Browse All : Space Shuttle Orbiter and Sun from 2006

Printer Friendly
1-31 of 31
     
     
Solar Storm Heads for Earth: …
nasa, nasaimageofthedaygalle …
Above the visible surface of …
flare_las_2006347
mediatype IMAGE
mediatype image
date 2006-12-13
creator NASA -- NASA image courtesy the sohowww.nascom.nasa.gov/ SOHO project. Caption adapted from the SOHO Website.
identifier flare_las_2006347
Frosty Dunes
PIA08069
Sol (our sun)
Mars Orbiter Camera
Title Frosty Dunes
Original Caption Released with Image 12 April 2006 Today, the MOC Team celebrates the 45th anniversary of the first human flight into space, that of Yuri Gagarin on 12 April 1961, and the 25th anniversary of the first NASA Space Shuttle flight on 12 April 1981, by briefly pondering the wonders of our Solar System and the opportunities of the age in which we live. Although humans have not ventured to the Moon in more than 30 years, and have not yet gone to Mars, we can all go there through the eyes of our robotic explorers. Mars, perhaps the most Earth-like (yet so very different!) planet in our star's system, is tilted on its axis by about 25°-not all that different than Earth's ~23.5°. Thus, Mars, like Earth, experiences a changing of seasons as the planet revolves around the Sun. At high latitudes in each hemisphere during autumn and winter, carbon dioxide frost accumulates on the surface. This Mars Global Surveyor (MGS) Mars Orbiter Camera (MOC) image shows dunes covered and delineated by seasonal frost in the north polar region of Mars. The winds responsible for the formation of these dunes blew primarily from the northwest (upper left), with additional influences from the north and northeast. During the late spring and summer seasons, these dunes would look much darker than their surroundings, but in this late winter image, the dunes and the plains on which they occur are all covered with carbon dioxide frost. "Location near": 78.4°N, 76.7°W "Image width": ~3 km (~1.9 mi) "Illumination from": lower left "Season": Northern Winter
John F. Kennedy Space Center
PIA01918
Sol (our sun)
ASTER
Title John F. Kennedy Space Center
Original Caption Released with Image The John F. Kennedy Space Center, America's spaceport, is located along Florida's eastern shore on Cape Canaveral. Established as NASA's Launch Operations Center on July 1, 1962, the center has been the site of launching all U.S. human space flight missions, from the early days of Project Mercury to the space shuttle and the next generation of vehicles. In addition, the center is home to NASA's Launch Services Program, which coordinates all expendable vehicle launches carrying a NASA payload. With its 14 spectral bands from the visible to the thermal infrared wavelength region, and its high spatial resolution of 15 to 90 meters (about 50 to 300 feet), ASTER images Earth to map and monitor the changing surface of our planet. ASTER is one of five Earth-observing instruments launched December 18, 1999, on NASA's Terra satellite. The instrument was built by Japan's Ministry of Economy, Trade and Industry. A joint U.S./Japan science team is responsible for validation and calibration of the instrument and the data products. The broad spectral coverage and high spectral resolution of ASTER provides scientists in numerous disciplines with critical information for surface mapping, and monitoring of dynamic conditions and temporal change. Example applications are: monitoring glacial advances and retreats, monitoring potentially active volcanoes, identifying crop stress, determining cloud morphology and physical properties, wetlands evaluation, thermal pollution monitoring, coral reef degradation, surface temperature mapping of soils and geology, and measuring surface heat balance. The U.S. science team is located at NASA's Jet Propulsion Laboratory, Pasadena, Calif. The Terra mission is part of NASA's Science Mission Directorate. Size: 32.6 by 51.2 kilometers (20.2 by 32.2 miles) Location: 28.6 degrees North latitude, 80.6 degrees West longitude Orientation: North at top Image Data: ASTER bands 3, 2, and 1 Original Data Resolution: 15 meters (49.2 feet) Dates Acquired: April 26, 2006
Viking 1's 30th!
PIA08616
Sol (our sun)
Mars Orbiter Camera
Title Viking 1's 30th!
