified Boeing 747 Shuttle Carrier Aircraft. STS-92 was the 100th mission since the fleet of four Space Shuttles began flying in 1981. (Due to schedule changes, missions are not always launched in the order that was originally planned.) The almost 13-day mission, the 46th Shuttle mission to land at Edwards, was the last construction mission for the International Space Station prior to the first scientists taking up residency in the orbiting space laboratory the following month. The seven-member crew on STS-92 included mission specialists Koichi Wakata, Michael Lopez-Alegria, Jeff Wisoff, Bill McArthur and Leroy Chiao, pilot Pam Melroy and mission commander Brian Duffy.
Date 10.29.2000
STS-92 - Shuttle Carrier Air …
Title STS-92 - Shuttle Carrier Aircraft (SCA)
Description One of NASA's two modified Boeing 747 Shuttle Carrier Aircraft is bathed in the morning Sun at NASA's Dryden Flight Research Center at Edwards, California. The modified jumbo jetliners are used to ferry the Space Shuttle orbiters between Dryden and the Kennedy Space Center in Florida and Boeing's Reusable Space Systems modification facility at Palmdale, California. Features which distinguish the two SCAs from standard 747 jetliners are three struts, with associated interior structural strengthening, which protrude from the top of the fuselage (two aft, one forward) on which the orbiter is attached, and two additional vertical stabilizers, one on each end of the standard horizontal stabilizer, to enhance directional stability. All interior furnishings and equipment aft of the forward No. 1 doors have also been removed to reduce weight. The two SCAs are under the operational control of NASA's Johnson Space Center, Houston, Texas. STS-92 was the 100th mission since the fleet of four Space Shuttles began flying in 1981. (Due to schedule changes, missions are not always launched in the order that was originally planned.) The almost 13-day mission, the 46th Shuttle mission to land at Edwards, was the last construction mission for the International Space Station prior to the first scientists taking up residency in the orbiting space laboratory the following month. The seven-member crew on STS-92 included mission specialists Koichi Wakata, Michael Lopez-Alegria, Jeff Wisoff, Bill McArthur and Leroy Chiao, pilot Pam Melroy and mission commander Brian Duffy.
Date 10.29.2000
STS-92 - Towing of Shuttle D …
Title STS-92 - Towing of Shuttle Discovery and Boeing 747 Shuttle Carrier Aircraft (SCA)
Description The Space Shuttle Discovery sits atop one of NASA's modified Boeing 747 Shuttle Carrier Aircraft as the unusual piggyback duo is towed along a taxiway at NASA's Dryden Flight Research Center at Edwards, California. The Discovery was ferried from NASA Dryden to NASA's Kennedy Space Center in Florida on November 2, 2000, after extensive pre-ferry servicing and preparations. STS-92 was the 100th mission since the fleet of four Space Shuttles began flying in 1981. (Due to schedule changes, missions are not always launched in the order that was originally planned.) The almost 13-day mission, the 46th Shuttle mission to land at Edwards, was the last construction mission for the International Space Station prior to the first scientists taking up residency in the orbiting space laboratory the following month. The seven-member crew on STS-92 included mission specialists Koichi Wakata, Michael Lopez-Alegria, Jeff Wisoff, Bill McArthur and Leroy Chiao, pilot Pam Melroy and mission commander Brian Duffy.
Date 11.02.2000
General Description STS-92 Shuttle Mission Imagery
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Members of the STS-92 crew pose for the photographer during a break from checking out Discovery's payload bay in the Orbiter Processing Facility bay 1. Their mission, the fourth U.S. flight to the ISS, includes as payload the Integrated Truss Structure Z1, an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power, Ku-band communication to support early science capability and U.S. television, and PMA-3 to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The crew comprises Mission Commander Brian Duffy, Pilot Pamela Melroy, and Mission Specialists Koichi Wakata, Leroy Chiao, Peter "Jeff" Wisoff, Michael Lopez-Alegria, and William McArthur. Launch of STS-92 is scheduled for Sept. 21, 2000. Wakata is with the National Space Development Agency of Japan
Release Date 04/20/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Members of the STS-92 crew take a moment for discussion while checking out the payload bay of the orbiter Discovery in the Orbiter Processing Facility bay 1. Their mission, the fourth U.S. flight to the ISS, includes as payload the Integrated Truss Structure Z1, an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power, Ku-band communication to support early science capability and U.S. television, and PMA-3 to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The crew comprises Mission Commander Brian Duffy, Pilot Pamela Melroy, and Mission Specialists Koichi Wakata, Leroy Chiao, Peter "Jeff" Wisoff, Michael Lopez-Alegria, and William McArthur. Launch of STS-92 is scheduled for Sept. 21, 2000. Wakata is with the National Space Development Agency of Japan
Release Date 04/20/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, members of the STS-92 crew examine equipment that will be part of their mission to the International Space Station (ISS). The fourth U.S. flight to the ISS, the mission payload includes the Integrated Truss Structure Z1, an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power, Ku-band communication to support early science capability and U.S. television, and PMA-3 to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The crew comprises Mission Commander Brian Duffy, Pilot Pamela Melroy, and Mission Specialists Koichi Wakata, Leroy Chiao, Peter "Jeff" Wisoff, Michael Lopez-Alegria, and William McArthur. Launch of STS-92 is scheduled for Sept. 21, 2000. Wakata is with the National Space Development Agency of Japan.
