Browse All : Space Shuttle Orbiter of Florida from 2007

Printer Friendly
1 2 3 428 29
1-50 of 1,415
     
     
Astro Camp Goes to Florida
Katie Craig, daughter of for …
8/8/07
Description Katie Craig, daughter of former Stennis Space Center Deputy Director Mark Craig, launches a 'balloon rocket' with the help of Rebecca Compretta, Astro Camp coordinator at SSC. SSC took Astro Camp on the road to Florida this week to engage children and their parents during activities surrounding the Aug. 8 launch of Space Shuttle Endeavour on NASA's STS-118 mission to the International Space Station. Astro Camp is SSC's popular space camp program designed to inspire and educate students using science and math principles.
Date 8/8/07
Photo Description Air Force fire/rescue crew enter the space shuttle cabin mockup hatch to evacuate the shuttle crew during a shuttle rescue training exercise at Edwards AFB. (USAF photo # 070505-F-1287F-118)
Project Description Personnel from NASA's Dryden Flight Research Center and Edwards Air Force Base conducted a training exercise on May 5, 2007, that would enable them to effectively handle the rescue of a space shuttle crew in the unlikely event of a landing mishap at the base. The exercises are held periodically to train Air Force fire/rescue and medical crews in aiding the shuttle crew in exiting the shuttle after a simulated landing mishap on or near the Edwards runway, escaping from the mishap area, and after triage assessment, safely evacuating injured crew members. Although NASA's Kennedy Space Center in Florida is the landing site of choice for space shuttle missions, Edwards AFB remains the primary alternate landing site in case weather or other situations preclude Florida as a landing option.
Photo Date May 5, 2007
Photo Description Air Force rescue team members load the volunteer "injured astronaut" on a stretcher into a Blackhawk helicopter for evacuation to a hospital during the exercise. (USAF photo # 070505-F-1287F-166)
Project Description Personnel from NASA's Dryden Flight Research Center and Edwards Air Force Base conducted a training exercise on May 5, 2007, that would enable them to effectively handle the rescue of a space shuttle crew in the unlikely event of a landing mishap at the base. The exercises are held periodically to train Air Force fire/rescue and medical crews in aiding the shuttle crew in exiting the shuttle after a simulated landing mishap on or near the Edwards runway, escaping from the mishap area, and after triage assessment, safely evacuating injured crew members. Although NASA's Kennedy Space Center in Florida is the landing site of choice for space shuttle missions, Edwards AFB remains the primary alternate landing site in case weather or other situations preclude Florida as a landing option.
Photo Date May 5, 2007
Air Force fire/rescue crew p …
Photo Description Air Force fire/rescue crew place a volunteer "injured astronaut" on a stretcher after exiting the shuttle cabin mockup during the training exercise. (USAF photo # 070505-F-1287F-126)
Project Description Personnel from NASA's Dryden Flight Research Center and Edwards Air Force Base conducted a training exercise on May 5, 2007, that would enable them to effectively handle the rescue of a space shuttle crew in the unlikely event of a landing mishap at the base. The exercises are held periodically to train Air Force fire/rescue and medical crews in aiding the shuttle crew in exiting the shuttle after a simulated landing mishap on or near the Edwards runway, escaping from the mishap area, and after triage assessment, safely evacuating injured crew members. Although NASA's Kennedy Space Center in Florida is the landing site of choice for space shuttle missions, Edwards AFB remains the primary alternate landing site in case weather or other situations preclude Florida as a landing option.
Photo Date May 5, 2007
Photo Description Complete with makeup to simulate facial injuries, a volunteer "astronaut" is tended to by aeromedical rescue staff after evacuation from the shuttle mockup. (USAF photo # 070505-F-1287F-145)
Project Description Personnel from NASA's Dryden Flight Research Center and Edwards Air Force Base conducted a training exercise on May 5, 2007, that would enable them to effectively handle the rescue of a space shuttle crew in the unlikely event of a landing mishap at the base. The exercises are held periodically to train Air Force fire/rescue and medical crews in aiding the shuttle crew in exiting the shuttle after a simulated landing mishap on or near the Edwards runway, escaping from the mishap area, and after triage assessment, safely evacuating injured crew members. Although NASA's Kennedy Space Center in Florida is the landing site of choice for space shuttle missions, Edwards AFB remains the primary alternate landing site in case weather or other situations preclude Florida as a landing option.