Original Caption Released with Image 20 July 2006 Viking 1 landed 30 years ago today, on 20 July 1976. It was the first U.S. landing on Mars and a very exciting time for Mars exploration. Since that time, four additional spacecraft have successfully landed on Mars and conducted their science investigations. Today, new missions to the martian surface are in the works, with landings expected in 2008 (Phoenix) and 2010 (Mars Science Laboratory). The Viking 1 lander is difficult to see in Mars Global Surveyor (MGS) Mars Orbiter Camera (MOC) images. The western Chryse Planitia landing site is often obscured by dust hazes and occasional storms, especially during northern winter, which would otherwise be the best time to look for the lander from orbit because the sun casts longer shadows in winter. When the atmosphere is clearest, in portions of the spring and summer, the sun is higher in the sky as seen from MGS's orbit. The spacecraft always passes over the landing site region around 2 p.m. in the afternoon. The suite of pictures shown here describes the best MOC view of the landing site. These were previously released in May 2005 [ http://www.msss.com/mars_images/moc/2005/05/09/ ], but the MOC team felt that 20 July 2006 is an appropriate time to review this story. The first figure (left) visually tells how the lander was found. The initial observations of the location of Viking 1, as originally determined by members of the Viking science team based on sightlines to various crater rims seen in the lander images (black lines), did not show the detailed features we knew from the lander pictures (middle) to be in the area. Using geodetic measurements, the late Merton Davies of the RAND Corporation, a MGS MOC Co-Investigator, suggested that we should image areas to the east and north of where Viking 1 was thought to be. Timothy J. Parker of the Jet Propulsion Laboratory (Pasadena, California), using sightlines to crater rims seen in the lander images (white lines), deduced a location very close to that suggested by Davies. The MOC image of that location, acquired in 2003, showed additional near-field features (rocks associated with a nearby crater) that closely matched the Viking 1 images (center and right frame, where B denotes "Volkswagen Rock"). The inset (upper right) is an enlargement that shows the location of the Viking 1 lander. The MOC image of the Viking 1 lander site (right) was acquired during a test of the MGS Pitch and Roll Observation (PROTO) technique conducted on 11 May 2003. (Following initial tests, the "c" part of "cPROTO" was begun by adding compensation for the motion of the planet to the technique). The PROTO or cPROTO approach allows MOC to obtain images with better than its nominal 1.5 meters (5 ft) per pixel resolution. The image shown here (right) was map projected at 50 centimeters (~20 inches) per pixel. The full 11 May 2003 image can be viewed in the MOC Gallery [ http://www.msss.com/moc_gallery/ ], it is image, R05-00966 [ http://www.msss.com/moc_gallery/r03_r09/images/R05/R0500966.html ]. In addition to celebrating the 30th anniversary of the first U.S. robotic Mars landing, we note that 20 July is also the 37th anniversary of the first human landing on the Moon, on 20 July 1969. There are two dates that are most sacred in the space business (three, if you count the 4 October 1957 launch of Sputnik 1). The other date is 12 April, which celebrates the 1961 launch of the first human in space, and the 1981 launch of the first space shuttle orbiter.
General Description STS-121 Shuttle Mission Imagery
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- The sun is setting as Space Shuttle Discovery arrives on the hardstand of Launch Pad 39B at NASA's Kennedy Space Center. At right are the fixed and rotating service structures. First motion was at 12:45 p.m. EDT. The shuttle rests on a mobile launcher platform and made the 4.2-mile journey from the Vehicle Assembly Building via the crawler-transporter beneath the platform. The rollout is an important step before launch of Discovery on mission STS-121 to the International Space Station. First motion of the shuttle leaving NASA's Vehicle Assembly Building was at 12:45 p.m. EDT. Discovery's launch is targeted for July 1 in a launch window that extends to July 19. During the 12-day mission, Discovery's crew will test new hardware and techniques to improve shuttle safety, as well as deliver supplies and make repairs to the station. Photo credit: NASA/Ken Thornsley
Release Date 05/19/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- The sun is setting as Space Shuttle Discovery nears its place on Launch Pad 39B at NASA's Kennedy Space Center. At right are the fixed and rotating service structures. First motion was at 12:45 p.m. EDT. The shuttle rests on a mobile launcher platform and made the 4.2-mile journey from the Vehicle Assembly Building via the crawler-transporter beneath the platform. The rollout is an important step before launch of Discovery on mission STS-121 to the International Space Station. Discovery's launch is targeted for July 1 in a launch window that extends to July 19. During the 12-day mission, Discovery's crew will test new hardware and techniques to improve shuttle safety, as well as deliver supplies and make repairs to the station. Photo credit: NASA/Dimitri Gerondidakis
