|
|
Browse All
:
Images of Kennedy Space Center (KSC) and Washington, D.C. from 2007
|
Printer Friendly |
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- Mission STS-117 Mission Specialists James Reilly (left) and Danny Olivas sit in the mid-deck of Space Shuttle Atlantis at Launch Pad 39A to participate in a simulated launch countdown that is part of the prelaunch preparations known as terminal countdown demonstration test (TCDT). The TCDT also includes M-113 armored personnel carrier training and payload familiarization. The STS-117 mission is No. 21 to the International Space Station. Mission payloads aboard Atlantis include the S3/S4 integrated truss structure, a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the station. Launch is scheduled for no earlier than March 15. Photo credit: NASA/Kim Shiflett. |
| Release Date |
02/23/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- This logo represents the mission of the Dawn spacecraft. During its nearly decade-long mission, Dawn will study the asteroid Vesta and dwarf planet Ceres, celestial bodies believed to have accreted early in the history of the solar system. The mission hopes to unlock some of the mysteries of planetary formation, including the building blocks and the processes leading to their state today. The Dawn mission is managed by the Jet Propulsion Laboratory, a division of the California Institute of Technology in Pasadena, Calif., for NASA's Science Mission Directorate in Washington, D.C. |
| Release Date |
09/01/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- Tugboats tow the Pegasus barge, with its cargo of external tank No. 125, on the Banana River. Seen in the background are the Atlas V (left) and Titan IV launch complexes. After it is offloaded, the tank will be moved to the Vehicle Assembly Building. The external tank will be used on space shuttle Atlantis for mission STS-122 targeted for launch on Dec. 6. Photo credit: NASA/Troy Cryder |
| Release Date |
09/14/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- Seen from below, external tank No. 125 is being lifted high into the upper levels of the Vehicle Assembly Building for transfer to a checkout cell in high bay 4 to allow for processing. The tank will be part of the space shuttle stack for mission STS-122 targeted to launch Dec. 6. Photo credit: NASA/Troy Cryder |
| Release Date |
09/15/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building, workers keep an eye on the movement of external tank No. 125 as it is lowered into a checkout cell in high bay 4 for processing. The tank will be part of the space shuttle stack for mission STS-122 targeted to launch Dec. 6. Photo credit: NASA/Troy Cryder |
| Release Date |
09/15/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- On its transporter, external tank No. 125 moves toward the Vehicle Assembly Building, at right. The tank arrived at the Launch Complex 39 Area turn basin on the Pegasus barge from the Michoud Assembly Facility near New Orleans. The external tank will be used on space shuttle Atlantis for mission STS-122 targeted for launch on Dec. 6. Photo credit: NASA/Troy Cryder |
| Release Date |
09/14/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- Tugboats maneuver the Pegasus barge toward the dock in the turn basin of the Launch Complex 39 Area. The barge is carrying external tank No. 125. After it is offloaded, the tank will be moved to the Vehicle Assembly Building. The external tank will be used on space shuttle Atlantis for mission STS-122 targeted for launch on Dec. 6. Photo credit: NASA/Troy Cryder |
| Release Date |
09/14/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- In the transfer aisle of the Vehicle Assembly Building, external tank No. 125 is raised off its transporter. The tank will be raised to a vertical position and then lifted into a checkout cell in high bay 4 to allow for processing. The tank will be part of the space shuttle stack for mission STS-122 targeted to launch Dec. 6. Photo credit: NASA/Troy Cryder |
| Release Date |
09/15/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- External tank No. 125 is moved toward a checkout cell in high bay 4 in the Vehicle Assembly Building for processing. The tank will be part of the space shuttle stack for mission STS-122 targeted to launch Dec. 6. Photo credit: NASA/Troy Cryder |
| Release Date |
09/15/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- In its vertical position, external tank No. 125 is being lifted high into the upper levels of the Vehicle Assembly Building for transfer to a checkout cell in high bay 4 to allow for processing. The tank will be part of the space shuttle stack for mission STS-122 targeted to launch Dec. 6. Photo credit: NASA/Troy Cryder |
| Release Date |