Photo Date May 5, 2007
Photo Description Clad in thermal protection suits, fire/rescue crew aid a volunteer "Injured astronaut" to a head-first ride down the exit slide from the shuttle cabin mockup. (USAF photo # 070505-F-1287F-132)
Project Description Personnel from NASA's Dryden Flight Research Center and Edwards Air Force Base conducted a training exercise on May 5, 2007, that would enable them to effectively handle the rescue of a space shuttle crew in the unlikely event of a landing mishap at the base. The exercises are held periodically to train Air Force fire/rescue and medical crews in aiding the shuttle crew in exiting the shuttle after a simulated landing mishap on or near the Edwards runway, escaping from the mishap area, and after triage assessment, safely evacuating injured crew members. Although NASA's Kennedy Space Center in Florida is the landing site of choice for space shuttle missions, Edwards AFB remains the primary alternate landing site in case weather or other situations preclude Florida as a landing option.
Photo Date May 5, 2007
Photo Description Following its landing on June 22, 2007, the Space Shuttle Atlantis is towed from the runway at Edwards Air Force Base to NASA Dryden's Mate-Demate Device (MDD) for post-flight processing in preparation for its return to the Kennedy Space Center in Florida.
Project Description Space Shuttle Atlantis descended to a smooth landing at Edwards Air Force Base, Calif., concluding a successful assembly mission to the International Space Station. With Commander Rick Sturckow and Pilot Lee Archambault at the controls, Atlantis landed at 12:49 p.m. PDT on June 22, 2007. Atlantis launched June 8, 2007, and arrived at the International Space Station on June 10. While at the orbital outpost, the crew installed the Starboard 3 and 4 truss segment and conducted four spacewalks to activate it. During the third spacewalk, the crew repaired an out of position thermal blanket on the left orbital maneuvering system pod. Atlantis also delivered a new station crew member, Flight Engineer Clayton Anderson. He replaced astronaut Suni Williams, who is the new record holder for a long-duration single spaceflight for a woman. She arrived at the station in December of 2006 with STS-116. STS-117 is the 118th shuttle mission and 21st mission to visit the space station.
Photo Date June 22, 2007
Photo Description Lit by sunlight filtered through the smoke of a distant forest fire, the Space Shuttle Atlantis receives post-flight servicing in the Mate-Demate Device (MDD), following its landing at NASA's Dryden Flight Research Center, Edwards, California. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA?s modified Boeing 747 Shuttle Carrier Aircraft.
Project Description Space Shuttle Atlantis descended to a smooth landing at Edwards Air Force Base, Calif., concluding a successful assembly mission to the International Space Station. With Commander Rick Sturckow and Pilot Lee Archambault at the controls, Atlantis landed at 12:49 p.m. PDT on June 22, 2007. Atlantis launched June 8, 2007, and arrived at the International Space Station on June 10. While at the orbital outpost, the crew installed the Starboard 3 and 4 truss segment and conducted four spacewalks to activate it. During the third spacewalk, the crew repaired an out of position thermal blanket on the left orbital maneuvering system pod. Atlantis also delivered a new station crew member, Flight Engineer Clayton Anderson. He replaced astronaut Suni Williams, who is the new record holder for a long-duration single spaceflight for a woman. She arrived at the station in December of 2006 with STS-116. STS-117 is the 118th shuttle mission and 21st mission to visit the space station.
Photo Date June 25, 2007
Photo Description The Space Shuttle Atlantis receives post-flight servicing in the Mate-Demate Device (MDD), following its landing at NASA's Dryden Flight Research Center, Edwards, California, June 22, 2007. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA?s modified Boeing 747 Shuttle Carrier Aircraft.
Project Description Space Shuttle Atlantis descended to a smooth landing at Edwards Air Force Base, Calif., concluding a successful assembly mission to the International Space Station. With Commander Rick Sturckow and Pilot Lee Archambault at the controls, Atlantis landed at 12:49 p.m. PDT on June 22, 2007. Atlantis launched June 8, 2007, and arrived at the International Space Station on June 10. While at the orbital outpost, the crew installed the Starboard 3 and 4 truss segment and conducted four spacewalks to activate it. During the third spacewalk, the crew repaired an out of position thermal blanket on the left orbital maneuvering system pod. Atlantis also delivered a new station crew member, Flight Engineer Clayton Anderson. He replaced astronaut Suni Williams, who is the new record holder for a long-duration single spaceflight for a woman. She arrived at the station in December of 2006 with STS-116. STS-117 is the 118th shuttle mission and 21st mission to visit the space station.