Release Date 05/19/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Silhouetted against the rising sun, Space Shuttle Atlantis rolls toward Launch Pad 39B. First motion out of the Vehicle Assembly Building was 1:05 a.m. The shuttle sits on top of the mobile launcher platform, which in turn rests on the crawler-transporter. The slow speed of the crawler results in a 6-hour trek to the pad approximately 4 miles away. Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/Troy Cryder
Release Date 08/02/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Silhouetted against the rising sun, Space Shuttle Atlantis rolls toward Launch Pad 39B. First motion out of the Vehicle Assembly Building was 1:05 a.m. The shuttle sits on top of the mobile launcher platform, which in turn rests on the crawler-transporter. The slow speed of the crawler results in a 6-hour trek to the pad approximately 4 miles away. Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/George Shelton
Release Date 08/02/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Silhouetted by the rising sun behind it, Space Shuttle Discovery, atop the mobile launcher platform and the crawler-transporter underneath, makes its final approach up the ramp to Launch Pad 39B for launch of mission STS-116. The mission is No. 20 to the International Space Station and construction flight 12A.1. The mission payload is the SPACEHAB module, the P5 integrated truss structure and other key components. The launch window for mission STS-116 opens Dec. 7. Photo credit: NASA/Amanda Diller
Release Date 11/09/2006
JOHNSON SPACE CENTER, TX - S …
Description JOHNSON SPACE CENTER, TX - STS115-S-001 (February 2003) -- This is the STS-115 insignia. This mission continues the assembly of the International Space Station with the installation of the truss segments P3 and P4. Following the installation of the segments utilizing both the shuttle and the station robotic arms, a series of four space walks will complete the final connections and prepare for the deployment of the station's second set of solar arrays. To reflect the primary mission of the flight, the patch depicts a solar panel as the main element. As the Space Shuttle Atlantis launches towards the ISS, its trail depicts the symbol of the Astronaut Office. The starburst, representing the power of the sun, rises over the Earth and shines on the solar panel. The shuttle flight number 115 is shown at the bottom of the patch, along with the ISS assembly designation 12A (the 12th American assembly mission). The blue Earth in the background reminds us of the importance of space exploration and research to all of Earth's inhabitants. The NASA insignia design for shuttle flights is reserved for use by the astronauts and for other official use as the NASA Administrator may authorize. Public availability has been approved only in the forms of illustrations by the various news media. When and if there is any change in this policy, which is not anticipated, the change will be publicly announced.
Release Date 04/14/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery's drag chute unfurls upon landing on Runway 15 at NASA Kennedy Space Center's Shuttle Landing Facility as the sun sets on the shortest day of the year, concluding mission STS-116. In the background, right of the space shuttle, is the landing strip's Mate-Demate Device. Aboard Discovery are Commander Mark Polansky, Pilot William Oefelein, and Mission Specialists Robert Curbeam, Joan Higginbotham, Nicholas Patrick and Christer Fuglesang, who represents the European Space Agency, as well as Thomas Reiter, who is returning from a 6-month stay on the International Space Station. During the mission, three spacewalks attached the P5 integrated truss structure to the station, and completed the rewiring of the orbiting laboratory?s power system. A fourth spacewalk retracted a stubborn solar array. Main gear touchdown was at 5:32 p.m. EST. Nose gear touchdown was at 5:32:12 p.m. and wheel stop was at 5:32:52 p.m. At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Discovery traveled 5,330,000 miles, landing on orbit 204. Mission elapsed time was 12 days, 20 hours, 44 minutes and 16 seconds. This is the 64th landing at KSC. Photo credit: NASA/Chris Lynch
