Browse All : Images of Edwards Air Force Base and Florida

Printer Friendly
1 2 3 4 5 6 7 8
1-50 of 351
     
     
Discovery Comes Home
The Boeing 747 Shuttle Carri …
9/22/09
Description The Boeing 747 Shuttle Carrier Aircraft, with space shuttle Discovery on top, is towed from the Shuttle Landing Facility's runway 33 at NASA's Kennedy Space Center in Florida after touching down on Sept. 21 at 12:05 p.m. EDT. The two-day return flight from Edwards Air Force Base in California began at 9:20 a.m. EDT Sept. 20. After three fueling stops that included an overnight stay in Louisiana, the piggybacked shuttle had to navigate through a line of showers across Louisiana and around Kennedy. Discovery had landed at Edwards Sept. 11 after the 13-day STS-128 mission to the International Space Station. Landings at Kennedy were waved off on two days due to inclement weather, leading to the landing at Edwards. Image credit: NASA/Kim Shiflett Sept. 21, 2009
Date 9/22/09
Desert Layover
Space shuttle Discovery is p …
9/22/09
Description Space shuttle Discovery is parked within the Mate-Demate Device gantry at NASA's Dryden Flight Research Cener prior to beginning turnaround processing for its ferry flight back to the Kennedy Space Center in Florida. Discoloration on Discovery's reinforced carbon-carbon nose cap gives evidence of the extreme heating it encountered during re-entry into the Earth' atmosphere prior to landing on Sept. 11, 2009, at Edwards Air Force Base in California. Image Credit: NASA/Tony Landis
Date 9/22/09
The Journey Home
NASA's modified Boeing 747 c …
9/21/09
Description NASA's modified Boeing 747 carrying the space shuttle Discovery taxis toward the runway at Edwards Air Force Base shortly before dawn on Sept. 20, 2009, prior to taking off on their two-day ferry flight to the Kennedy Space Center in Florida. Discovery landed at Edwards on Sept. 11, after a 14-day mission STS-128 to the International Space Station. Image Credit: NASA/Jim Ross
Date 9/21/09
Homecoming
Space shuttle Discovery sits …
9/21/09
Description Space shuttle Discovery sits atop the Boeing 747 Shuttle Carrier Aircraft as it touched down at NASA's Kennedy Space Center in Florida at 12:05 p.m. EDT. The two-day return flight from Edwards Air Force Base in California began at 9:20 a.m. EDT Sept. 20. After three fueling stops that included an overnight stay in Louisiana, the piggybacked shuttle had to navigate through a line of showers across Louisiana and around Kennedy. Image Credit: NASA/Kim Shiflett
Date 9/21/09
Intern Steven Humphrey
Steven Humphrey, a mechanica …
3/20/09
Description Steven Humphrey, a mechanical engineering graduate of the University of South Florida in Tampa, is interning at NASA's Dryden Flight Research Center located on Edwards Air Force Base in California. He operates displays used for an interactive computer software system that gathers, retains and interprets flight data from sensors installed on NASA's Stratospheric Observatory for Infrared Astronomy 747SP aircraft. (NASA photo / Tom Tschida) March 18, 2009 NASA Photo ED09-0061-08
Date 3/20/09
STS-125
ED09-0127-91 NASA 911, a Boe …
6/1/09
Description ED09-0127-91 NASA 911, a Boeing 747 modified to carry the space shuttles, lifts off Runway 22 at Edwards Air Force Base carrying the shuttle Atlantis on its back on the first leg of Atlantis' ferry flight back to the Kennedy Space Center in Florida. June 1, 2009 NASA Photo / Tom Tschida<br >
Date 6/1/09
STS-125
ED09-0127-099 Space Shuttle …
6/1/09
Description ED09-0127-099 Space Shuttle Atlantis is carried by one of NASA's modified 747 Shuttle Carrier Aircraft over California's high desert after leaving NASA's Dryden Flight Research Center at Edwards Air Force Base on a ferry flight back to the Kennedy Space Center in Florida. June 1, 2009 NASA Photo / Jim Ross
Date 6/1/09
STS-125
ED09-0127-101 NASA Dryden ph …
6/1/09
Description ED09-0127-101 NASA Dryden photographer Jim Ross captured this overhead view of Space Shuttle Atlantis atop NASA's modified 747 carrier aircraft over California's high desert from an F/A-18 mission support aircraft after departing Edwards Air Force Base on a ferry flight back to the Kennedy Space Center in Florida. June 1, 2009 NASA Photo / Jim Ross
Date 6/1/09
STS-125
ED09-0127-90 Paced by a NASA …
6/4/09
Description ED09-0127-90 Paced by a NASA F-18, one of NASA's modified Boeing 747 space shuttle carriers, lifts off Runway 22L at Edwards Air Force Base with the shuttle Atlantis on its back on the first leg of Atlantis' ferry flight back to the Kennedy Space Center in Florida. June 1, 2009 NASA Photo / Tom Tschida