Release Date 04/20/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility bay 1, members of the STS-92 crew examine equipment that will be part of their mission to the International Space Station (ISS). The fourth U.S. flight to the ISS, the mission payload includes the Integrated Truss Structure Z1, an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power, Ku-band communication to support early science capability and U.S. television, and PMA-3 to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The crew comprises Mission Commander Brian Duffy, Pilot Pamela Melroy, and Mission Specialists Koichi Wakata, Leroy Chiao, Peter "Jeff" Wisoff, Michael Lopez-Alegria, and William McArthur. Launch of STS-92 is scheduled for Sept. 21, 2000. Wakata is with the National Space Development Agency of Japan
Release Date 04/20/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, members of the STS-92 crew get a close look at some of the equipment, such as the Integrated Truss Structure Z1, to fly on their mission. STS-92 is the fifth U.S. flight in the construction of the International Space Station. At left is Commander Brian Duffy, with their backs to the camera are Mission Specialist Koichi Wakata and Pilot Pamela A. Melroy. The Z1 is an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. Another part of the payload is a pressurized mating adapter, PMA-3, to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The other crew members are Mission Specialists Leroy Chiao, Peter J.K. Wisoff, Michael E. Lopez-Alegria, and William S. McArthur Jr. Wakata is with the National Space Development Agency of Japan. Launch of STS-92 is scheduled for Sept. 21, 2000
Release Date 04/21/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, members of the STS-92 crew get a close look at some of the equipment, such as the Integrated Truss Structure Z1, to fly on their mission. STS-92 is the fifth U.S. flight in the construction of the International Space Station. At left is Pilot Pamela A. Melroy, at right is Mission Specialist Koichi Wakata, who is with the National Space Development Agency of Japan. The Z1 is an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. Another part of the payload is a pressurized mating adapter, PMA-3, to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The other crew members are Mission Commander Brian Duffy and Mission Specialists Leroy Chiao, Peter J.K. Wisoff, Michael E. Lopez-Alegria, and William S. McArthur Jr. Launch of STS-92 is scheduled for Sept. 21, 2000
Release Date 04/21/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, members of the STS-92 crew get a close look at some of the equipment, such as the Integrated Truss Structure Z1, to fly on their mission. STS-92 is the fifth U.S. flight in the construction of the International Space Station. At left is Mission Specialist Koichi Wakata, who is with the National Space Development Agency of Japan. The Z1 is an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. Another part of the payload is a pressurized mating adapter, PMA-3, to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The other crew members are Mission Commander Brian Duffy, Pilot Pamela A. Melroy, and Mission Specialists Leroy Chiao, Peter J.K. Wisoff, Michael E. Lopez-Alegria, and William S. McArthur Jr. Launch of STS-92 is scheduled for Sept. 21, 2000
Release Date 04/21/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- The STS-92 crew pose in front of the Integrated Truss Structure Z1, an element of the International Space Station that will be part of the mission payload. STS-92 is the fifth U.S. flight in the construction of the International Space Station. Standing left to right are Mission Specialists William S. McArthur Jr., Leroy Chiao, and Michael E. Lopez-Alegria, Pilot Pamela A. Melroy, Mission Specialists Peter J.K. Wisoff and Koichi Wakata, and Commander Brian Duffy. Wakata is with the National Space Development Agency of Japan. The Z1 is an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. Another part of the payload is a pressurized mating adapter, PMA-3, to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. Launch of STS-92 is scheduled for Sept. 21, 2000
Release Date 04/21/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, members of the STS-92 crew get a close look at some of the equipment, such as the Integrated Truss Structure Z1, to fly on their mission. STS-92 is the fifth U.S. flight in the construction of the International Space Station. At left is Mission Specialist Koichi Wakata, who is with the National Space Development Agency of Japan . The Z1 is an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. Another part of the payload is a pressurized mating adapter, PMA-3, to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. Other crew members are Mission Commander Brian Duffy, Pilot Pamela A. Melroy, and Mission Specialists Leroy Chiao, Peter J.K. Wisoff, Michael E. Lopez-Alegria, and William S. McArthur Jr. Launch of STS-92 is scheduled for Sept. 21, 2000