Release Date 12/22/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery's drag chute unfurls upon landing on Runway 15 at NASA Kennedy Space Center's Shuttle Landing Facility as the sun sets on the shortest day of the year, concluding mission STS-116. In the background is the 525-foot-tall Vehicle Assembly Building. Aboard are Commander Mark Polansky, Pilot William Oefelein, and Mission Specialists Robert Curbeam, Joan Higginbotham, Nicholas Patrick and Christer Fuglesang, who represents the European Space Agency, as well as Thomas Reiter, who is returning from a 6-month stay on the International Space Station. During the mission, three spacewalks attached the P5 integrated truss structure to the station, and completed the rewiring of the orbiting laboratory's power system. A fourth spacewalk retracted a stubborn solar array. Main gear touchdown was at 5:32 p.m. EST. Nose gear touchdown was at 5:32:12 p.m. and wheel stop was at 5:32:52 p.m. At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Discovery traveled 5,330,000 miles, landing on orbit 204. Mission elapsed time was 12 days, 20 hours, 44 minutes and 16 seconds. This is the 64th landing at KSC. Photo credit: NASA/Tom Joseph
Release Date 12/22/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery touches down on an illuminated Runway 15 at NASA Kennedy Space Center's Shuttle Landing Facility as the sun sets, concluding mission STS-116. Aboard are Commander Mark Polansky, Pilot William Oefelein, and Mission Specialists Robert Curbeam, Joan Higginbotham, Nicholas Patrick and Christer Fuglesang, who represents the European Space Agency, as well as Thomas Reiter, who is returning from a 6-month stay on the International Space Station. During the mission, three spacewalks attached the P5 integrated truss structure to the station, and completed the rewiring of the orbiting laboratory's power system. A fourth spacewalk retracted a stubborn solar array. Main gear touchdown was at 5:32 p.m. EST. Nose gear touchdown was at 5:32:12 p.m. and wheel stop was at 5:32:52 p.m. At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Discovery traveled 5,330,000 miles, landing on orbit 204. Mission elapsed time was 12 days, 20 hours, 44 minutes and 16 seconds. This is the 64th landing at KSC. Photo credit: NASA/Tom Joseph
Release Date 12/22/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery nears touchdown on an illuminated Runway 15 at NASA Kennedy Space Center's Shuttle Landing Facility as the sun sets on the shortest day of the year, concluding mission STS-116. Aboard are Commander Mark Polansky, Pilot William Oefelein, and Mission Specialists Robert Curbeam, Joan Higginbotham, Nicholas Patrick and Christer Fuglesang, who represents the European Space Agency, as well as Thomas Reiter, who is returning from a 6-month stay on the International Space Station. During the mission, three spacewalks attached the P5 integrated truss structure to the station, and completed the rewiring of the orbiting laboratory?s power system. A fourth spacewalk retracted a stubborn solar array. Main gear touchdown was at 5:32 p.m. EST. Nose gear touchdown was at 5:32:12 p.m. and wheel stop was at 5:32:52 p.m. At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Discovery traveled 5,330,000 miles, landing on orbit 204. Mission elapsed time was 12 days, 20 hours, 44 minutes and 16 seconds. This is the 64th landing at KSC. Photo credit: NASA/Chris Lynch
Release Date 12/22/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery's drag chute unfurls upon landing on Runway 15 at NASA Kennedy Space Center's Shuttle Landing Facility as the sun sets on the shortest day of the year, concluding mission STS-116. Aboard are Commander Mark Polansky, Pilot William Oefelein, and Mission Specialists Robert Curbeam, Joan Higginbotham, Nicholas Patrick and Christer Fuglesang, who represents the European Space Agency, as well as Thomas Reiter, who is returning from a 6-month stay on the International Space Station. During the mission, three spacewalks attached the P5 integrated truss structure to the station, and completed the rewiring of the orbiting laboratory?s power system. A fourth spacewalk retracted a stubborn solar array. Main gear touchdown was at 5:32 p.m. EST. Nose gear touchdown was at 5:32:12 p.m. and wheel stop was at 5:32:52 p.m. At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Discovery traveled 5,330,000 miles, landing on orbit 204. Mission elapsed time was 12 days, 20 hours, 44 minutes and 16 seconds. This is the 64th landing at KSC. Photo credit: NASA/Kim Shiflett
Release Date 12/22/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery nears touchdown on Runway 15 at NASA Kennedy Space Center's Shuttle Landing Facility as the sun sets on the shortest day of the year, concluding mission STS-116. Aboard are Commander Mark Polansky, Pilot William Oefelein, and Mission Specialists Robert Curbeam, Joan Higginbotham, Nicholas Patrick and Christer Fuglesang, who represents the European Space Agency, as well as Thomas Reiter, who is returning from a 6-month stay on the International Space Station. During the mission, three spacewalks attached the P5 integrated truss structure to the station, and completed the rewiring of the orbiting laboratory's power system. A fourth spacewalk retracted a stubborn solar array. Main gear touchdown was at 5:32 p.m. EST. Nose gear touchdown was at 5:32:12 p.m. and wheel stop was at 5:32:52 p.m. At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Discovery traveled 5,330,000 miles, landing on orbit 204. Mission elapsed time was 12 days, 20 hours, 44 minutes and 16 seconds. This is the 64th landing at KSC. Photo credit: NASA/Mike Kerley