Date 6/4/09
STS-125
ED09-0127-92 NASA 911, one o …
6/4/09
Description ED09-0127-92 NASA 911, one of NASA's two modified Boeing 747 space shuttle carriers, lifts off Runway 22L at Edwards Air Force Base with the shuttle Atlantis on its back on the first leg of Atlantis' ferry flight back to the Kennedy Space Center in Florida. June 1, 2009 NASA Photo / Tom Tschida
Date 6/4/09
STS-125
ED09-0127-93 NASA 911, a Boe …
6/4/09
Description ED09-0127-93 NASA 911, a Boeing 747 modified to carry the space shuttles, soars skyward off Runway 22L at Edwards Air Force Base with the shuttle Atlantis on its back on the first leg of Atlantis' ferry flight back to the Kennedy Space Center in Florida. June 1, 2009 NASA Photo / Tom Tschida
Date 6/4/09
STS-125
ED09-0127-94 As media photog …
6/4/09
Description ED09-0127-94 As media photographers record the moment, NASA shuttle carrier aircraft No. 911 lifts the Space Shuttle Atlantis into the morning sky upon departure from Edwards Air Force Base on the first leg of Atlantis' ferry flight back to the Kennedy Space Center in Florida. June 1, 2009 NASA Photo / Tom Tschida
Date 6/4/09
STS-125
ED09-0127-95 NASA space shut …
6/4/09
Description ED09-0127-95 NASA space shuttle carrier aircraft 911 lifts its nose wheel off the pavement during its takeoff roll on Runway 22L at Edwards Air Force Base to ferry the Space Shuttle Atlantis back to NASA's Kennedy Space Center in Florida. June 1, 2009 NASA Photo / Carla Thomas
Date 6/4/09
STS-125
ED09-0127-96 Eight days afte …
6/4/09
Description ED09-0127-96 Eight days after its arrival on the same runway, Space Shuttle Atlantis is hauled aloft by NASA Shuttle Carrier Aircraft 911 off Runway 22L at Edwards Air Force Base on the first leg of its ferry flight back to NASA's Kennedy Space Center in Florida. June 1, 2009 NASA Photo / Carla Thomas
Date 6/4/09
Description Here on the Gallery page you can find the very latest images, videos and products from the Cassini-Huygens mission to Saturn, including the spectacular launch, spacecraft assembly and the exciting trip to Saturn.
Full Description Built at JPL, the Cassini Spacecraft was shipped by truck to Edwards Air Force Base in the Mohave Desert, where it was loaded into a Boeing C-17 aircraft to be transported for launch at Kennedy Space Center in Florida. (Boeing Photo)
Sally Ride, First U.S. Woman …
Title Sally Ride, First U.S. Woman in Space
Full Description Sally Ride was the first American woman in space. Born on May 26, 1951 in Los Angeles, California, she received a Bachelor in Physics and English in 1973 from Stanford University and, later, a Master in Physics in 1975 and a Doctorate in Physics in 1978, also from Stanford. NASA selected Dr. Ride as an astronaut candidate in January 1978. She completed her training in August 1979, and began her astronaut career as a mission specialist on STS-7, which launched from Kennedy Space Center, Florida on June 18, 1983. The mission spent 147 hours in space before landing on a lakebed runway at Edwards Air Force Base, California on June 24, 1983. Dr. Ride also served as a mission specialist on STS-41-G, which launched from Kennedy Space Center, Florida on October 5, 1984 and landed 197 hours later at Kennedy Space Center, Florida on October 13, 1984. In June 1985, NASA assigned Dr. Ride to serve as mission specialist on STS-61-M. She discontinued mission training in January 1986 to serve as a member of the Presidential Commission on the Space Shuttle Challenger accident, also known as the Rogers Commission. Upon completing the investigation she returned to NASA Headquarters as Special Assistant to the Administrator for Long Range and Strategic Planning, where she lead a team that wrote NASA Leadership and America's Future in Space:A Report to the Administrator in August 1987. Dr. Ride has also written a children's book, To Space and Back, describing her experiences in space, has received the Jefferson Award for Public Service, and has twice been awarded the National Spaceflight Medal. Her latest books include Voyager: An Adventure to the Edge of the Solar System and The Third Planet: Exploring the Earth from Space. She was also a member of the Columbia Accident Investigation Board (CAIB), which investigated the February 1, 2003 loss of Space Shuttle Columbia. Dr. Ride is currently a physics professor and Director of the California Space Institute at the University of California, San Diego.