Release Date 04/21/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, members of the STS-92 crew get hands-on experience with some of the equipment, such as the Integrated Truss Structure Z1, to fly on their mission. STS-92 is the fifth U.S. flight in the construction of the International Space Station. The Z1 is an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. Another part of the payload is a pressurized mating adapter, PMA-3, to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The crew comprises Mission Commander Brian Duffy, Pilot Pamela A. Melroy, and Mission Specialists Koichi Wakata, Leroy Chiao, Peter J.K. Wisoff, Michael E. Lopez-Alegria, and William S. McArthur Jr. Wakata is with the National Space Development Agency of Japan. Launch of STS-92 is scheduled for Sept. 21, 2000
Release Date 04/21/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, members of the STS-92 crew get a close look at the Integrated Truss Structure Z1, part of the payload on their mission. STS-92 is the fifth U.S. flight in the construction of the International Space Station. The crew comprises Mission Commander Brian Duffy, Pilot Pamela A. Melroy, and Mission Specialists Koichi Wakata, Leroy Chiao, Peter J.K. Wisoff, Michael E. Lopez-Alegria, and William S. McArthur Jr. Wakata is with the National Space Development Agency of Japan. The Z1 is an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. Another part of the payload is a pressurized mating adapter, PMA-3, to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. Launch of STS-92 is scheduled for Sept. 21, 2000
Release Date 04/21/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, members of the STS-92 crew get a close look at some of the equipment, such as the Integrated Truss Structure Z1, to fly on their mission. STS-92 is the fifth U.S. flight in the construction of the International Space Station. At right are Mission Specialists Leroy Chiao and William S. McArthur Jr. (pointing). Other crew members are Commander Brian Duffy, Pilot Pamela A. Melroy, and Mission Specialists Koichi Wakata, Peter J.K. Wisoff, and Michael E. Lopez-Alegria. Wakata is with the National Space Development Agency of Japan. The Z1 is an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. Another part of the payload is a pressurized mating adapter, PMA-3, to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. Launch of STS-92 is scheduled for Sept. 21, 2000
Release Date 04/21/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, STS-92 Pilot Pamela A. Melroy gets a close look at the Integrated Truss Structure Z1 that will fly on the mission, the fifth U.S. flight in the construction of the International Space Station. Other crew members are Commander Brian Duffy, and Mission Specialists Koichi Wakata, Leroy Chaio, Peter J.K. Wisoff, Michael E. Lopez-Alegria, and William S. McArthur Jr. Wakata is with the National Space Development Agency of Japan. The Z1 is an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power. Another part of the payload is a pressurized mating adapter, PMA-3, to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. Launch of STS-92 is scheduled for Sept. 21, 2000
Release Date 04/21/2000
The Zenith-1 (Z-1) Truss is …
Description The Zenith-1 (Z-1) Truss is officially presented to NASA by The Boeing Co. on the Space Station Processing Facility floor on July 31. STS-92 Commander Col. Brian Duffy, comments on the presentation. Pictured are The Boeing Co. processing team and STS-92 astronauts. The Z-1 Truss is the cornerstone truss of the International Space Station and is scheduled to fly in Space Shuttle Discovery's payload pay on STS-92 targeted for launch Oct. 5, 2000. The Z-1 is considered a cornerstone truss because it carries critical components of the Station's attitude, communications, thermal and power control systems as well as four control moment gyros, high and low gain antenna systems, and two plasma contactor units used to disperse electrical charge build-ups. The Z-1 truss and a Pressurized Mating Adapter (PMA-3), also flying to the Station on the same mission, will be the first major U.S. elements flown to the ISS aboard the Shuttle since the launch of the Unity element in December 1998
Release Date 07/31/2000
The Zenith-1 (Z-1) Truss is …