09/15/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- In the transfer aisle of the Vehicle Assembly Building, external tank No. 125 is suspended above the floor as it is being raised to a vertical position. It will then be lifted into a checkout cell in high bay 4 to allow for processing. The tank will be part of the space shuttle stack for mission STS-122 targeted to launch Dec. 6. Photo credit: NASA/Troy Cryder |
| Release Date |
09/15/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- On its transporter, external tank No. 125 maneuvers around a corner on its way to the Vehicle Assembly Building. The tank arrived at the Launch Complex 39 Area turn basin on the Pegasus barge from the Michoud Assembly Facility near New Orleans. The external tank will be used on space shuttle Atlantis for mission STS-122 targeted for launch on Dec. 6. Photo credit: NASA/Troy Cryder |
| Release Date |
09/14/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- On its transporter, external tank No. 125 moves toward the entrance in the Vehicle Assembly Building. The tank arrived at the Launch Complex 39 Area turn basin on the Pegasus barge from the Michoud Assembly Facility near New Orleans. The external tank will be used on space shuttle Atlantis for mission STS-122 targeted for launch on Dec. 6. Photo credit: NASA/Troy Cryder |
| Release Date |
09/14/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- On its transporter, external tank No. 125 moves through the entrance in the Vehicle Assembly Building. The tank arrived at the Launch Complex 39 Area turn basin on the Pegasus barge from the Michoud Assembly Facility near New Orleans. The external tank will be used on space shuttle Atlantis for mission STS-122 targeted for launch on Dec. 6. Photo credit: NASA/Troy Cryder |
| Release Date |
09/14/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- Seen from below, external tank No. 125 is moved toward a checkout cell in high bay 4 in the Vehicle Assembly Building for processing. The tank will be part of the space shuttle stack for mission STS-122 targeted to launch Dec. 6. Photo credit: NASA/Troy Cryder |
| Release Date |
09/15/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- Above the transfer aisle of the Vehicle Assembly Building, external tank No. 125 has been raised to a nearly vertical position. It will next be lifted into a checkout cell in high bay 4 to allow for processing. The tank will be part of the space shuttle stack for mission STS-122 targeted to launch Dec. 6. Photo credit: NASA/Troy Cryder |
| Release Date |
09/15/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- External tank No. 125 is moved out of the Pegasus barge at the Launch Complex 39 Area turn basin. After offloading, the tank will be transported to the Vehicle Assembly Building. The tank arrived at Kennedy on the Pegasus barge from the Michoud Assembly Facility near New Orleans. The external tank will be used on space shuttle Atlantis for mission STS-122 targeted for launch on Dec. 6. Photo credit: NASA/Troy Cryder |
| Release Date |
09/14/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- Tugboats tow the Pegasus barge toward the dock in the turn basin of the Launch Complex 39 Area. At left is the Vehicle Assembly Building. The barge is carrying external tank No. 125. After it is offloaded, the tank will be moved to the Vehicle Assembly Building. The external tank will be used on space shuttle Atlantis for mission STS-122 targeted for launch on Dec. 6. Photo credit: NASA/Troy Cryder |
| Release Date |
09/14/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- External tank No. 125 is moved out of the Pegasus barge at the Launch Complex 39 Area turn basin. After offloading, the tank will be transported to the Vehicle Assembly Building. The tank arrived at Kennedy on the Pegasus barge from the Michoud Assembly Facility near New Orleans. The external tank will be used on space shuttle Atlantis for mission STS-122 targeted for launch on Dec. 6. Photo credit: NASA/Troy Cryder |
| Release Date |
09/14/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- On its transporter, external tank No. 125 sits in the transfer aisle inside the Vehicle Assembly Building. The tank arrived at the Launch Complex 39 Area turn basin on the Pegasus barge from the Michoud Assembly Facility near New Orleans. The external tank will be used on space shuttle Atlantis for mission STS-122 targeted for launch on Dec. 6. Photo credit: NASA/Troy Cryder |
| Release Date |
09/14/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- In the transfer aisle of the Vehicle Assembly Building, external tank No. 125 is raised off its transporter. The tank will be raised to a vertical position and then lifted into a checkout cell in high bay 4 to allow for processing. The tank will be part of the space shuttle stack for mission STS-122 targeted to launch Dec. 6. Photo credit: NASA/Troy Cryder |
| Release Date |
09/15/2007 |
|
|