Date 06/1984
NASA Center Johnson Space Center
NASA space shuttle Columbia …
Photo Date March 1, 2001
NASA space shuttle Columbia …
Photo Date March 1, 2001
NASA space shuttle Columbia …
Photo Date March 1, 2001
Photo Description The Space Shuttle Discovery receives post-flight servicing in the Mate-Demate Device (MDD), following its landing at NASA's Dryden Flight Research Center, Edwards, California, August 9, 2005. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA?s modified Boeing 747 Shuttle Carrier Aircraft. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT this morning, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
Project Description unknown
Photo Date August 11, 2005
Photo Description The Space Shuttle Discovery receives post-flight servicing in the Mate-Demate Device (MDD), following its landing at NASA's Dryden Flight Research Center, Edwards, California, August 9, 2005. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA?s modified Boeing 747 Shuttle Carrier Aircraft. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
Project Description unknown
Photo Date August 11, 2005
Photo Description Lightning strikes in the distance as the Space Shuttle Discovery receives post-flight processing in the Mate-Demate Device (MDD), following its landing at NASA's Dryden Flight Research Center in California. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA?s modified Boeing 747 Shuttle Carrier Aircraft. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
Photo Date August 14, 2005
Photo Description A technician leaves the 'white room', the access point for entering the Space Shuttle Discovery during post-flight processing in the Mate-Demate Device (MDD) at NASA's Dryden Flight Research Center in California. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA?s modified Boeing 747 Shuttle Carrier Aircraft. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
Photo Date August 14, 2005
Photo Description Todd Viddle, APU advanced systems technician, Robert 'Skip' Garrett, main propulsion advanced systems technician, and Dan McGrath, main propulsion systems engineer technician, remove a servicing unit from the Space Shuttle Discovery as part of it's post-flight processing at NASA's Dryden Flight Research Center. The Space Shuttles receive post-flight servicing in the Mate-Demate Device (MDD) following landings at NASA's Dryden Flight Research Center, Edwards, California. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA?s modified Boeing 747 Shuttle Carrier Aircraft. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
Photo Date August 12, 2005
Photo Description The sun sets on the Space Shuttle Discovery during post-flight processing in the Mate-Demate Device (MDD), following its landing at NASA's Dryden Flight Research Center in California. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA?s modified Boeing 747 Shuttle Carrier Aircraft. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
Photo Date August 14, 2005
Photo Description Flight Crew Systems Technicians Ray Smith and Raphael Rodriguez remove one of the Extravehicular Mobility Units, or EMUs, from the Space Shuttle Discovery after it's successful landing at NASA's Dryden Flight Research Center. The Space Shuttles receive post-flight servicing in the Mate-Demate Device (MDD) following landings at NASA's Dryden Flight Research Center, Edwards, California. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA?s modified Boeing 747 Shuttle Carrier Aircraft. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
Photo Date August 12, 2005
Photo Description Robert 'Skip' Garrett, main propulsion advanced systems technician, and Chris Jacobs, main propulsion systems engineering technician, inspect external tank attachment fittings on the Space Shuttle Discovery as part of it's post-flight processing at NASA's Dryden Flight Research Center. The Space Shuttles receive post-flight servicing in the Mate-Demate Device (MDD) following landings at NASA's Dryden Flight Research Center, Edwards, California. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA?s modified Boeing 747 Shuttle Carrier Aircraft. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
Photo Date August 12, 2005
Photo Description The sun sets on the Space Shuttle Discovery during post-flight processing in the Mate-Demate Device (MDD), following its landing at NASA's Dryden Flight Research Center in California. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA?s modified Boeing 747 Shuttle Carrier Aircraft. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
Photo Date August 14, 2005
Photo Description The sun sets on the Space Shuttle Discovery during post-flight processing in the Mate-Demate Device (MDD), following its landing at NASA's Dryden Flight Research Center in California. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA?s modified Boeing 747 Shuttle Carrier Aircraft. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
Photo Date August 14, 2005
Photo Description Technicians attach the tail cone, which helps reduce aerodynamic drag and turbulence during its ferry flight, to the Space Shuttle Discovery in preparation for its return to NASA's Kennedy Space Center in Florida. After the tail-cone is installed, Discovery will be mounted on NASA?s modified Boeing 747 Shuttle Carrier Aircraft, or SCA, for the return flight. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
Photo Date August 16, 2005
Photo Description Workers position the tail cone on the Space Shuttle Discovery in preparation for its return to NASA's Kennedy Space Center in Florida. After the tail-cone is installed, Discovery will be mounted on NASA?s modified Boeing 747 Shuttle Carrier Aircraft, or SCA, for the return flight. The tail cone is a fitting that helps reduce aerodynamic drag and turbulence during its ferry flight. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
Photo Date August 15, 2005
Photo Description Closing the landing gear doors is one of the final servicing steps before lifting of the Space Shuttle Discovery and mating it to NASA's 747 can begin. After being raised in the gantry-like Mate-Demate Device (MDD), Discovery will be mounted on NASA?s modified Boeing 747 Shuttle Carrier Aircraft, or SCA, for the return flight to the Kennedy Space Center in Florida. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
Photo Date August 17, 2005
Photo Description NASA's specially modified 747 Shuttle Carrier Aircraft, or SCA, is positioned under the Space Shuttle Discovery to be attached for their ferry flight to the Kennedy Space Center in Florida. After its post-flight servicing and preparation at NASA Dryden in California, Discovery's return flight to Kennedy aboard the 747 will take approximately 2 days, with stops at several intermediate points for refueling. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
Photo Date August 18, 2005
Photo Description NASA's specially modified 747 Shuttle Carrier Aircraft, or SCA, is positioned under the Space Shuttle Discovery to be attached for their ferry flight to the Kennedy Space Center in Florida. After its post-flight servicing and preparation at NASA Dryden in California, Discovery's return flight to Kennedy aboard the 747 will take approximately 2 days, with stops at several intermediate points for refueling. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
Photo Date August 18, 2005