Photo Date June 23, 2007
Photo Description Technicians attach the tail cone, which helps reduce aerodynamic drag and turbulence during its ferry flight, to the Space Shuttle Atlantis in preparation for its return to NASA's Kennedy Space Center in Florida. After the tail-cone is installed, Discovery will be mounted on NASA?s modified Boeing 747 Shuttle Carrier Aircraft, or SCA, for the return flight.
Project Description Space Shuttle Atlantis descended to a smooth landing at Edwards Air Force Base, Calif., concluding a successful assembly mission to the International Space Station. With Commander Rick Sturckow and Pilot Lee Archambault at the controls, Atlantis landed at 12:49 p.m. PDT on June 22, 2007. Atlantis launched June 8, 2007, and arrived at the International Space Station on June 10. While at the orbital outpost, the crew installed the Starboard 3 and 4 truss segment and conducted four spacewalks to activate it. During the third spacewalk, the crew repaired an out of position thermal blanket on the left orbital maneuvering system pod. Atlantis also delivered a new station crew member, Flight Engineer Clayton Anderson. He replaced astronaut Suni Williams, who is the new record holder for a long-duration single spaceflight for a woman. She arrived at the station in December of 2006 with STS-116. STS-117 is the 118th shuttle mission and 21st mission to visit the space station.
Photo Date June 28, 2007
Photo Description Technicians attach the tail cone, which helps reduce aerodynamic drag and turbulence during its ferry flight, to the Space Shuttle Atlantis in preparation for its return to NASA's Kennedy Space Center in Florida. After the tail-cone is installed, Discovery will be mounted on NASA?s modified Boeing 747 Shuttle Carrier Aircraft, or SCA, for the return flight.
Project Description Space Shuttle Atlantis descended to a smooth landing at Edwards Air Force Base, Calif., concluding a successful assembly mission to the International Space Station. With Commander Rick Sturckow and Pilot Lee Archambault at the controls, Atlantis landed at 12:49 p.m. PDT on June 22, 2007. Atlantis launched June 8, 2007, and arrived at the International Space Station on June 10. While at the orbital outpost, the crew installed the Starboard 3 and 4 truss segment and conducted four spacewalks to activate it. During the third spacewalk, the crew repaired an out of position thermal blanket on the left orbital maneuvering system pod. Atlantis also delivered a new station crew member, Flight Engineer Clayton Anderson. He replaced astronaut Suni Williams, who is the new record holder for a long-duration single spaceflight for a woman. She arrived at the station in December of 2006 with STS-116. STS-117 is the 118th shuttle mission and 21st mission to visit the space station.
Photo Date June 28, 2007
Photo Description NASA's modified Boeing 747 Shuttle Carrier Aircraft with the Space Shuttle Atlantis on top lifts off from Edwards Air Force Base to begin its ferry flight back to the Kennedy Space Center in Florida. The cross-country journey will take approximately two days, with stops at several intermediate points for refueling.
Project Description Space Shuttle Atlantis descended to a smooth landing at Edwards Air Force Base, Calif., concluding a successful assembly mission to the International Space Station. With Commander Rick Sturckow and Pilot Lee Archambault at the controls, Atlantis landed at 12:49 p.m. PDT on June 22, 2007. Atlantis launched June 8, 2007, and arrived at the International Space Station on June 10. While at the orbital outpost, the crew installed the Starboard 3 and 4 truss segment and conducted four spacewalks to activate it. During the third spacewalk, the crew repaired an out of position thermal blanket on the left orbital maneuvering system pod. Atlantis also delivered a new station crew member, Flight Engineer Clayton Anderson. He replaced astronaut Suni Williams, who is the new record holder for a long-duration single spaceflight for a woman. She arrived at the station in December of 2006 with STS-116. STS-117 is the 118th shuttle mission and 21st mission to visit the space station.
Photo Date July 1, 2007
Photo Description NASA's modified Boeing 747 Shuttle Carrier Aircraft with the Space Shuttle Atlantis on top lifts off from Edwards Air Force Base to begin its ferry flight back to the Kennedy Space Center in Florida. The cross-country journey will take approximately two days, with stops at several intermediate points for refueling.