Release Date 12/22/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery touches down on an illuminated Runway 15 at NASA Kennedy Space Center's Shuttle Landing Facility as the sun sets, concluding mission STS-116. Aboard are Commander Mark Polansky, Pilot William Oefelein, and Mission Specialists Robert Curbeam, Joan Higginbotham, Nicholas Patrick and Christer Fuglesang, who represents the European Space Agency, as well as Thomas Reiter, who is returning from a 6-month stay on the International Space Station. During the mission, three spacewalks attached the P5 integrated truss structure to the station, and completed the rewiring of the orbiting laboratory's power system. A fourth spacewalk retracted a stubborn solar array. Main gear touchdown was at 5:32 p.m. EST. Nose gear touchdown was at 5:32:12 p.m. and wheel stop was at 5:32:52 p.m. At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Discovery traveled 5,330,000 miles, landing on orbit 204. Mission elapsed time was 12 days, 20 hours, 44 minutes and 16 seconds. This is the 64th landing at KSC. Photo credit: NASA/Mike Kerley
Release Date 12/22/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery's drag chute unfurls upon landing on Runway 15 at NASA Kennedy Space Center's Shuttle Landing Facility as the sun sets on the shortest day of the year, concluding mission STS-116. In the background are the runway's Air Traffic Control Tower (far right) and the 525-foot-tall Vehicle Assembly Building. Aboard are Commander Mark Polansky, Pilot William Oefelein, and Mission Specialists Robert Curbeam, Joan Higginbotham, Nicholas Patrick and Christer Fuglesang, who represents the European Space Agency, as well as Thomas Reiter, who is returning from a 6-month stay on the International Space Station. During the mission, three spacewalks attached the P5 integrated truss structure to the station, and completed the rewiring of the orbiting laboratory's power system. A fourth spacewalk retracted a stubborn solar array. Main gear touchdown was at 5:32 p.m. EST. Nose gear touchdown was at 5:32:12 p.m. and wheel stop was at 5:32:52 p.m. At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Discovery traveled 5,330,000 miles, landing on orbit 204. Mission elapsed time was 12 days, 20 hours, 44 minutes and 16 seconds. This is the 64th landing at KSC. Photo credit: NASA/Tom Joseph
Release Date 12/22/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery nears touchdown on Runway 15 at NASA Kennedy Space Center's Shuttle Landing Facility as the sun sets on the shortest day of the year, concluding mission STS-116. Aboard are Commander Mark Polansky, Pilot William Oefelein, and Mission Specialists Robert Curbeam, Joan Higginbotham, Nicholas Patrick and Christer Fuglesang, who represents the European Space Agency, as well as Thomas Reiter, who is returning from a 6-month stay on the International Space Station. During the mission, three spacewalks attached the P5 integrated truss structure to the station, and completed the rewiring of the orbiting laboratory's power system. A fourth spacewalk retracted a stubborn solar array. Main gear touchdown was at 5:32 p.m. EST. Nose gear touchdown was at 5:32:12 p.m. and wheel stop was at 5:32:52 p.m. At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Discovery traveled 5,330,000 miles, landing on orbit 204. Mission elapsed time was 12 days, 20 hours, 44 minutes and 16 seconds. This is the 64th landing at KSC. Photo credit: NASA/Mike Kerley
Release Date 12/22/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery's drag chute unfurls upon landing on Runway 15 at NASA Kennedy Space Center's Shuttle Landing Facility as the sun sets on the shortest day of the year, concluding mission STS-116. In the background are the runway's Air Traffic Control Tower and the 525-foot-tall Vehicle Assembly Building (far right). Aboard are Commander Mark Polansky, Pilot William Oefelein, and Mission Specialists Robert Curbeam, Joan Higginbotham, Nicholas Patrick and Christer Fuglesang, who represents the European Space Agency, as well as Thomas Reiter, who is returning from a 6-month stay on the International Space Station. During the mission, three spacewalks attached the P5 integrated truss structure to the station, and completed the rewiring of the orbiting laboratory's power system. A fourth spacewalk retracted a stubborn solar array. Main gear touchdown was at 5:32 p.m. EST. Nose gear touchdown was at 5:32:12 p.m. and wheel stop was at 5:32:52 p.m. At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Discovery traveled 5,330,000 miles, landing on orbit 204. Mission elapsed time was 12 days, 20 hours, 44 minutes and 16 seconds. This is the 64th landing at KSC. Photo credit: NASA/Tom Joseph
