Browse All : Space Shuttle Orbiter and International Space Station (ISS) and Opportunity of Florida

Printer Friendly
1 2 3 4 5
1-50 of 215
     
     
The Return of Buzz Lightyear
Disney's space ranger Buzz L …
9/17/09
Description Disney's space ranger Buzz Lightyear returned from space on Sept. 11, aboard space shuttle Discovery's STS-128 mission after 15 months aboard the International Space Station. His time on the orbiting laboratory will celebrated in a ticker-tape parade together with his space station crewmates and former Apollo 11 moonwalker Buzz Aldrin on Oct. 2, at Walt Disney World in Florida. While on the space station, Buzz supported NASA's education outreach program-- STEM (Science, Technology, Engineering and Mathematics)--by creating a series of fun educational online outreach programs. Following his return, Disney is partnering with NASA to create a new online educational game and an online mission patch competition for school kids across America. NASA will fly the winning patch in space. In addition, NASA plans to announce on Oct. 2, 2009, the details of a new exciting educational competition that will give students the opportunity to design an experiment for the astronauts on the space station. Image Credit: NASA
Date 9/17/09
Space Shuttle STS-94 Columbi …
Name of Image Space Shuttle STS-94 Columbia launch
Date of Image 1997-07-01
Full Description The Space Shuttle Columbia (STS-94) soared from Launch Pad 39A begirning its 16-day Microgravity Science Laboratory -1 (MSL-1) mission. The launch window was opened 47 minutes earlier than the originally scheduled time to improve the opportunity to lift off before Florida summer rain showers reached the space center. During the space flight, the MSL-1 was used to test some of the hardware, facilities and procedures that were planned for use on the International Space Station which were managed by scientists and engineers from the Marshall Space Flight Center, while the flight crew conducted combustion, protein crystal growth and materials processing experiments. Also onboard was the Hitchhiker Cryogenic Flexible Diode (CRYOFD) experiment payload, which was attached to the right side of Columbia's payload bay. These payloads had previously flown on the STS-83 mission in April, which was cut short after nearly four days because of indications of a faulty fuel cell. STS-94 was a reflight of that mission.
Space Shuttle Columbia Launc …
Name of Image Space Shuttle Columbia Launch
Date of Image 1997-07-01
Full Description The Space Shuttle Columbia (STS-94) soared from Launch Pad 39A begirning its 16-day Microgravity Science Laboratory -1 (MSL-1) mission. The launch window was opened 47 minutes earlier than the originally scheduled time to improve the opportunity to lift off before Florida summer rain showers reached the space center. During the space flight, the MSL-1 was used to test some of the hardware, facilities and procedures that were planned for use on the International Space Station which were managed by scientists and engineers from the Marshall Space Flight Center, while the flight crew conducted combustion, protein crystal growth and materials processing experiments. Also onboard was the Hitchhiker Cryogenic Flexible Diode (CRYOFD) experiment payload, which was attached to the right side of Columbia's payload bay. These payloads had previously flown on the STS-83 mission in April, which was cut short after nearly four days because of indications of a faulty fuel cell. STS-94 was a reflight of that mission.
Nobel laureate Professor Sam …
Description Nobel laureate Professor Samuel C. C. Ting of the Massachusetts Institute of Technology pauses for a photo in the Space Station Processing Facility. Dr. Ting is directing an experiment, an international collaboration of some 37 universities and laboratories, using a state-of-the-art particle physics detector called the Alpha Magnetic Spectrometer (AMS), which will fly on a future launch to the International Space Station. Using the unique environment of space, the AMS will study the properties and origin of cosmic particles and nuclei including antimatter and dark matter. AMS flew initially as a Space Shuttle payload on the June 1998 mission STS-91 that provided the investigating team with data on background sources and verified the detector?s performance under actual space flight conditions. The detector?s second space flight is scheduled to be launched on mission UF-4 October 2003 for installation on the Space Station as an attached payload. Current plans call for operating the detector for three years before it is returned to Earth on the Shuttle. Using the Space Station offers the science team the opportunity to conduct the long-duration research above the Earth?s atmosphere necessary to collect sufficient data required to accomplish the science objectives
Release Date 12/21/2000
Nobel laureate Professor Sam …
Description Nobel laureate Professor Samuel C. C. Ting of the Massachusetts Institute of Technology pauses for a photo in the Space Station Processing Facility. Dr. Ting is directing an experiment, an international collaboration of some 37 universities and laboratories, using a state-of-the-art particle physics detector called the Alpha Magnetic Spectrometer (AMS), which will fly on a future launch to the International Space Station. Using the unique environment of space, the AMS will study the properties and origin of cosmic particles and nuclei including antimatter and dark matter. AMS flew initially as a Space Shuttle payload on the June 1998 mission STS-91 that provided the investigating team with data on background sources and verified the detector?s performance under actual space flight conditions. The detector?s second space flight is scheduled to be launched on mission UF-4 October 2003 for installation on the Space Station as an attached payload. Current plans call for operating the detector for three years before it is returned to Earth on the Shuttle. Using the Space Station offers the science team the opportunity to conduct the long-duration research above the Earth?s atmosphere necessary to collect sufficient data required to accomplish the science objectives
Release Date 12/21/2000
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility (SSPF), Jim Pope (background), Logistics Flight 1 (LF1) mission manager, International Space Station and Payload Processing, discusses the Multi-Purpose Logistics Modules (MPLMs) with members of the media. MPLMs are pressurized modules that serve as the International Space Station's "moving vans," carrying laboratory racks filled with equipment, experiments and supplies to and from the Station aboard the Space Shuttle. Reporters were invited to commemorate the fifth anniversary of the launch of the first element of the Station with a tour of the facility and had the opportunity to see Space Station hardware that is being processed for deployment once the Space Shuttles return to flight. NASA and Boeing mission managers were on hand to talk about the various hardware elements currently being processed for flight.