Description The Zenith-1 (Z-1) Truss is officially presented to NASA by The Boeing Co. on the Space Station Processing Facility floor on July 31. STS-92 Commander Col. Brian Duffy, comments on the presentation. At his side is Tip Talone, NASA director of International Space Station and Payload Processing at KSC. Talone and Col. Duffy received a symbolic key for the truss from John Elbon, Boeing director of ISS ground operations. The Z-1 Truss is the cornerstone truss of the International Space Station and is scheduled to fly in Space Shuttle Discovery's payload pay on STS-92 targeted for launch Oct. 5, 2000. The Z-1 is considered a cornerstone truss because it carries critical components of the Station's attitude, communications, thermal and power control systems as well as four control moment gyros, high and low gain antenna systems, and two plasma contactor units used to disperse electrical charge build-ups. The Z-1 truss and a Pressurized Mating Adapter (PMA-3), also flying to the Station on the same mission, will be the first major U.S. elements flown to the ISS aboard the Shuttle since the launch of the Unity element in December 1998
Release Date 07/31/2000
The Zenith-1 (Z-1) Truss is …
Description The Zenith-1 (Z-1) Truss is officially presented to NASA by The Boeing Co. on the Space Station Processing Facility floor on July 31. Astronauts from the STS-92 crew look on while their commander, Col. Brian Duffy, and Tip Talone, NASA director of International Space Station and Payload Processing at KSC, receive a symbolic key from John Elbon, Boeing director of ISS ground operations. The Z-1 Truss is the cornerstone truss of the International Space Station and is scheduled to fly in Space Shuttle Discovery's payload pay on STS-92 targeted for launch Oct. 5, 2000. The Z-1 is considered a cornerstone truss because it carries critical components of the Station's attitude, communications, thermal and power control systems as well as four control moment gyros, high and low gain antenna systems, and two plasma contactor units used to disperse electrical charge build-ups. The Z-1 truss and a Pressurized Mating Adapter (PMA-3), also flying to the Station on the same mission, will be the first major U.S. elements flown to the ISS aboard the Shuttle since the launch of the Unity element in December 1998
Release Date 07/31/2000
The Zenith-1 (Z-1) Truss is …
Description The Zenith-1 (Z-1) Truss is officially presented to NASA by The Boeing Co. on the Space Station Processing Facility floor on July 31. STS-92 Commander Col. Brian Duffy discusses the significance of the Z-1 Truss during a press conference after the presentation. The Z-1 Truss is the cornerstone truss of the International Space Station and is scheduled to fly in Space Shuttle Discovery's payload pay on STS-92 targeted for launch Oct. 5, 2000. The Z-1 is considered a cornerstone truss because it carries critical components of the Station's attitude, communications, thermal and power control systems as well as four control moment gyros, high and low gain antenna systems, and two plasma contactor units used to disperse electrical charge build-ups. The Z-1 truss and a Pressurized Mating Adapter (PMA-3), also flying to the Station on the same mission, will be the first major U.S. elements flown to the ISS aboard the Shuttle since the launch of the Unity element in December 1998
Release Date 07/31/2000
The STS-92 crew strides acro …
Description The STS-92 crew strides across the runway at KSC?s Shuttle Landing Facility, heading toward the aircraft that will take them back to Houston. They were at KSC for Crew Equipment Interface Test (CEIT) activities, looking over their mission payload and related equipment. From left are Mission Specialists Bill McArthur and Jeff Wisoff, Pilot Pam Melroy, Mission Specialist Michael Lopez-Alegria, Commander Brian Duffy and Mission Specialist Koichi Wakata, who is with the Japanese space agency. Not seen is Mission Specialist Leroy Chiao, who was also at KSC for the CEIT. STS-92 is scheduled to launch Oct. 5 on Shuttle Discovery from Launch Pad 39A on the fifth flight to the International Space Station. Discovery will carry the Integrated Truss Structure (ITS) Z1, the PMA-3, Ku-band Communications System, and Control Moment Gyros (CMGs)
Release Date 07/12/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- On a platform inside the payload bay of Discovery, STS-92 Mission Specialists Leroy Chiao and Bill McArthur take a close look at Pressurized Mating Adapter-3 (PMA-3). They and other crew members Commander Brian Duffy, Pilot Pam Melroy and Mission Specialists Koichi Wakata, Jeff Wisoff, and Michael Lopez-Alegria are at KSC to take part in Crew Equipment Interface Test activities. Discovery is in the Orbiter Processing Facility bay 1. STS-92 is scheduled to launch Oct. 5 on Shuttle Discovery from Launch Pad 39A on the fifth flight to the International Space Station. Discovery will carry the Integrated Truss Structure (ITS) Z1, the PMA-3, Ku-band Communications System, and Control Moment Gyros (CMGs)