Project Description Space Shuttle Atlantis descended to a smooth landing at Edwards Air Force Base, Calif., concluding a successful assembly mission to the International Space Station. With Commander Rick Sturckow and Pilot Lee Archambault at the controls, Atlantis landed at 12:49 p.m. PDT on June 22, 2007. Atlantis launched June 8, 2007, and arrived at the International Space Station on June 10. While at the orbital outpost, the crew installed the Starboard 3 and 4 truss segment and conducted four spacewalks to activate it. During the third spacewalk, the crew repaired an out of position thermal blanket on the left orbital maneuvering system pod. Atlantis also delivered a new station crew member, Flight Engineer Clayton Anderson. He replaced astronaut Suni Williams, who is the new record holder for a long-duration single spaceflight for a woman. She arrived at the station in December of 2006 with STS-116. STS-117 is the 118th shuttle mission and 21st mission to visit the space station.
Photo Date July 1, 2007
Photo Description NASA's modified Boeing 747 Shuttle Carrier Aircraft with the Space Shuttle Atlantis on top lifts off from Edwards Air Force Base to begin its ferry flight back to the Kennedy Space Center in Florida. The cross-country journey will take approximately two days, with stops at several intermediate points for refueling.
Project Description Space Shuttle Atlantis descended to a smooth landing at Edwards Air Force Base, Calif., concluding a successful assembly mission to the International Space Station. With Commander Rick Sturckow and Pilot Lee Archambault at the controls, Atlantis landed at 12:49 p.m. PDT on June 22, 2007. Atlantis launched June 8, 2007, and arrived at the International Space Station on June 10. While at the orbital outpost, the crew installed the Starboard 3 and 4 truss segment and conducted four spacewalks to activate it. During the third spacewalk, the crew repaired an out of position thermal blanket on the left orbital maneuvering system pod. Atlantis also delivered a new station crew member, Flight Engineer Clayton Anderson. He replaced astronaut Suni Williams, who is the new record holder for a long-duration single spaceflight for a woman. She arrived at the station in December of 2006 with STS-116. STS-117 is the 118th shuttle mission and 21st mission to visit the space station.
Photo Date July 1, 2007
Convoy of Rescue and Support …
Evacuation and Airlift of Sp …
Triage Assessment of Space S …
Astro Camp Goes to Florida
Title Astro Camp Goes to Florida
Description Katie Craig, daughter of former Stennis Space Center Deputy Director Mark Craig, launches a 'balloon rocket' with the help of Rebecca Compretta, Astro Camp coordinator at SSC. SSC took Astro Camp on the road to Florida this week to engage children and their parents during activities surrounding the Aug. 8 launch of Space Shuttle Endeavour on NASA's STS-118 mission to the International Space Station. Astro Camp is SSC's popular space camp program designed to inspire and educate students using science and math principles.
Date 08.08.2007
General Description STS-117 Shuttle Mission Imagery
General Description STS-117 Shuttle Mission Imagery
General Description STS-117 Shuttle Mission Imagery
General Description STS-117 Shuttle Mission Imagery
General Description STS-117 Shuttle Mission Imagery
General Description STS-120 Shuttle Mission Imagery
General Description STS-117 Shuttle Mission Imagery
General Description STS-117 Shuttle Mission Imagery
General Description STS-118 Shuttle Mission Imagery
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, STS-117 Mission Specialist James Reilly (right) discusses the S3/S4 Integrated Truss Segment with a technician during Crew Equipment Interface Test (CEIT) activities. A CEIT provides the astronauts opportunities to become familiar with equipment and hardware with which they will be working during their mission. The crew of mission STS-117 will deliver and install the second and third starboard truss segments (S3/S4) and another pair of solar arrays and batteries during the Space Shuttle Program's 21st mission to the International Space Station. Launch of Space Shuttle Atlantis is scheduled for March 2007. Photo credit: NASA/Kim Shiflett
Release Date 12/14/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, STS-117 Mission Specialist James Reilly examines the S3/S4 Integrated Truss Segment during Crew Equipment Interface Test (CEIT) activities. A CEIT provides the astronauts opportunities to become familiar with equipment and hardware with which they will be working during their mission. The crew of mission STS-117 will deliver and install the second and third starboard truss segments (S3/S4) and another pair of solar arrays and batteries during the Space Shuttle Program's 21st mission to the International Space Station. Launch of Space Shuttle Atlantis is scheduled for March 2007. Photo credit: NASA/Kim Shiflett