Photo Description The Space Shuttle Discovery hitched a ride on NASA's modified Boeing 747 Shuttle Carrier Aircraft for the flight from the Dryden Flight Research Center in California, to Kennedy Space Center, Florida, on August 19, 2005. The cross-country ferry flight to return Discovery to Florida after it's landing in California will take two days, with stops at several intermediate points for refueling. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
Project Description STS-114
Photo Date August 19, 2005
Photo Description NASA's modified Boeing 747 Shuttle Carrier Aircraft with the Space Shuttle Discovery on top lifts off from Edwards Air Force Base to begin its ferry flight back to the Kennedy Space Center in Florida. The cross-country journey will take two days, with stops at several intermediate points for refueling. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
Project Description STS-114
Photo Date August 19, 2005
Photo Description NASA's modified Boeing 747 Shuttle Carrier Aircraft with the Space Shuttle Discovery on top lifts off from Edwards Air Force Base to begin its ferry flight back to the Kennedy Space Center in Florida. The cross-country journey will take two days, with stops at several intermediate points for refueling. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
Project Description STS-114
Photo Date August 19, 2005
Photo Description NASA's modified Boeing 747 Shuttle Carrier Aircraft with the Space Shuttle Discovery on top lifts off from Edwards Air Force Base to begin its ferry flight back to the Kennedy Space Center in Florida. The cross-country journey will take two days, with stops at several intermediate points for refueling. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
Project Description STS-114
Photo Date August 19, 2005
Photo Description The space shuttle Discovery atop NASA's modified 747 is captured over the Mojave Desert while being ferried from NASA Dryden to the Kennedy Space Center. NASA's modified Boeing 747 Shuttle Carrier Aircraft with the Space Shuttle Discovery on top lifts off from Edwards Air Force Base to begin its ferry flight back to the Kennedy Space Center in Florida. The cross-country journey will take two days, with stops at several intermediate points for refueling. Space shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
Photo Date August 19, 2005
Photo Description Brig. Gen. Curtis Bedke, commander of the Air Force Flight Test Center at Edwards Air Force Base, received some first-hand insight on how to fly a Space Shuttle approach and landing, courtesy of NASA astronaut and STS-114 mission commander Eileen Collins. The series of proficiency flights in NASA's modified Grumman Gulfstream-II Shuttle Training Aircraft were in preparation for the STS-114 mission with the shuttle Discovery. Although NASA's Kennedy Space Center in Florida is the primary landing site for Space Shuttle missions, flight crews also practice the shuttle's steep approach and landing at Edwards in case weather or other situations preclude a landing at the Florida site and force a diversion to Edwards AFB.
Project Description visitors, guests, VIPs
Photo Date March 29, 2005
NASA's 747 with Columbia ato …
Photo Description NASA's specially modified 747 with the Space Shuttle Columbia atop takes off to ferry the Shuttle back to Kennedy Space Center in Florida. Columbia had recently completed its first orbital mission with a landing at Edwards Air Force Base in California.
Photo Date April 28, 1981
Photo Description After completing it's first orbital mission with a landing at Edwards Air Force Base on April 14, 1981, Space Shuttle Columbia received a humorous sendoff before it's ferry flight atop a modified 747 back to the Kennedy Space Center in Florida. Holding the sign are, left to right: Melvin Burke, DFRC Orbital Flight Test (OFT) Program Manager, Isaac 'Ike' Gillam, DFRC Center Director, Fitzhugh 'Fitz' L. Fulton Jr., NASA DFRC 747 SCA Pilot, and Donald K. 'Deke' Slayton, JSC OFT Project Manager.
Photo Date April 28, 1981
Photo Description Following initial captive flight tests last year at NASA's Dryden Flight Research Center, Edwards Air Force Base, California, the X-34 technology demonstrator began a new series of tests last week in which it is being towed behind a semi-truck and released to coast on the Edwards dry lakebed. On July 20, 2000, it was towed and released twice at speeds of five and 10 miles per hour. On July 24, 2000, it was towed and released twice at 10 and 30 miles per hour. Twelve tests are planned during which the X-34 will be towed for distances up to 10,000 feet and released at speeds up to 80 miles per hour. The test series is expected to last at least six weeks.
Project Description The unpiloted X-34 is a technology testbed demonstrator that is designed to demonstrate key vehicle and operational technologies applicable to future low-cost reusable launch vehicles. The vehicle structure is all-composite with a one-piece delta wing design. The vehicle is 58.3 feet long and has a 27.7-foot wingspan. The suborbital vehicle was designed and built by Orbital Sciences Corporation, Dulles, Virginia, and is powered by an oxygen and kerosene Fastrac engine that was designed and built by NASA?s Marshall Space Flight Center (MSFC), Huntsville, Alabama. Fastrac is only the second American-made engine of the 29 engines developed in the last 25 years. The vehicle is designed to reach speeds of up to Mach 8 and altitudes of up to approximately 250,000 feet. Specific technologies built into the vehicle include composite structures, composite reusable propellant fuel tanks, an advanced thermal protection system, low-cost avionics, leading-edge tiles, and autonomous flight operation systems. The project?s goal is to reduce the cost of launching payloads into orbit from $10,000 per pound today to one of $1,000 per pound, thereby improving U.S. economic competitiveness. NASA and Orbital, using a small workforce, plan to demonstrate the ability to fly the X-34 every two weeks. The X-34 was expected in early 2000 to undergo testing in New Mexico, California, and Florida. The first of three X-34 vehicles, a structural test vehicle designated A-1, began captive-carry flights at Edwards Air Force Base, California, in June 1999. Technicians from Dryden Flight Research Center, Edwards, California, have assisted in upgrading the A-1 vehicle with structural modifications and integrating avionics, hydraulics, landing gear, and other hardware needed to turn it into a flight vehicle--now known as A-1A--for unpowered glide tests in New Mexico. Following a series of tow tests on the ground at Dryden, the X-34 A-1A will be used to conduct unpowered test flights at the U.S. Army?s White Sands Missile Range, New Mexico, according to plans current in early 2000. This test series was expected to use Orbital?s L-1011 carrier aircraft to air-launch the X-34. Powered flights, using the second and third vehicle (designated A-2 and A-3 respectively), are scheduled to be conducted at the Dryden Flight Research Center, California, and the Kennedy Space Center, Florida. The X-34 vehicle A-3 was expected in early 2000 to be brought to Dryden for envelope expansion to the maximum capability of an approximate speed of Mach 8 and altitude of 250,000 feet. Plans called for A-3 to explore additional reusable launch vehicle technologies as carry-on experiments. Dryden?s project manger was Seunghee Lee as of early 2000.