Release Date 07/12/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- STS-92 Mission Specialist Bill McArthur (with tool in hand) gets a close look at the Pressurized Mating Adapter-3 (PMA-3) in the payload bay of orbiter Discovery. He and other crew members Commander Brian Duffy, Pilot Pam Melroy and Mission Specialists Koichi Wakata, Leroy Chiao, Jeff Wisoff, and Michael Lopez-Alegria are at KSC to take part in Crew Equipment Interface Test activities. Discovery is in the Orbiter Processing Facility bay 1. STS-92 is scheduled to launch Oct. 5 on Shuttle Discovery from Launch Pad 39A on the fifth flight to the International Space Station. Discovery will carry the Integrated Truss Structure (ITS) Z1, the PMA-3, Ku-band Communications System, and Control Moment Gyros (CMGs
Release Date 07/12/2000
In the Orbiter Processing Fa …
Description In the Orbiter Processing Facility bay 1, STS-92 crew members, along with Boeing workers, look closely at the tools they will be using on their mission. The crew comprises Commander Brian Duffy, Pilot Pam Melroy and Mission Specialists Koichi Wakata, Leroy Chiao, Jeff Wisoff, Michael Lopez-Alegria and Bill McArthur. STS-92 is scheduled to launch Oct. 5 on Shuttle Discovery from Launch Pad 39A on the fifth flight to the International Space Station. Discovery will carry the Integrated Truss Structure (ITS) Z1, Pressurized Mating Adapter 3, Ku-band Communications System, and Control Moment Gyros (CMGs)
Release Date 07/12/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Being lowered into the payload bay of Discovery for a closer look at the payload are STS-92 Mission Specialists Leroy Chiao (second from left) and Bill McArthur (far right), accompanied by Boeing workers. In the foreground is the Pressurized Mating Adapter-3. They and other crew members Commander Brian Duffy, Pilot Pam Melroy and Mission Specialists Koichi Wakata, Jeff Wisoff and Michael Lopez-Alegria are taking part in Crew Equipment Interface Test activities. STS-92 is scheduled to launch Oct. 5 on Shuttle Discovery from Launch Pad 39A on the fifth flight to the International Space Station. Discovery will carry the Integrated Truss Structure (ITS) Z1, the PMA-3, Ku-band Communications System, and Control Moment Gyros (CMGs)
Release Date 07/12/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- STS-92 Mission Specialist Bill McArthur (with tool in hand) gets a close look at the Pressurized Mating Adapter-3 in the payload bay of orbiter Discovery. He and other crew members Commander Brian Duffy, Pilot Pam Melroy and Mission Specialists Koichi Wakata, Leroy Chiao, Jeff Wisoff, and Michael Lopez-Alegria are at KSC to take part in Crew Equipment Interface Test activities. Discovery is in the Orbiter Processing Facility bay 1. STS-92 is scheduled to launch Oct. 5 on Shuttle Discovery from Launch Pad 39A on the fifth flight to the International Space Station. Discovery will carry the Integrated Truss Structure (ITS) Z1, the PMA-3, Ku-band Communications System, and Control Moment Gyros (CMGs)
Release Date 07/12/2000
Checking out the tools they …
Description Checking out the tools they will be using on the STS-92 mission are Mission Specialists Jeff Wisoff (left) and Michael Lopez-Alegria (center), while a Boeing worker looks on. They are in the Orbiter Processing Facility bay 1 where Discovery is being outfitted for the mission. They and other crew members Commander Brian Duffy, Pilot Pam Melroy and Mission Specialists Koichi Wakata, Leroy Chiao and Bill McArthur are taking part in Crew Equipment Interface Test activities. STS-92 is scheduled to launch Oct. 5 on Shuttle Discovery from Launch Pad 39A on the fifth flight to the International Space Station. Discovery will carry the Integrated Truss Structure (ITS) Z1, Pressurized Mating Adapter 3, Ku-band Communications System, and Control Moment Gyros (CMGs)
Release Date 07/12/2000
STS-92 Commander Brian Duffy …
Description STS-92 Commander Brian Duffy climbs into a T-38 jet aircraft at KSC?s Shuttle Landing Facility for a flight back to Houston. He and other crew members were at KSC for Crew Equipment Interface Test (CEIT) activities, looking over their mission payload and related equipment. STS-92 is scheduled to launch Oct. 5 on Shuttle Discovery from Launch Pad 39A on the fifth flight to the International Space Station. Discovery will carry the Integrated Truss Structure (ITS) Z1, the PMA-3, Ku-band Communications System, and Control Moment Gyros (CMGs)
Release Date 07/12/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- On the 195-foot level of the Fixed Service Structure on Launch Pad 39A, STS-92 Pilot Pamela Ann Melroy (left) sits in the slidewire basket while Commander Brian Duffy reaches for the lever to release the basket. They and other crew members are taking part in emergency egress training, one of the Terminal Countdown Demonstration Test activities that also include a simulated countdown. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program
