|
|
Browse All
:
Space Shuttle Orbiter and International Space Station (ISS) of Johnson Space Center (JSC) from 2007
|
Printer Friendly |
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
STS-117 Shuttle Mission Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- Extravehicular Activity (EVA) suits packed inside containers arrive at the Space Station Processing Facility from Johnson Space Center in Texas. The suits will be used by STS-117 crew members to perform several spacewalks during the mission. The mission payload aboard Space Shuttle Atlantis is the S3/S4 integrated truss structure, along with a third set of solar arrays and batteries. The crew of six astronauts will install the truss to continue assembly of the International Space Station. Photo credit: NASA/George Shelton. |
| Release Date |
02/22/2007 |
|
KENNEDY SPACE CENTER, Fla. -
| Description |
KENNEDY SPACE CENTER, Fla. -- Near Launch Pad 39A, STS-118 Mission Specialist Dave Williams gets pointers from a Johnson Space Center crew photo trainer on using the camera and telephoto lens to photograph the external tank/solid rocket booster stack on Space Shuttle Endeavour. Williams and other mission specialists will take photos of the tank after separation from Endeavour after launch. The STS-118 crew is at Kennedy to take part in Terminal Countdown Demonstration Test activities, including M-113 training, payload familiarization, emergency egress training at the pad and a simulated launch countdown. The payload aboard Space Shuttle Endeavour includes the S5 truss, a SPACEHAB module and external stowage platform 3. The STS-118 mission is the 22nd flight to the International Space Station and is targeted for launch on Aug. 7. NASA/George Shelton |
| Release Date |
07/17/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- After their arrival at KSC, STS-117 crew members take part in a payload bay walkdown on Launch Pad 39A to look at the cargo in Space Shuttle Atlantis. The payload includes the S3/S4 integrated truss structure for the International Space Station. The payload includes the S3/S4 integrated truss structure for the International Space Station. STS-117 is scheduled to launch at 7:38 p.m. June 8. During the 11-day mission and three spacewalks, the crew will work with flight controllers at NASA's Johnson Space Center in Houston to install the 17-ton segment on the station's girder-like truss and deploy the set of solar arrays, S3/S4. The mission will increase the space station's power capability in preparation for the arrival of new science modules from the European and Japanese space agencies. Photo credit: NASA/Kim Shiflett |
| Release Date |
06/04/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- After their arrival at KSC, STS-117 crew members take part in a payload bay walkdown on Launch Pad 39A to look at the cargo in Space Shuttle Atlantis. The payload includes the S3/S4 integrated truss structure for the International Space Station. STS-117 is scheduled to launch at 7:38 p.m. June 8. During the 11-day mission and three spacewalks, the crew will work with flight controllers at NASA's Johnson Space Center in Houston to install the 17-ton segment on the station's girder-like truss and deploy the set of solar arrays, S3/S4. The mission will increase the space station's power capability in preparation for the arrival of new science modules from the European and Japanese space agencies. Photo credit: NASA/Kim Shiflett |
| Release Date |
06/04/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- After their arrival at KSC, STS-117 crew members take part in a payload bay walkdown on Launch Pad 39A to look at the cargo in Space Shuttle Atlantis. Seen here are Mission Specialists Patrick Forrester (left) and James Reilly. The payload includes the S3/S4 integrated truss structure for the International Space Station. STS-117 is scheduled to launch at 7:38 p.m. June 8. During the 11-day mission and three spacewalks, the crew will work with flight controllers at NASA's Johnson Space Center in Houston to install the 17-ton segment on the station's girder-like truss and deploy the set of solar arrays, S3/S4. The mission will increase the space station's power capability in preparation for the arrival of new science modules from the European and Japanese space agencies. Photo credit: NASA/Kim Shiflett |
| Release Date |
06/04/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- After their arrival at KSC, STS-117 crew members take part in a payload bay walkdown on Launch Pad 39A to look at the cargo in Space Shuttle Atlantis. The payload includes the S3/S4 integrated truss structure for the International Space Station. STS-117 is scheduled to launch at 7:38 p.m. June 8. During the 11-day mission and three spacewalks, the crew will work with flight controllers at NASA's Johnson Space Center in Houston to install the 17-ton segment on the station's girder-like truss and deploy the set of solar arrays, S3/S4. The mission will increase the space station's power capability in preparation for the arrival of new science modules from the European and Japanese space agencies. Photo credit: NASA/Kim Shiflett |
| Release Date |