Photo Date July 20, 2000
Photo Description Following initial captive flight tests last year at NASA's Dryden Flight Research Center, Edwards Air Force Base, California, the X-34 technology demonstrator began a new series of tests last week in which it is being towed behind a semi-truck and released to coast on the Edwards dry lakebed. On July 20, 2000, it was towed and released twice at speeds of five and 10 miles per hour. On July 24, 2000, it was towed and released twice at 10 and 30 miles per hour. Twelve tests are planned during which the X-34 will be towed for distances up to 10,000 feet and released at speeds up to 80 miles per hour. The test series is expected to last at least six weeks.
Project Description The unpiloted X-34 is a technology testbed demonstrator that is designed to demonstrate key vehicle and operational technologies applicable to future low-cost reusable launch vehicles. The vehicle structure is all-composite with a one-piece delta wing design. The vehicle is 58.3 feet long and has a 27.7-foot wingspan. The suborbital vehicle was designed and built by Orbital Sciences Corporation, Dulles, Virginia, and is powered by an oxygen and kerosene Fastrac engine that was designed and built by NASA?s Marshall Space Flight Center (MSFC), Huntsville, Alabama. Fastrac is only the second American-made engine of the 29 engines developed in the last 25 years. The vehicle is designed to reach speeds of up to Mach 8 and altitudes of up to approximately 250,000 feet. Specific technologies built into the vehicle include composite structures, composite reusable propellant fuel tanks, an advanced thermal protection system, low-cost avionics, leading-edge tiles, and autonomous flight operation systems. The project?s goal is to reduce the cost of launching payloads into orbit from $10,000 per pound today to one of $1,000 per pound, thereby improving U.S. economic competitiveness. NASA and Orbital, using a small workforce, plan to demonstrate the ability to fly the X-34 every two weeks. The X-34 was expected in early 2000 to undergo testing in New Mexico, California, and Florida. The first of three X-34 vehicles, a structural test vehicle designated A-1, began captive-carry flights at Edwards Air Force Base, California, in June 1999. Technicians from Dryden Flight Research Center, Edwards, California, have assisted in upgrading the A-1 vehicle with structural modifications and integrating avionics, hydraulics, landing gear, and other hardware needed to turn it into a flight vehicle--now known as A-1A--for unpowered glide tests in New Mexico. Following a series of tow tests on the ground at Dryden, the X-34 A-1A will be used to conduct unpowered test flights at the U.S. Army?s White Sands Missile Range, New Mexico, according to plans current in early 2000. This test series was expected to use Orbital?s L-1011 carrier aircraft to air-launch the X-34. Powered flights, using the second and third vehicle (designated A-2 and A-3 respectively), are scheduled to be conducted at the Dryden Flight Research Center, California, and the Kennedy Space Center, Florida. The X-34 vehicle A-3 was expected in early 2000 to be brought to Dryden for envelope expansion to the maximum capability of an approximate speed of Mach 8 and altitude of 250,000 feet. Plans called for A-3 to explore additional reusable launch vehicle technologies as carry-on experiments. Dryden?s project manger was Seunghee Lee as of early 2000.
Photo Date July 20, 2000
Photo Description Following initial captive flight tests last year at NASA's Dryden Flight Research Center, Edwards Air Force Base, California, the X-34 technology demonstrator began a new series of tests last week in which it is being towed behind a semi-truck and released to coast on the Edwards dry lakebed. On July 20, 2000, it was towed and released twice at speeds of five and 10 miles per hour. On July 24, 2000, it was towed and released twice at 10 and 30 miles per hour. Twelve tests are planned during which the X-34 will be towed for distances up to 10,000 feet and released at speeds up to 80 miles per hour. The test series is expected to last at least six weeks.