Release Date 09/15/2000
After completing emergency e …
Description After completing emergency egress training at Launch Pad 39A, the STS-92 crew poses for a photo. Standing, left to right, are Pilot Pamela Ann Melroy, Commander Brian Duffy and Mission Specialists Michael Lopez-Alegria, Peter J.K. ?Jeff? Wisoff, Leroy Chiao, William S. McArthur Jr. and Koichi Wakata of Japan. The training is part of Terminal Countdown Demonstration Test activities that also include a simulated countdown. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program
Release Date 09/15/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- On the 195-foot level of the Fixed Service Structure on Launch Pad 39A, STS-92 Pilot Pamela Ann Melroy and Commander Brian Duffy learn more about the emergency egress training they and the rest of the crew have received. The training is part of Terminal Countdown Demonstration Test activities that also include a simulated countdown. STS-92 is scheduled to launch Oct. 5 at 9:38 p.m. EDT on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program
Release Date 09/15/2000
KENNEDY SPACE CENTER, Fla. - …
Description KENNEDY SPACE CENTER, Fla. -- The STS-92 crew gather outside the gate to Launch Pad 39A where Space Shuttle Discovery waits in the background for liftoff Oct. 5 at 9:38 p.m. EDT. From left to right are Commander Brian Duffy, Pilot Pamela Ann Melroy, and Mission Specialists Leroy Chiao, William S. McArthur Jr., Peter J.K. ?Jeff? Wisoff, Michael E. Lopez-Alegria and Koichi Wakata of Japan. The mission payload includes Integrated Truss Structure Z-1, an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power, Ku-band communication to support early science capability and U.S. television, and the third Pressurized Mating Adapter to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The 11-day mission will include four spacewalks
Release Date 10/04/2000
KENNEDY SPACE CENTER, Fla. - …
Description KENNEDY SPACE CENTER, Fla. -- The STS-92 crew gather outside the gate to Launch Pad 39A where the sign on the gate identifies Space Shuttle Discovery in the background. From left to right are Commander Brian Duffy, Pilot Pamela Ann Melroy, and Mission Specialists Leroy Chiao, William S. McArthur Jr., Peter J.K. ?Jeff? Wisoff, Michael E. Lopez-Alegria and Koichi Wakata of Japan. The mission payload includes Integrated Truss Structure Z-1, an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power, Ku-band communication to support early science capability and U.S. television, and the third Pressurized Mating Adapter to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The 11-day mission will include four spacewalks. Liftoff is scheduled for Oct. 5 at 9:38 p.m. EDT
Release Date 10/04/2000
KENNEDY SPACE CENTER, Fla. - …
Description KENNEDY SPACE CENTER, Fla. -- The STS-92 crew happily wave to onlookers as they gather gather outside the gate to Launch Pad 39A where Space Shuttle Discovery waits in the background for liftoff Oct. 5 at 9:38 p.m. EDT. From left to right are Commander Brian Duffy, Pilot Pamela Ann Melroy, and Mission Specialists Leroy Chiao, William S. McArthur Jr., Peter J.K. ?Jeff? Wisoff, Michael E. Lopez-Alegria and Koichi Wakata of Japan. The mission payload includes Integrated Truss Structure Z-1, an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power, Ku-band communication to support early science capability and U.S. television, and the third Pressurized Mating Adapter to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The 11-day mission will include four spacewalks. stallation on the sixth ISS flight and Lab installation on the seventh ISS flight. The 11-day mission will include four spacewalks
Release Date 10/04/2000
Eager to get to the launch p …
Description Eager to get to the launch pad and liftoff of Space Shuttle Discovery on mission STS-92, the crew hurries to the waiting Astrovan for the trip. From left are Mission Specialists Michael E. Lopez-Alegria, Koichi Wakata of Japan, William S. McArthur Jr., Leroy Chiao and Peter J.K. ?Jeff? Wisoff, Pilot Pamela Ann Melroy, and Commander Brian Duffy. This launch is the fourth for Duffy and Wisoff, the third for Chiao and McArthur, second for Wakata and Lopez-Alegria, and first for Melroy. During the 11-day mission to the International Space Station, four extravehicular activities (EVAs), or spacewalks, are planned for construction. The payload includes the Integrated Truss Structure Z-1 and the third Pressurized Mating Adapter. The Z-1 truss is the first of 10 that will become the backbone of the Space Station, eventually stretching the length of a football field. PMA-3 will provide a Shuttle docking port for solar array installation on the sixth Station flight and Lab installation on the seventh Station flight. Launch is scheduled for 7:17 p.m. EDT. Discovery?s landing is expected Oct. 22 at 2:10 p.m. EDT