Release Date 12/14/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, a technician points out elements of the S3/S4 Integrated Truss Segment to STS-117 Mission Specialist James Reilly (right) during Crew Equipment Interface Test (CEIT) activities. A CEIT provides the astronauts opportunities to become familiar with equipment and hardware with which they will be working during their mission. The crew of mission STS-117 will deliver and install the second and third starboard truss segments (S3/S4) and another pair of solar arrays and batteries during the Space Shuttle Program's 21st mission to the International Space Station. Launch of Space Shuttle Atlantis is scheduled for March 2007. Photo credit: NASA/Kim Shiflett
Release Date 12/14/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Inside Endeavour's opened payload bay, a worker checks the installation of the wiring modification called the "Station to Shuttle Power Transfer System," or SSPTS. The SSPTS allows the space shuttle to stay docked at the International Space Station longer by providing its power and preserving its consumables. Endeavour is scheduled for mission STS-118 in June. It will be the orbiter's first shuttle flight in nearly five years. The vehicle has undergone an extensive modification period, including the addition of all of the return-to-flight safety modifications added to both Discovery and Atlantis. The June mission will deliver another starboard solar array, S5, to the International Space Station. Photo credit: NASA/Kim Shiflett
Release Date 01/05/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Inside Endeavour's opened payload bay, workers at each end install a wiring modification called the "Station to Shuttle Power Transfer System," or SSPTS. The SSPTS allows the space shuttle to stay docked at the International Space Station longer by providing its power and preserving its consumables. Endeavour is scheduled for mission STS-118 in June. It will be the orbiter's first shuttle flight in nearly five years. The vehicle has undergone an extensive modification period, including the addition of all of the return-to-flight safety modifications added to both Discovery and Atlantis. The June mission will deliver another starboard solar array, S5, to the International Space Station. Photo credit: NASA/Kim Shiflett
Release Date 01/05/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Inside Endeavour's opened payload bay, a worker installs a wiring modification called the "Station to Shuttle Power Transfer System," or SSPTS. The SSPTS allows the space shuttle to stay docked at the International Space Station longer by providing its power and preserving its consumables. Endeavour is scheduled for mission STS-118 in June. It will be the orbiter's first shuttle flight in nearly five years. The vehicle has undergone an extensive modification period, including the addition of all of the return-to-flight safety modifications added to both Discovery and Atlantis. The June mission will deliver another starboard solar array, S5, to the International Space Station. Photo credit: NASA/Kim Shiflett
Release Date 01/05/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, STS-122 crew members inspect the Columbus European Laboratory, part of the payload on their mission. Seen here is Commander Steve Frick. The crew is participating in a crew equipment interface test that provides opportunities for hands-on experience with payloads and equipment. The other crew members are Pilot Alan Poindexter and Mission Specialists Rex Walheim, Stan Love, Leland Melvin and Hans Schlegel, who represents the European Space Agency. The 24th mission to the International Space Station, STS-122 will also include the Multi-Purpose Experiment Support Structure - Non-Deployable (MPESS-ND). Launch of STS-122 on Space Shuttle Discovery is scheduled no earlier than October. Photo credit: NASA/Kim Shiflett
Release Date 01/11/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, STS-122 crew members inspect the Columbus European Laboratory, part of the payload on their mission. Here, Mission Specialist Rex Walheim closely examines a component of the laboratory. The crew is participating in a crew equipment interface test that provides opportunities for hands-on experience with payloads and equipment. The other crew members are Commander Steve Frick, Pilot Alan Poindexter and Mission Specialists Stan Love, Leland Melvin and Hans Schlegel, who represents the European Space Agency. The 24th mission to the International Space Station, STS-122 will also include the Multi-Purpose Experiment Support Structure - Non-Deployable (MPESS-ND). Launch of STS-122 on Space Shuttle Discovery is scheduled no earlier than October. Photo credit: NASA/Kim Shiflett
Release Date 01/11/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, STS-122 crew members inspect the Columbus European Laboratory, part of the payload on their mission. Seen here is Commander Steve Frick. The crew is participating in a crew equipment interface test that provides opportunities for hands-on experience with payloads and equipment. The other crew members are Pilot Alan Poindexter and Mission Specialists Rex Walheim, Stan Love, Leland Melvin and Hans Schlegel, who represents the European Space Agency. The 24th mission to the International Space Station, STS-122 will also include the Multi-Purpose Experiment Support Structure - Non-Deployable (MPESS-ND). Launch of STS-122 on Space Shuttle Discovery is scheduled no earlier than October. Photo credit: NASA/Kim Shiflett