Project Description The unpiloted X-34 is a technology testbed demonstrator that is designed to demonstrate key vehicle and operational technologies applicable to future low-cost reusable launch vehicles. The vehicle structure is all-composite with a one-piece delta wing design. The vehicle is 58.3 feet long and has a 27.7-foot wingspan. The suborbital vehicle was designed and built by Orbital Sciences Corporation, Dulles, Virginia, and is powered by an oxygen and kerosene Fastrac engine that was designed and built by NASA?s Marshall Space Flight Center (MSFC), Huntsville, Alabama. Fastrac is only the second American-made engine of the 29 engines developed in the last 25 years. The vehicle is designed to reach speeds of up to Mach 8 and altitudes of up to approximately 250,000 feet. Specific technologies built into the vehicle include composite structures, composite reusable propellant fuel tanks, an advanced thermal protection system, low-cost avionics, leading-edge tiles, and autonomous flight operation systems. The project?s goal is to reduce the cost of launching payloads into orbit from $10,000 per pound today to one of $1,000 per pound, thereby improving U.S. economic competitiveness. NASA and Orbital, using a small workforce, plan to demonstrate the ability to fly the X-34 every two weeks. The X-34 was expected in early 2000 to undergo testing in New Mexico, California, and Florida. The first of three X-34 vehicles, a structural test vehicle designated A-1, began captive-carry flights at Edwards Air Force Base, California, in June 1999. Technicians from Dryden Flight Research Center, Edwards, California, have assisted in upgrading the A-1 vehicle with structural modifications and integrating avionics, hydraulics, landing gear, and other hardware needed to turn it into a flight vehicle--now known as A-1A--for unpowered glide tests in New Mexico. Following a series of tow tests on the ground at Dryden, the X-34 A-1A will be used to conduct unpowered test flights at the U.S. Army?s White Sands Missile Range, New Mexico, according to plans current in early 2000. This test series was expected to use Orbital?s L-1011 carrier aircraft to air-launch the X-34. Powered flights, using the second and third vehicle (designated A-2 and A-3 respectively), are scheduled to be conducted at the Dryden Flight Research Center, California, and the Kennedy Space Center, Florida. The X-34 vehicle A-3 was expected in early 2000 to be brought to Dryden for envelope expansion to the maximum capability of an approximate speed of Mach 8 and altitude of 250,000 feet. Plans called for A-3 to explore additional reusable launch vehicle technologies as carry-on experiments. Dryden?s project manger was Seunghee Lee as of early 2000.
Photo Date July 20, 2000
Photo Description Following initial captive flight tests last year at NASA's Dryden Flight Research Center, Edwards Air Force Base, California, the X-34 technology demonstrator began a new series of tests last week in which it is being towed behind a semi-truck and released to coast on the Edwards dry lakebed. On July 20, 2000, it was towed and released twice at speeds of five and 10 miles per hour. On July 24, 2000, it was towed and released twice at 10 and 30 miles per hour. Twelve tests are planned during which the X-34 will be towed for distances up to 10,000 feet and released at speeds up to 80 miles per hour. The test series is expected to last at least six weeks.
Project Description The unpiloted X-34 is a technology testbed demonstrator that is designed to demonstrate key vehicle and operational technologies applicable to future low-cost reusable launch vehicles. The vehicle structure is all-composite with a one-piece delta wing design. The vehicle is 58.3 feet long and has a 27.7-foot wingspan. The suborbital vehicle was designed and built by Orbital Sciences Corporation, Dulles, Virginia, and is powered by an oxygen and kerosene Fastrac engine that was designed and built by NASA?s Marshall Space Flight Center (MSFC), Huntsville, Alabama. Fastrac is only the second American-made engine of the 29 engines developed in the last 25 years. The vehicle is designed to reach speeds of up to Mach 8 and altitudes of up to approximately 250,000 feet. Specific technologies built into the vehicle include composite structures, composite reusable propellant fuel tanks, an advanced thermal protection system, low-cost avionics, leading-edge tiles, and autonomous flight operation systems. The project?s goal is to reduce the cost of launching payloads into orbit from $10,000 per pound today to one of $1,000 per pound, thereby improving U.S. economic competitiveness. NASA and Orbital, using a small workforce, plan to demonstrate the ability to fly the X-34 every two weeks. The X-34 was expected in early 2000 to undergo testing in New Mexico, California, and Florida. The first of three X-34 vehicles, a structural test vehicle designated A-1, began captive-carry flights at Edwards Air Force Base, California, in June 1999. Technicians from Dryden Flight Research Center, Edwards, California, have assisted in upgrading the A-1 vehicle with structural modifications and integrating avionics, hydraulics, landing gear, and other hardware needed to turn it into a flight vehicle--now known as A-1A--for unpowered glide tests in New Mexico. Following a series of tow tests on the ground at Dryden, the X-34 A-1A will be used to conduct unpowered test flights at the U.S. Army?s White Sands Missile Range, New Mexico, according to plans current in early 2000. This test series was expected to use Orbital?s L-1011 carrier aircraft to air-launch the X-34. Powered flights, using the second and third vehicle (designated A-2 and A-3 respectively), are scheduled to be conducted at the Dryden Flight Research Center, California, and the Kennedy Space Center, Florida. The X-34 vehicle A-3 was expected in early 2000 to be brought to Dryden for envelope expansion to the maximum capability of an approximate speed of Mach 8 and altitude of 250,000 feet. Plans called for A-3 to explore additional reusable launch vehicle technologies as carry-on experiments. Dryden?s project manger was Seunghee Lee as of early 2000.