Release Date 10/11/2000
Smiling and waving at photog …
Description Smiling and waving at photographers and onlookers, the STS-92 crew hurries to the waiting Astrovan for the trip to Launch Pad 39A and liftoff of Space Shuttle Discovery. Clockwise from right, leading the way are Commander Brian Duffy and Pilot Pamela Ann Melroy, then Mission Specialists Leroy Chiao, Koichi Wakata of Japan, Michael Lopez-Alegria, William S. McArthur Jr. and Peter J.K. ?Jeff? Wisoff. During the 11-day mission to the International Space Station, four extravehicular activities (EVAs), or spacewalks, are planned for construction. The payload includes the Integrated Truss Structure Z-1 and the third Pressurized Mating Adapter. The Z-1 truss is the first of 10 that will become the backbone of the Space Station, eventually stretching the length of a football field. PMA-3 will provide a Shuttle docking port for solar array installation on the sixth Station flight and Lab installation on the seventh Station flight. This launch is the fourth for Duffy and Wisoff, the third for Chiao and McArthur, second for Wakata and Lopez-Alegria, and first for Melroy. Launch is scheduled for 7:17 p.m. EDT. Discovery?s landing is expected Oct. 22 at 2:10 p.m. EDT
Release Date 10/11/2000
Three happy astronauts make …
Description Three happy astronauts make their way to the waiting Astrovan that will take the STS-92 crew to Launch Pad 39A for liftoff of Space Shuttle Discovery. From left, they are Mission Specialists Michael Lopez-Alegria and Koichi Wakata, and Commander Brian Duffy. During the 11-day mission to the International Space Station, four extravehicular activities (EVAs), or spacewalks, are planned for construction. The payload includes the Integrated Truss Structure Z-1 and the third Pressurized Mating Adapter. The Z-1 truss is the first of 10 that will become the backbone of the Space Station, eventually stretching the length of a football field. PMA-3 will provide a Shuttle docking port for solar array installation on the sixth Station flight and Lab installation on the seventh Station flight. Launch is scheduled for 7:17 p.m. EDT. Discovery?s landing is expected Oct. 22 at 2:10 p.m. EDT
Release Date 10/11/2000
The STS-92 crew greets cheer …
Description The STS-92 crew greets cheering onlookers as they exit the Operations and Checkout Building for the trip to Launch Pad 39A and liftoff of Space Shuttle Discovery. In rows of two, starting at front, are Pilot Pamela Ann Melroy and Commander Brian Duffy, Mission Specialists Leroy Chiao, Peter J.K. ?Jeff? Wisoff, Koichi Wakata, William S. McArthur Jr., and Michael E. Lopez-Alegria taking up the rear. . This launch is the fourth for Duffy and Wisoff, the third for Chiao and McArthur, second for Wakata and Lopez-Alegria, and first for Melroy. During the 11-day mission to the International Space Station, four extravehicular activities (EVAs), or spacewalks, are planned for construction. The payload includes the Integrated Truss Structure Z-1 and the third Pressurized Mating Adapter. The Z-1 truss is the first of 10 that will become the backbone of the Space Station, eventually stretching the length of a football field. PMA-3 will provide a Shuttle docking port for solar array installation on the sixth Station flight and Lab installation on the seventh Station flight. Launch is scheduled for 7:17 p.m. EDT. Discovery?s landing is expected Oct. 22 at 2:10 p.m. EDT
Release Date 10/11/2000
The STS-92 crew wave to onlo …
Description The STS-92 crew wave to onlookers as they exit the Operations and Checkout Building on their way to Launch Pad 39A for liftoff at 8:05 p.m. EDT to the International Space Station (ISS). They are (from front to back) Pilot Pamela Ann Melroy and Commander Brian Duffy, and Mission Specialists Leroy Chiao and William S. McArthur Jr., Peter J.K. Wisoff, Michael E. Lopez-Alegria and Koichi Wakata of Japan. The mission is the fifth flight for the construction of the ISS. The payload includes the Integrated Truss Structure Z-1 and the third Pressurized Mating Adapter. During the 11-day mission, four extravehicular activities (EVAs), or spacewalks, are planned. The Z-1 truss is the first of 10 that will become the backbone of the International Space Station, eventually stretching the length of a football field. PMA-3 will provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. This launch is the fourth for Duffy and Wisoff, the third for Chiao and McArthur, second for Wakata and Lopez-Alegria, and first for Melroy. Landing is expected Oct. 21 at 3:55 p.m. EDT
Release Date 10/10/2000