Release Date 01/11/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- External tank No. 124 is lowered between the twin solid rocket boosters in high bay 1 of the Vehicle Assembly Building. The tank will be mated with the SRBs, already in place on the mobile launcher platform, for mission STS-117. The mission is targeted to launch on March 16 aboard Space Shuttle Atlantis. Photo credit: NASA/Kim Shiflett
Release Date 01/19/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- External tank No. 124 is lowered into high bay 1 of the Vehicle Assembly Building where it will be mated with the solid rocket boosters for mission STS-117. The boosters are already in place on the mobile launcher platform in the VAB. The mission is targeted to launch on March 16 aboard Space Shuttle Atlantis. Photo credit: NASA/Kim Shiflett
Release Date 01/19/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- External tank No. 124 is lowered into high bay 1 of the Vehicle Assembly Building where it will be mated with the solid rocket boosters for mission STS-117. The boosters are already in place on the mobile launcher platform in the VAB. The mission is targeted to launch on March 16 aboard Space Shuttle Atlantis. Photo credit: NASA/Kim Shiflett
Release Date 01/19/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In Orbiter Processing Facility bay 2, technicians on a Hyster forklift maneuver space shuttle main engine no. 3 into place on Endeavour. Each space shuttle main engine is 14 feet long, weighs about 6,700 pounds, and is 7.5 feet in diameter at the end of the nozzle. The orbiter is scheduled for mission STS-118, targeted for launch on June 28. The mission will be the 22nd flight to the International Space Station, carrying another starboard array, S5, for installation. Photo credit: NASA/George Shelton
Release Date 01/19/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- External tank No. 124 is moved from its checkout cell in the Vehicle Assembly Building to high bay 1 where it will be mated with the solid rocket boosters for mission STS-117. The boosters are already in place on the mobile launcher platform in the VAB. The mission is targeted to launch on March 16 aboard Space Shuttle Atlantis. Photo credit: NASA/Kim Shiflett
Release Date 01/19/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- External tank No. 124 is lowered into high bay 1 of the Vehicle Assembly Building where it will be mated with the solid rocket boosters for mission STS-117. The boosters are already in place on the mobile launcher platform in the VAB. The mission is targeted to launch on March 16 aboard Space Shuttle Atlantis. Photo credit: NASA/Kim Shiflett
Release Date 01/19/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- External tank No. 124 is lowered between the twin solid rocket boosters in high bay 1 of the Vehicle Assembly Building. The tank will be mated with the SRBs, already in place on the mobile launcher platform, for mission STS-117. The mission is targeted to launch on March 16 aboard Space Shuttle Atlantis. Photo credit: NASA/Kim Shiflett
Release Date 01/19/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In Orbiter Processing Facility bay 2, technicians on a Hyster forklift maneuver space shuttle main engine no. 3 into place on Endeavour. Each space shuttle main engine is 14 feet long, weighs about 6,700 pounds, and is 7.5 feet in diameter at the end of the nozzle. The orbiter is scheduled for mission STS-118, targeted for launch on June 28. The mission will be the 22nd flight to the International Space Station, carrying another starboard array, S5, for installation. Photo credit: NASA/George Shelton
Release Date 01/19/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- In Orbiter Processing Facility bay 2, technicians on a Hyster forklift install space shuttle main engine no. 3 into Endeavour. Each space shuttle main engine is 14 feet long, weighs about 6,700 pounds, and is 7.5 feet in diameter at the end of the nozzle. The orbiter is scheduled for mission STS-118, targeted for launch on June 28. The mission will be the 22nd flight to the International Space Station, carrying another starboard array, S5, for installation. Photo credit: NASA/George Shelton
Release Date 01/19/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Russell Romanella, director of the International Space Station/Payload Processing Directorate at Kennedy Space Center, addresses guests and attendees in the Operations and Checkout (O&C) Building high bay in the ceremony commemorating the bay's transition for use by the Constellation Program. Seated on the dais at right are Cleon Lacefield, Lockheed Martin program manager, Thad Altman, representative of the State of Florida, Bill Parsons, Kennedy Space Center director, Steve Koller, executive director of Space Florida, and Skip Hatfield, Orion Project manager. Originally built to process space vehicles in the Apollo era, the O&C Building will serve as the final assembly facility for the Orion crew exploration vehicle. Orion, America's human spaceflight vehicle of the future, will be capable of transporting four crewmembers for lunar missions and later will support crew transfers for Mars missions. Each Orion spacecraft also may be used to support up to six crewmembers to the International Space Station after the space shuttle is retired in 2010. Design, development and construction of Orion's components will be performed by Lockheed Martin for NASA at facilities throughout the country. Photo credit: NASA/Kim Shiflett