Photo Date July 20, 2000
Photo Description unknown
Project Description The unpiloted X-34 is a technology testbed demonstrator that is designed to demonstrate key vehicle and operational technologies applicable to future low-cost reusable launch vehicles. The vehicle structure is all-composite with a one-piece delta wing design. The vehicle is 58.3 feet long and has a 27.7-foot wingspan. The suborbital vehicle was designed and built by Orbital Sciences Corporation, Dulles, Virginia, and is powered by an oxygen and kerosene Fastrac engine that was designed and built by NASA?s Marshall Space Flight Center (MSFC), Huntsville, Alabama. Fastrac is only the second American-made engine of the 29 engines developed in the last 25 years. The vehicle is designed to reach speeds of up to Mach 8 and altitudes of up to approximately 250,000 feet. Specific technologies built into the vehicle include composite structures, composite reusable propellant fuel tanks, an advanced thermal protection system, low-cost avionics, leading-edge tiles, and autonomous flight operation systems. The project?s goal is to reduce the cost of launching payloads into orbit from $10,000 per pound today to one of $1,000 per pound, thereby improving U.S. economic competitiveness. NASA and Orbital, using a small workforce, plan to demonstrate the ability to fly the X-34 every two weeks. The X-34 was expected in early 2000 to undergo testing in New Mexico, California, and Florida. The first of three X-34 vehicles, a structural test vehicle designated A-1, began captive-carry flights at Edwards Air Force Base, California, in June 1999. Technicians from Dryden Flight Research Center, Edwards, California, have assisted in upgrading the A-1 vehicle with structural modifications and integrating avionics, hydraulics, landing gear, and other hardware needed to turn it into a flight vehicle--now known as A-1A--for unpowered glide tests in New Mexico. Following a series of tow tests on the ground at Dryden, the X-34 A-1A will be used to conduct unpowered test flights at the U.S. Army?s White Sands Missile Range, New Mexico, according to plans current in early 2000. This test series was expected to use Orbital?s L-1011 carrier aircraft to air-launch the X-34. Powered flights, using the second and third vehicle (designated A-2 and A-3 respectively), are scheduled to be conducted at the Dryden Flight Research Center, California, and the Kennedy Space Center, Florida. The X-34 vehicle A-3 was expected in early 2000 to be brought to Dryden for envelope expansion to the maximum capability of an approximate speed of Mach 8 and altitude of 250,000 feet. Plans called for A-3 to explore additional reusable launch vehicle technologies as carry-on experiments. Dryden?s project manger was Seunghee Lee as of early 2000.
Photo Date 30 Apr 1999
Photo Description unknown
Project Description The unpiloted X-34 is a technology testbed demonstrator that is designed to demonstrate key vehicle and operational technologies applicable to future low-cost reusable launch vehicles. The vehicle structure is all-composite with a one-piece delta wing design. The vehicle is 58.3 feet long and has a 27.7-foot wingspan. The suborbital vehicle was designed and built by Orbital Sciences Corporation, Dulles, Virginia, and is powered by an oxygen and kerosene Fastrac engine that was designed and built by NASA?s Marshall Space Flight Center (MSFC), Huntsville, Alabama. Fastrac is only the second American-made engine of the 29 engines developed in the last 25 years. The vehicle is designed to reach speeds of up to Mach 8 and altitudes of up to approximately 250,000 feet. Specific technologies built into the vehicle include composite structures, composite reusable propellant fuel tanks, an advanced thermal protection system, low-cost avionics, leading-edge tiles, and autonomous flight operation systems. The project?s goal is to reduce the cost of launching payloads into orbit from $10,000 per pound today to one of $1,000 per pound, thereby improving U.S. economic competitiveness. NASA and Orbital, using a small workforce, plan to demonstrate the ability to fly the X-34 every two weeks. The X-34 was expected in early 2000 to undergo testing in New Mexico, California, and Florida. The first of three X-34 vehicles, a structural test vehicle designated A-1, began captive-carry flights at Edwards Air Force Base, California, in June 1999. Technicians from Dryden Flight Research Center, Edwards, California, have assisted in upgrading the A-1 vehicle with structural modifications and integrating avionics, hydraulics, landing gear, and other hardware needed to turn it into a flight vehicle--now known as A-1A--for unpowered glide tests in New Mexico. Following a series of tow tests on the ground at Dryden, the X-34 A-1A will be used to conduct unpowered test flights at the U.S. Army?s White Sands Missile Range, New Mexico, according to plans current in early 2000. This test series was expected to use Orbital?s L-1011 carrier aircraft to air-launch the X-34. Powered flights, using the second and third vehicle (designated A-2 and A-3 respectively), are scheduled to be conducted at the Dryden Flight Research Center, California, and the Kennedy Space Center, Florida. The X-34 vehicle A-3 was expected in early 2000 to be brought to Dryden for envelope expansion to the maximum capability of an approximate speed of Mach 8 and altitude of 250,000 feet. Plans called for A-3 to explore additional reusable launch vehicle technologies as carry-on experiments. Dryden?s project manger was Seunghee Lee as of early 2000.
Photo Date 30 Apr 1999
Photo Description This is the X-34 Technology Testbed Demonstrator being delivered to NASA Dryden FRC. The X-34 will demonstrate key vehicle and operational technologies applicable to future low-cost resuable launch vehicles.