The STS-92 crew eagerly walk …
Description The STS-92 crew eagerly walk out of the Operations and Checkout Building for the second time for their trip to Launch Pad 39A. On the left side, from front to back, are Pilot Pamela Ann Melroy and Mission Specialists Leroy Chiao and Koichi Wakata of Japan. On the right side, front to back, are Commander Brian Duffy and Mission Specialists Peter J.K. ?Jeff? Wisoff, William S. McArthur Jr. and Michael E. Lopez-Alegria. During the 11-day mission to the International Space Station, four extravehicular activities (EVAs), or spacewalks, are planned for construction. The payload includes the Integrated Truss Structure Z-1 and the third Pressurized Mating Adapter. The Z-1 truss is the first of 10 that will become the backbone of the Space Station, eventually stretching the length of a football field. PMA-3 will provide a Shuttle docking port for solar array installation on the sixth Station flight and Lab installation on the seventh Station flight. This launch is the fourth for Duffy and Wisoff, the third for Chiao and McArthur, second for Wakata and Lopez-Alegria, and first for Melroy. Launch is scheduled for 7:17 p.m. EDT. Landing is expected Oct. 22 at 2:10 p.m. EDT. [Photo taken with a Nikon D1 camera.
Release Date 10/11/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, members of the STS-92 crew examine equipment that will be part of their mission to the International Space Station (ISS). The fourth U.S. flight to the ISS, the mission payload includes the Integrated Truss Structure Z1, an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power, Ku-band communication to support early science capability and U.S. television, and PMA-3 to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. The crew comprises Mission Commander Brian Duffy, Pilot Pamela Melroy, and Mission Specialists Koichi Wakata, Leroy Chiao, Peter "Jeff" Wisoff, Michael Lopez-Alegria, and William McArthur. Launch of STS-92 is scheduled for Sept. 21, 2000. Wakata is with the National Space Development Agency of Japan
Release Date 04/20/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test (CEIT) activities, STS-92 Mission Specialist Koichi Wakata, who is with the Japanese space agency, and Pilot Pam Melroy check paperwork in the Orbiter Processing Facility bay 1. At right is a Boeing worker. Other crew members taking part in the CEIT are Commander Brian Duffy and Mission Specialists Leroy Chiao, Jeff Wisoff, Michael Lopez-Alegria, and Bill McArthur. STS-92 is scheduled to launch Oct. 5 on Shuttle Discovery from Launch Pad 39A on the fifth flight to the International Space Station. Discovery will carry the Integrated Truss Structure (ITS) Z1, Pressurized Mating Adapter 3 (PMA-3), Ku-band Communications System, and Control Moment Gyros (CMGs)
Release Date 07/12/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Members of the STS-92 crew line up on the runway at KSC?s Shuttle Landing Facility after arriving to take part in a Crew Equipment Interface Test (CEIT). From left are Mission Specialists Jeff Wisoff and Michael Lopez-Alegria, Commander Brian Duffy, Pilot Pam Melroy, and Mission Specialists Koichi Wakata, Bill McArthur and Leroy Chiao. Wakata is with the Japanese space agency. During the CEIT, the crew will spend time at SPACEHAB becoming familiar with the payload and equipment they will use on their mission to the International Space Station. The mission payload includes the Integrated Truss Structure Z1, an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power, Ku-band communication to support early science capability and U.S. television, and PMA-3 to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. STS-92 is scheduled to launch Oct. 5 from launch Pad 39A
Release Date 07/11/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- STS-92 Pilot Pam Melroy arrives at KSC?s Shuttle Landing Facility to take part in a Crew Equipment Interface Test. She and other crew members Commander Brian Duffy and Mission Specialists Koichi Wakata, Leroy Chiao, Jeff Wisoff, Michael Lopez-Alegria and Bill McArthur will spend time at SPACEHAB becoming familiar with the payload and equipment they will use on their mission to the International Space Station. Wakata is with the Japanese space agency. The mission payload includes the Integrated Truss Structure Z1, an early exterior framework to allow the first U.S. solar arrays on a future flight to be temporarily installed on Unity for early power, Ku-band communication to support early science capability and U.S. television, and PMA-3 to provide a Shuttle docking port for solar array installation on the sixth ISS flight and Lab installation on the seventh ISS flight. STS-92 is scheduled to launch Oct. 5 from launch Pad 39A
Release Date 07/11/2000
1 2 3
1-50 of 110