06/04/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- After their arrival at KSC, STS-117 crew members take part in a payload bay walkdown on Launch Pad 39A to look at the cargo in Space Shuttle Atlantis. Seen here are Mission Specialists Patrick Forrester (left) and James Reilly. The payload includes the S3/S4 integrated truss structure for the International Space Station. The payload includes the S3/S4 integrated truss structure for the International Space Station. STS-117 is scheduled to launch at 7:38 p.m. June 8. During the 11-day mission and three spacewalks, the crew will work with flight controllers at NASA's Johnson Space Center in Houston to install the 17-ton segment on the station's girder-like truss and deploy the set of solar arrays, S3/S4. The mission will increase the space station's power capability in preparation for the arrival of new science modules from the European and Japanese space agencies. Photo credit: NASA/Kim Shiflett |
| Release Date |
06/04/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- After their arrival at KSC, STS-117 crew members take part in a payload bay walkdown on Launch Pad 39A to look at the cargo in Space Shuttle Atlantis. In the bucket are Mission Specialists Patrick Forrester (with camera) and Steven Swanson (far right). The payload includes the S3/S4 integrated truss structure for the International Space Station. STS-117 is scheduled to launch at 7:38 p.m. June 8. During the 11-day mission and three spacewalks, the crew will work with flight controllers at NASA's Johnson Space Center in Houston to install the 17-ton segment on the station's girder-like truss and deploy the set of solar arrays, S3/S4. The mission will increase the space station's power capability in preparation for the arrival of new science modules from the European and Japanese space agencies. Photo credit: NASA/Kim Shiflett |
| Release Date |
06/04/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- After their arrival at KSC, STS-117 crew members take part in a payload bay walkdown on Launch Pad 39A to look at the cargo in Space Shuttle Atlantis. The payload includes the S3/S4 integrated truss structure for the International Space Station. STS-117 is scheduled to launch at 7:38 p.m. June 8. During the 11-day mission and three spacewalks, the crew will work with flight controllers at NASA's Johnson Space Center in Houston to install the 17-ton segment on the station's girder-like truss and deploy the set of solar arrays, S3/S4. The mission will increase the space station's power capability in preparation for the arrival of new science modules from the European and Japanese space agencies. Photo credit: NASA/Kim Shiflett |
| Release Date |
06/04/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- After their arrival at KSC, STS-117 crew members take part in a payload bay walkdown on Launch Pad 39A to look at the cargo in Space Shuttle Atlantis. Seen here is Mission Specialist Patrick Forrester. The payload includes the S3/S4 integrated truss structure for the International Space Station. STS-117 is scheduled to launch at 7:38 p.m. June 8. During the 11-day mission and three spacewalks, the crew will work with flight controllers at NASA's Johnson Space Center in Houston to install the 17-ton segment on the station's girder-like truss and deploy the set of solar arrays, S3/S4. The mission will increase the space station's power capability in preparation for the arrival of new science modules from the European and Japanese space agencies. Photo credit: NASA/Kim Shiflett |
| Release Date |
06/04/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- The crew members of space shuttle mission STS-120 prepare for their return to NASA's Johnson Space Center in Houston following three days of terminal countdown demonstration test, or TCDT, activities. At Kennedy Space Center's Shuttle Landing Facility, Mission Specialist Scott Parazynski is strapped into his T-38 jet aircraft prior to takeoff. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. The STS-120 mission will deliver the U.S. Node 2 module, named Harmony, aboard space shuttle Discovery to the International Space Station on a 14-day mission. Discovery's launch is targeted for Oct. 23 at 11:38 a.m. EDT. Photo credit: NASA/Kim Shiflett |
| Release Date |
10/10/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- The crew members of space shuttle mission STS-120 prepare for their return to NASA's Johnson Space Center in Houston following three days of terminal countdown demonstration test, or TCDT, activities. At Kennedy Space Center's Shuttle Landing Facility, Pilot George Zamka, at left, and Mission Specialist Paolo Nespoli are packed and ready to board their aircraft. Nespoli is representing the European Space Agency on STS-120. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. The STS-120 mission will deliver the U.S. Node 2 module, named Harmony, aboard space shuttle Discovery to the International Space Station on a 14-day mission. Discovery's launch is targeted for Oct. 23 at 11:38 a.m. EDT. Photo credit: NASA/Kim Shiflett |
| Release Date |
