|
|
Artist's Concept of TDRS-C
| Name of Image |
Artist's Concept of TDRS-C |
| Date of Image |
1988-01-01 |
| Full Description |
This artist's concept drawing depicts the Tracking and Data Relay Satellite-C (TDRS-C), which was the primary payload of the Space Shuttle Discovery on the STS-26 mission, launched on September 29, 1988. The TDRS system provides almost uninterrupted communications with Earth-orbiting Shuttles and satellites, and had replaced the intermittent coverage provided by globe-encircling ground tracking stations used during the early space program. The TDRS can transmit and receive data, and track a user spacecraft in a low Earth orbit. The deployment of TDRS-G on the STS-70 mission being the latest in the series, NASA has successfully launched six TDRSs. |
|
STS-70 Launch - Nikon E-2 Di
| Title |
STS-70 Launch - Nikon E-2 Digital Image |
| Description |
This test images was taken with a Nikon E-2 Digital Imaging System camera and are provided courtesy of Nikon (GIF 450x450 JPEG 1280x1000): The second Shuttle launch in 16 days hurtles off the pad into a sweltering summer sky. The unstable weather typical to Florida in the summertime didn't have a chance to coalesce and impact this morning's launch window, and the Space Shuttle Discovery began its planned seven-day, 22-hour flight on Mission STS-70 from Launch Pad 39B at 9:41:55.078 a.m. EDT, just seconds off schedule. On board for Discovery's 21st spaceflight are a crew of five: Commander Terence "Tom" Henricks, Pilot Kevin R. Kregel, and Mission Specialists Nancy Jane Currie, Donald A. Thomas and Mary Ellen Weber. The crew's primary objective during the 70th Shuttle flight is to deploy the Tracking and Data Relay Satellite (TDRS-G), which will join a constellation of other TDRS spacecraft already on orbit. TDRS-G is destined to become an on- orbit, fully operational "ready reserve" satellite, available along with one other ready reserve TDRS spacecraft to back up the two primary TDRS satellites positions, TDRS East over the Atlantic Ocean and TDRS West over the Pacific. Assured capability of the TDRS communications network is essential for linking Earth-orbiting spacecraft such as the Shuttle and the Hubble Space Telescope with the ground. |
| Date |
07.13.1995 |
|
STS-70 Launch - Nikon E-2 Di
| Title |
STS-70 Launch - Nikon E-2 Digital Image |
| Description |
This test image was taken with a Nikon E-2 Digital Imaging System camera and are provided courtesy of Nikon (GIF 450x450 JPEG 1280x1000): The second Shuttle launch in 16 days hurtles off the pad into a sweltering summer sky. The unstable weather typical to Florida in the summertime didn't have a chance to coalesce and impact this morning's launch window, and the Space Shuttle Discovery began its planned seven-day, 22-hour flight on Mission STS-70 from Launch Pad 39B at 9:41:55.078 a.m. EDT, just seconds off schedule. On board for Discovery's 21st spaceflight are a crew of five: Commander Terence "Tom" Henricks, Pilot Kevin R. Kregel, and Mission Specialists Nancy Jane Currie, Donald A. Thomas and Mary Ellen Weber. The crew's primary objective during the 70th Shuttle flight is to deploy the Tracking and Data Relay Satellite (TDRS-G), which will join a constellation of other TDRS spacecraft already on orbit. TDRS-G is destined to become an on- orbit, fully operational "ready reserve" satellite, available along with one other ready reserve TDRS spacecraft to back up the two primary TDRS satellites positions, TDRS East over the Atlantic Ocean and TDRS West over the Pacific. Assured capability of the TDRS communications network is essential for linking Earth-orbiting spacecraft such as the Shuttle and the Hubble Space Telescope with the ground. |
| Date |
07.13.1995 |
|
|