Release Date 12/22/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- Space Shuttle Discovery's drag chute unfurls upon landing on Runway 15 at NASA Kennedy Space Center's Shuttle Landing Facility as the sun sets on the shortest day of the year, concluding mission STS-116. In the background are the runway's Air Traffic Control Tower and the 525-foot-tall Vehicle Assembly Building (far right). Aboard are Commander Mark Polansky, Pilot William Oefelein, and Mission Specialists Robert Curbeam, Joan Higginbotham, Nicholas Patrick and Christer Fuglesang, who represents the European Space Agency, as well as Thomas Reiter, who is returning from a 6-month stay on the International Space Station. During the mission, three spacewalks attached the P5 integrated truss structure to the station, and completed the rewiring of the orbiting laboratory's power system. A fourth spacewalk retracted a stubborn solar array. Main gear touchdown was at 5:32 p.m. EST. Nose gear touchdown was at 5:32:12 p.m. and wheel stop was at 5:32:52 p.m. At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Discovery traveled 5,330,000 miles, landing on orbit 204. Mission elapsed time was 12 days, 20 hours, 44 minutes and 16 seconds. This is the 64th landing at KSC. Photo credit: NASA/Tom Joseph
Release Date 12/22/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Silhouetted against the rising sun, Space Shuttle Atlantis rolls toward Launch Pad 39B. First motion out of the Vehicle Assembly Building was 1:05 a.m. The shuttle sits on top of the mobile launcher platform, which in turn rests on the crawler-transporter. The slow speed of the crawler results in a 6-hour trek to the pad approximately 4 miles away. Atlantis' launch window begins Aug. 27 for an 11-day mission to the International Space Station. The STS-115 crew of six astronauts will continue construction of the station and install their cargo, the Port 3/4 truss segment with its two large solar arrays. Photo credit: NASA/George Shelton
Release Date 08/02/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The sun radiates on Space Shuttle Atlantis as it heads for space on mission STS-115 to the International Space Station. Liftoff was on-time at 11:14:55 a.m. EDT. After several launch attempts were scrubbed due to weather and technical concerns, this launch was executed perfectly. Mission STS-115 is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. STS-115 is scheduled to last 11 days with a planned landing at KSC.
Release Date 09/09/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Flaming rockets propel Space Shuttle Atlantis into the sky, blocking the sun, for a rendezvous with the International Space Station on mission STS-115. Appearing below the main engine nozzles s are the blue mach diamonds signal the speed and force at which Atlantis roars into space. Liftoff was on-time at 11:14:55 a.m. EDT. After several launch attempts were scrubbed due to weather and technical concerns, this launch was executed perfectly. Mission STS-115 is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. STS-115 is scheduled to last 11 days with a planned landing at KSC
Release Date 09/09/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - After rollback of the rotating service structure on Launch Pad 39B, Space Shuttle Atlantis shines in the late afternoon sun. The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad and then is rolled away before liftoff. At right is the 300,000-gallon water tank that releases a deluge of water across the mobile launcher platform during liftoff to aid sound suppression. Atlantis is scheduled to launch Sept. 6 at 12:29 p.m. EDT on mission STS-115. During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned KSC landing at about 8:03 a.m. EDT on Sept. 17. Photo credit: NASA/Ken Thornsley
Release Date 09/05/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The late afternoon sun highlights Space Shuttle Atlantis after rollback of the rotating service structure. The RSS provides protected access to the orbiter for changeout and servicing of payloads at the pad and then is rolled away before liftoff. Seen above the golden external tank is the vent hood (known as the "beanie cap") at the end of the gaseous oxygen vent arm. Vapors are created as the liquid oxygen in the external tank boil off. The hood vents the gaseous oxygen vapors away from the space shuttle vehicle. Below it, extending from the fixed service structure, is the orbiter access arm with the White Room at the end. The White Room provides entry into the orbiter. Atlantis is scheduled to launch Sept. 6 at 12:29 p.m. EDT on mission STS-115. During the mission, Atlantis' astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment on the station. The girder-like truss includes a set of giant solar arrays, batteries and associated electronics and will provide one-fourth of the total power-generation capability for the completed station. This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th U.S. flight to the International Space Station. STS-115 is scheduled to last 11 days with a planned KSC landing at about 8:03 a.m. EDT on Sept. 17. Photo credit: NASA/Ken Thornsley