10/10/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- The crew members of space shuttle mission STS-120 prepare for their return to NASA's Johnson Space Center in Houston following three days of terminal countdown demonstration test, or TCDT, activities. At Kennedy Space Center's Shuttle Landing Facility, Pilot George Zamka, in front, and Mission Specialist Paolo Nespoli secure themselves in a T-38 jet aircraft for takeoff. Nespoli is representing the European Space Agency on STS-120. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. The STS-120 mission will deliver the U.S. Node 2 module, named Harmony, aboard space shuttle Discovery to the International Space Station on a 14-day mission. Discovery's launch is targeted for Oct. 23 at 11:38 a.m. EDT. Photo credit: NASA/Kim Shiflett |
| Release Date |
10/10/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- The crew members of space shuttle mission STS-120 prepare for their return to NASA's Johnson Space Center in Houston following three days of terminal countdown demonstration test, or TCDT, activities. At Kennedy Space Center's Shuttle Landing Facility, Commander Pam Melroy, in front, and Mission Specialist Stephanie Wilson complete the final tasks before takeoff in a T-38 jet aircraft. Melroy is the second woman to command a shuttle mission. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. The STS-120 mission will deliver the U.S. Node 2 module, named Harmony, aboard space shuttle Discovery to the International Space Station on a 14-day mission. Discovery's launch is targeted for Oct. 23 at 11:38 a.m. EDT. Photo credit: NASA/Kim Shiflett |
| Release Date |
10/10/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- The crew members of space shuttle mission STS-120 prepare for their return to NASA's Johnson Space Center in Houston following three days of terminal countdown demonstration test, or TCDT, activities. At Kennedy Space Center's Shuttle Landing Facility, Commander Pam Melroy, in front, and Mission Specialist Stephanie Wilson secure themselves in a T-38 jet aircraft for takeoff. Melroy is the second woman to command a shuttle mission. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. The STS-120 mission will deliver the U.S. Node 2 module, named Harmony, aboard space shuttle Discovery to the International Space Station on a 14-day mission. Discovery's launch is targeted for Oct. 23 at 11:38 a.m. EDT. Photo credit: NASA/Kim Shiflett |
| Release Date |
10/10/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- The crew members of space shuttle mission STS-120 prepare for their return to NASA's Johnson Space Center in Houston following three days of terminal countdown demonstration test, or TCDT, activities. All seven crew members are departing from Kennedy Space Center's Shuttle Landing Facility aboard two-passenger T-38 jet aircraft. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. The STS-120 mission will deliver the U.S. Node 2 module, named Harmony, aboard space shuttle Discovery to the International Space Station on a 14-day mission. Discovery's launch is targeted for Oct. 23 at 11:38 a.m. EDT. Photo credit: NASA/Kim Shiflett |
| Release Date |
10/10/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- The crew members of space shuttle mission STS-120 prepare for their return to NASA's Johnson Space Center in Houston following three days of terminal countdown demonstration test, or TCDT, activities. At Kennedy Space Center's Shuttle Landing Facility, Commander Pam Melroy checks the readiness of her T-38 jet aircraft before takeoff. Melroy is the second woman to command a shuttle mission. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. The STS-120 mission will deliver the U.S. Node 2 module, named Harmony, aboard space shuttle Discovery to the International Space Station on a 14-day mission. Discovery's launch is targeted for Oct. 23 at 11:38 a.m. EDT. Photo credit: NASA/Kim Shiflett |
| Release Date |
10/10/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- The crew members of space shuttle mission STS-120 prepare for their return to NASA's Johnson Space Center in Houston following three days of terminal countdown demonstration test, or TCDT, activities. At Kennedy Space Center's Shuttle Landing Facility, Mission Specialist Stephanie Wilson, at left, and Commander Pam Melroy are packed and ready to board their aircraft. Melroy is the second woman to command a shuttle mission. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. The STS-120 mission will deliver the U.S. Node 2 module, named Harmony, aboard space shuttle Discovery to the International Space Station on a 14-day mission. Discovery's launch is targeted for Oct. 23 at 11:38 a.m. EDT. Photo credit: NASA/Kim Shiflett |
| Release Date |
10/10/2007 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- The crew members of space shuttle mission STS-120 prepare for their return to NASA's Johnson Space Center in Houston following three days of terminal countdown demonstration test, or TCDT, activities. At Kennedy Space Center's Shuttle Landing Facility, Mission Specialist Doug Wheelock prepares to board his T-38 jet aircraft. The TCDT provides astronauts and ground crews with equipment familiarization, emergency egress training and a simulated launch countdown. The STS-120 mission will deliver the U.S. Node 2 module, named Harmony, aboard space shuttle Discovery to the International Space Station on a 14-day mission. Discovery's launch is targeted for Oct. 23 at 11:38 a.m. EDT. Photo credit: NASA/Kim Shiflett |
| Release Date |
10/10/2007 |
|
|