Release Date 01/30/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- After a ceremony to commemorate the transition of the historic Operations and Checkout (O&C) Building high bay for use by the Constellation Program, representatives from NASA, Lockheed Martin, Space Florida and the state of Florida look at the banner, unfurled by Kennedy Space Center Director Bill Parsons (center), spotlighting the Orion crew exploration vehicle that will be assembled in the O&C. From left are Russell Romanella, director of the International Space Station/Payload Processing Directorate at Kennedy Space Center, Thad Altman, representative of the State of Florida, Cleon Lacefield, Lockheed Martin program manager, Parsons, Steve Koller, executive director of Space Florida (turned away), and Skip Hatfield, Orion Project manager. Originally built to process space vehicles in the Apollo era, the O&C Building will serve as the final assembly facility for the Orion crew exploration vehicle. Orion, America's human spaceflight vehicle of the future, will be capable of transporting four crewmembers for lunar missions and later will support crew transfers for Mars missions. Each Orion spacecraft also may be used to support up to six crewmembers to the International Space Station after the space shuttle is retired in 2010. Design, development and construction of Orion's components will be performed by Lockheed Martin for NASA at facilities throughout the country. Photo credit: NASA/Kim Shiflett
Release Date 01/30/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Kennedy Space Center Director Bill Parsons addresses guests and attendees in the Operations and Checkout (O&C) Building high bay in the ceremony commemorating the bay's transition for use by the Constellation Program. At right is Russell Romanella, director of the International Space Station/Payload Processing Directorate at Kennedy Space Center. Other representatives from NASA, Lockheed Martin, Space Florida and the state of Florida also attended. Originally built to process space vehicles in the Apollo era, the O&C Building will serve as the final assembly facility for the Orion crew exploration vehicle. Orion, America's human spaceflight vehicle of the future, will be capable of transporting four crewmembers for lunar missions and later will support crew transfers for Mars missions. Each Orion spacecraft also may be used to support up to six crewmembers to the International Space Station after the space shuttle is retired in 2010. Design, development and construction of Orion's components will be performed by Lockheed Martin for NASA at facilities throughout the country. Photo credit: NASA/Kim Shiflett
Release Date 01/30/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Employees and guests are seated in the Operations and Checkout (O&C) Building high bay for the ceremony commemorating the bay's transition for use by the Constellation Program. Originally built to process space vehicles in the Apollo era, the O&C Building will serve as the final assembly facility for the Orion crew exploration vehicle. Orion, America's human spaceflight vehicle of the future, will be capable of transporting four crewmembers for lunar missions and later will support crew transfers for Mars missions. Each Orion spacecraft also may be used to support up to six crewmembers to the International Space Station after the space shuttle is retired in 2010. Design, development and construction of Orion's components will be performed by Lockheed Martin for NASA at facilities throughout the country. Photo credit: NASA/Kim Shiflett
Release Date 01/30/2007
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Skip Hatfield, Orion Project manager, addresses guests and attendees in the Operations and Checkout (O&C) Building high bay in the ceremony commemorating the bay's transition for use by the Constellation Program. Seated on the dais at right are representatives from NASA, Lockheed Martin, Space Florida and the state of Florida: Russell Romanella, director of the International Space Station/Payload Processing Directorate at Kennedy Space Center, Cleon Lacefield, Lockheed Martin program manager, Thad Altman, representative of the State of Florida, Bill Parsons, director of Kennedy Space Center, and Steve Koller, executive director of Space Florida. Originally built to process space vehicles in the Apollo era, the O&C Building will serve as the final assembly facility for the Orion crew exploration vehicle. Orion, America's human spaceflight vehicle of the future, will be capable of transporting four crewmembers for lunar missions and later will support crew transfers for Mars missions. Each Orion spacecraft also may be used to support up to six crewmembers to the International Space Station after the space shuttle is retired in 2010. Design, development and construction of Orion's components will be performed by Lockheed Martin for NASA at facilities throughout the country. Photo credit: NASA/Kim Shiflett
Release Date 01/30/2007
1 2 3 428 29
1-50 of 1,415