Release Date 09/05/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- European Space Agency astronaut Thomas Reiter, returning from a 6-month stay on the International Space Station, relaxes in the crew quarters at Kennedy Space Center. Reiter returned to Earth with the STS-116 crew aboard Space Shuttle Discovery. Landing took place on Runway 15 at NASA Kennedy Space Center's Shuttle Landing Facility as the sun set on the shortest day of the year. During the STS-116 mission, three spacewalks attached the P5 integrated truss structure to the station, and completed the rewiring of the orbiting laboratory's power system. A fourth spacewalk retracted a stubborn solar array. Main gear touchdown was at 5:32 p.m. EST. Nose gear touchdown was at 5:32:12 p.m. and wheel stop was at 5:32:52 p.m. At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Discovery traveled 5,330,000 miles, landing on orbit 204. Mission elapsed time was 12 days, 20 hours, 44 minutes and 16 seconds. This is the 64th landing at KSC. Photo credit: NASA/Kim Shiflett
Release Date 12/22/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- European Space Agency astronaut Thomas Reiter (seated), returning from a 6-month stay on the International Space Station, talks to colleagues in the crew quarters at Kennedy Space Center. Reiter returned to Earth with the STS-116 crew aboard Space Shuttle Discovery. Landing took place on Runway 15 at NASA Kennedy Space Center's Shuttle Landing Facility as the sun set on the shortest day of the year. During the STS-116 mission, three spacewalks attached the P5 integrated truss structure to the station, and completed the rewiring of the orbiting laboratory's power system. A fourth spacewalk retracted a stubborn solar array. Main gear touchdown was at 5:32 p.m. EST. Nose gear touchdown was at 5:32:12 p.m. and wheel stop was at 5:32:52 p.m. At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Discovery traveled 5,330,000 miles, landing on orbit 204. Mission elapsed time was 12 days, 20 hours, 44 minutes and 16 seconds. This is the 64th landing at KSC. Photo credit: NASA/Kim Shiflett
Release Date 12/22/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- European Space Agency astronaut Thomas Reiter, returning from a 6-month stay on the International Space Station, relaxes in the crew quarters at Kennedy Space Center. Reiter returned to Earth with the STS-116 crew aboard Space Shuttle Discovery. Landing took place on Runway 15 at NASA Kennedy Space Center's Shuttle Landing Facility as the sun set on the shortest day of the year. During the STS-116 mission, three spacewalks attached the P5 integrated truss structure to the station, and completed the rewiring of the orbiting laboratory's power system. A fourth spacewalk retracted a stubborn solar array. Main gear touchdown was at 5:32 p.m. EST. Nose gear touchdown was at 5:32:12 p.m. and wheel stop was at 5:32:52 p.m. At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Discovery traveled 5,330,000 miles, landing on orbit 204. Mission elapsed time was 12 days, 20 hours, 44 minutes and 16 seconds. This is the 64th landing at KSC. Photo credit: NASA/Kim Shiflett
Release Date 12/22/2006
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -- European Space Agency astronaut Thomas Reiter (seated), returning from a 6-month stay on the International Space Station, visits with colleagues in the crew quarters at Kennedy Space Center. Reiter returned to Earth with the STS-116 crew aboard Space Shuttle Discovery. Landing took place on Runway 15 at NASA Kennedy Space Center's Shuttle Landing Facility as the sun set on the shortest day of the year. During the STS-116 mission, three spacewalks attached the P5 integrated truss structure to the station, and completed the rewiring of the orbiting laboratory's power system. A fourth spacewalk retracted a stubborn solar array. Main gear touchdown was at 5:32 p.m. EST. Nose gear touchdown was at 5:32:12 p.m. and wheel stop was at 5:32:52 p.m. At touchdown -- nominally about 2,500 ft. beyond the runway threshold -- the orbiter is traveling at a speed ranging from 213 to 226 mph. Discovery traveled 5,330,000 miles, landing on orbit 204. Mission elapsed time was 12 days, 20 hours, 44 minutes and 16 seconds. This is the 64th landing at KSC. Photo credit: NASA/Kim Shiflett
Release Date 12/22/2006
1-31 of 31