Project Description The unpiloted X-34 is a technology testbed demonstrator that is designed to demonstrate key vehicle and operational technologies applicable to future low-cost reusable launch vehicles. The vehicle structure is all-composite with a one-piece delta wing design. The vehicle is 58.3 feet long and has a 27.7-foot wingspan. The suborbital vehicle was designed and built by Orbital Sciences Corporation, Dulles, Virginia, and is powered by an oxygen and kerosene Fastrac engine that was designed and built by NASA?s Marshall Space Flight Center (MSFC), Huntsville, Alabama. Fastrac is only the second American-made engine of the 29 engines developed in the last 25 years. The vehicle is designed to reach speeds of up to Mach 8 and altitudes of up to approximately 250,000 feet. Specific technologies built into the vehicle include composite structures, composite reusable propellant fuel tanks, an advanced thermal protection system, low-cost avionics, leading-edge tiles, and autonomous flight operation systems. The project?s goal is to reduce the cost of launching payloads into orbit from $10,000 per pound today to one of $1,000 per pound, thereby improving U.S. economic competitiveness. NASA and Orbital, using a small workforce, plan to demonstrate the ability to fly the X-34 every two weeks. The X-34 was expected in early 2000 to undergo testing in New Mexico, California, and Florida. The first of three X-34 vehicles, a structural test vehicle designated A-1, began captive-carry flights at Edwards Air Force Base, California, in June 1999. Technicians from Dryden Flight Research Center, Edwards, California, have assisted in upgrading the A-1 vehicle with structural modifications and integrating avionics, hydraulics, landing gear, and other hardware needed to turn it into a flight vehicle--now known as A-1A--for unpowered glide tests in New Mexico. Following a series of tow tests on the ground at Dryden, the X-34 A-1A will be used to conduct unpowered test flights at the U.S. Army?s White Sands Missile Range, New Mexico, according to plans current in early 2000. This test series was expected to use Orbital?s L-1011 carrier aircraft to air-launch the X-34. Powered flights, using the second and third vehicle (designated A-2 and A-3 respectively), are scheduled to be conducted at the Dryden Flight Research Center, California, and the Kennedy Space Center, Florida. The X-34 vehicle A-3 was expected in early 2000 to be brought to Dryden for envelope expansion to the maximum capability of an approximate speed of Mach 8 and altitude of 250,000 feet. Plans called for A-3 to explore additional reusable launch vehicle technologies as carry-on experiments. Dryden?s project manger was Seunghee Lee as of early 2000.
Photo Date 16 Apr 1999
Photo Description This is the X-34 Technology Testbed Demonstrator being mated with the L-1011 mothership. The X-34 will demonstrate key vehicle and operational technologies applicable to future low-cost resuable launch vehicles.
Project Description The unpiloted X-34 is a technology testbed demonstrator that is designed to demonstrate key vehicle and operational technologies applicable to future low-cost reusable launch vehicles. The vehicle structure is all-composite with a one-piece delta wing design. The vehicle is 58.3 feet long and has a 27.7-foot wingspan. The suborbital vehicle was designed and built by Orbital Sciences Corporation, Dulles, Virginia, and is powered by an oxygen and kerosene Fastrac engine that was designed and built by NASA?s Marshall Space Flight Center (MSFC), Huntsville, Alabama. Fastrac is only the second American-made engine of the 29 engines developed in the last 25 years. The vehicle is designed to reach speeds of up to Mach 8 and altitudes of up to approximately 250,000 feet. Specific technologies built into the vehicle include composite structures, composite reusable propellant fuel tanks, an advanced thermal protection system, low-cost avionics, leading-edge tiles, and autonomous flight operation systems. The project?s goal is to reduce the cost of launching payloads into orbit from $10,000 per pound today to one of $1,000 per pound, thereby improving U.S. economic competitiveness. NASA and Orbital, using a small workforce, plan to demonstrate the ability to fly the X-34 every two weeks. The X-34 was expected in early 2000 to undergo testing in New Mexico, California, and Florida. The first of three X-34 vehicles, a structural test vehicle designated A-1, began captive-carry flights at Edwards Air Force Base, California, in June 1999. Technicians from Dryden Flight Research Center, Edwards, California, have assisted in upgrading the A-1 vehicle with structural modifications and integrating avionics, hydraulics, landing gear, and other hardware needed to turn it into a flight vehicle--now known as A-1A--for unpowered glide tests in New Mexico. Following a series of tow tests on the ground at Dryden, the X-34 A-1A will be used to conduct unpowered test flights at the U.S. Army?s White Sands Missile Range, New Mexico, according to plans current in early 2000. This test series was expected to use Orbital?s L-1011 carrier aircraft to air-launch the X-34. Powered flights, using the second and third vehicle (designated A-2 and A-3 respectively), are scheduled to be conducted at the Dryden Flight Research Center, California, and the Kennedy Space Center, Florida. The X-34 vehicle A-3 was expected in early 2000 to be brought to Dryden for envelope expansion to the maximum capability of an approximate speed of Mach 8 and altitude of 250,000 feet. Plans called for A-3 to explore additional reusable launch vehicle technologies as carry-on experiments. Dryden?s project manger was Seunghee Lee as of early 2000.
Photo Date March 11, 1999
1 2 3 4 5 6 7 8
1-50 of 351