Release Date 12/03/2003
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - After arrival at NASA?s Kennedy Space Center, the STS-114 crew members pause on the runway while Commander Eileen Collins makes a brief statement to the media. Standing behind her, from left, are Pilot James Kelly and Mission Specialists Wendy Lawrence, Stephen Robinson, Charles Camarda, and Andrew Thomas. The crew is at KSC to take part in the Terminal Countdown Demonstration Test (TCDT) over the next three days. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/01/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - After arrival at NASA?s Kennedy Space Center, the STS-114 crew members are greeted by KSC officials. Seen from left are Deputy Director Woodrow Whitlow Jr., Commander Eileen Collins, Mission Specialists Charles Camarda (behind Collins) and Andrew Thomas, astronaut Jerry Ross, who is chief of the Vehicle Integration Test (VIT) office, VIT Lead for STS-114 Robert Hanley, Shuttle Launch Director Mike Leinbach and Center Director Jim Kennedy. Crew members are taking part in the Terminal Countdown Demonstration Test (TCDT) over the next three days. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/01/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - After arriving at Kennedy Space Center?s Shuttle Landing Facility, STS-114 Mission Specialist Soichi Noguchi talks to the media. Noguchi is with the Japan Aerospace Exploration Agency. He and other crew members are taking part in the Terminal Countdown Demonstration Test (TCDT) over the next three days. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. This is Noguchi?s first space flight. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/01/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - After arriving at Kennedy Space Center?s Shuttle Landing Facility, STS-114 Mission Specialist Soichi Noguchi talks to the media. Noguchi is with the Japan Aerospace Exploration Agency. He and other crew members are taking part in the Terminal Countdown Demonstration Test (TCDT) over the next three days. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. This is Noguchi?s first space flight. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/01/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - At Kennedy Space Center?s Shuttle Landing Facility, Center Director Jim Kennedy talks with STS-114 Commander Eileen Collins after her arrival. She and the rest of the crew are at KSC to take part in the Terminal Countdown Demonstration Test (TCDT) over the next three days. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. This is Collins? fourth space flight and second as commander. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/01/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialist Soichi Noguchi arrives at NASA?s Kennedy Space Center aboard a T-38 jet training aircraft. Noguchi is with the Japan Aerospace Exploration Agency. He and other crew members are taking part in the Terminal Countdown Demonstration Test (TCDT) over the next three days. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. This is Noguchi?s first space flight. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/01/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - At Kennedy Space Center?s Shuttle Landing Facility, STS-114 Mission Specialist Charles Camarda (left) is greeted by Center Director Jim Kennedy. Camarda and other crew members are taking part in the Terminal Countdown Demonstration Test (TCDT) over the next three days. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. This is Camarda?s first space flight. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/01/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - At Kennedy Space Center?s Shuttle Landing Facility, STS-114 Pilot James Kelly (left) is greeted by Shuttle Launch Director Mike Leinbach. Kelly and other crew members are taking part in the Terminal Countdown Demonstration Test (TCDT) over the next three days. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. This is Kelly?s second space flight. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/01/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - After arrival at NASA?s Kennedy Space Center, the STS-114 crew members pause on the runway while Commander Eileen Collins makes a brief statement to the media. The crew is at KSC to take part in the Terminal Countdown Demonstration Test (TCDT) over the next three days. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/01/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialist Andrew Thomas arrives at NASA?s Kennedy Space Center aboard a T-38 jet training aircraft. He and other crew members are taking part in the Terminal Countdown Demonstration Test (TCDT) over the next three days. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. This is Thomas? fourth space flight. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/01/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - After arrival at NASA?s Kennedy Space Center, the STS-114 crew members pause on the runway while Commander Eileen Collins makes a brief statement to the media. Seen here are Pilot James Kelly and Mission Specialists Wendy Lawrence and Stephen Robinson. The crew is at KSC to take part in the Terminal Countdown Demonstration Test (TCDT) over the next three days. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/01/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - During Terminal Countdown Demonstration Test (TCDT) activities at NASA?s Kennedy Space Center, the STS-114 crew takes part in training on an M-113, an armored personnel carrier that is used for speedy departure from the launch pad in an emergency. Seated in the M-113, left to right, are Commander Eileen Collins, Mission Specialist Stephen Robinson, Capt. George Hoggard, astronaut rescue team leader, Mission Specialists Andrew Thomas, Soichi Noguchi and Charles Camarda, and Pilot James Kelly. Noguchi is with the Japan Aerospace Exploration Agency. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/02/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - During Terminal Countdown Demonstration Test (TCDT) activities at NASA?s Kennedy Space Center, STS-114 Commander Eileen Collins takes her turn at driving an M-113, an armored personnel carrier that is used for speedy departure from the launch pad in an emergency. Standing behind her is Capt. George Hoggard, who is astronaut rescue team leader. On the left is KSC videographer Glen Benson. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/02/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - During Terminal Countdown Demonstration Test (TCDT) activities at NASA?s Kennedy Space Center, STS-114 Pilot James Kelly is ready to practice driving an M-113, an armored personnel carrier that is used for speedy departure from the launch pad in an emergency. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/02/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - During Terminal Countdown Demonstration Test (TCDT) activities at NASA?s Kennedy Space Center, STS-114 Mission Specialist Stephen Robinson is getting ready to practice driving an M-113, an armored personnel carrier that is used for speedy departure from the launch pad in an emergency. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/02/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - During Terminal Countdown Demonstration Test (TCDT) activities at NASA?s Kennedy Space Center, the STS-114 Mission Specialist Wendy Lawrence is getting ready to practice driving an M-113, an armored personnel carrier that is used for speedy departure from the launch pad in an emergency. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/02/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - During Terminal Countdown Demonstration Test (TCDT) activities at NASA?s Kennedy Space Center, STS-114 Commander Eileen Collins gets ready to practice driving an M-113, an armored personnel carrier that is used for speedy departure from the launch pad in an emergency. Behind her is Capt. George Hoggard, who is astronaut rescue team leader. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/02/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - During Terminal Countdown Demonstration Test (TCDT) activities at NASA?s Kennedy Space Center, STS-114 Mission Specialist Charles Camarda is getting ready to practice driving an M-113, an armored personnel carrier that is used for speedy departure from the launch pad in an emergency. Behind him are Mission Specialist Stephen Robinson and Capt. George Hoggard, who is astronaut rescue team leader, and, at right, Commander Eileen Collins. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/02/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - During Terminal Countdown Demonstration Test (TCDT) activities at NASA?s Kennedy Space Center, STS-114 Mission Specialist Andrew Thomas is ready to practice driving an M-113, an armored personnel carrier that is used for speedy departure from the launch pad in an emergency. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/02/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - During Terminal Countdown Demonstration Test (TCDT) activities at NASA?s Kennedy Space Center, STS-114 Mission Specialist Stephen Robinson (right) practices driving an M-113, an armored personnel carrier that is used for speedy departure from the launch pad in an emergency. At left is Capt. George Hoggard, who is astronaut rescue team leader. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/02/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - During Terminal Countdown Demonstration Test (TCDT) activities at NASA?s Kennedy Space Center, the STS-114 crew pauses during M-113 training at the launch pad. From left are Mission Specialist Andrew Thomas, Commander Eileen Collins, Mission Specialists Charles Camarda, Soichi Noguchi, Wendy Lawrence and Stephen Robinson, and Pilot James Kelly. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/02/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - During Terminal Countdown Demonstration Test (TCDT) activities at NASA?s Kennedy Space Center, STS-114 Mission Specialist Soichi Noguchi is ready to practice driving an M-113, an armored personnel carrier that is used for speedy departure from the launch pad in an emergency. Behind him at left is Capt. George Hoggard, who is astronaut rescue team leader. Noguchi is with the Japan Aerospace Exploration Agency.The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/02/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - During Terminal Countdown Demonstration Test (TCDT) activities at NASA?s Kennedy Space Center, STS-114 Mission Specialist Soichi Noguchi drives an M-113, an armored personnel carrier that is used for speedy departure from the launch pad in an emergency. Behind him at left is Capt. George Hoggard, who is astronaut rescue team leader. Noguchi is with the Japan Aerospace Exploration Agency. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/02/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - STS-114 Commander Eileen Collins leads the way as the next Space Shuttle crew does a practice walkout from the Operations and Checkout Building en route to Launch Pad 39B for a mock launch countdown culminating in a simulated main engine cutoff. In the left row, from front, are Pilot James Kelly and Mission Specialists Wendy Lawrence, Charles Camarda, and Andrew Thomas. In the right row, from front, are Collins and Mission Specialists Soichi Noguchi and Stephen Robinson. Noguchi is with the Japan Aerospace Exploration Agency. The dress rehearsal is part of Terminal Countdown Demonstration Test (TCDT) activities held prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - A suit technician helps STS-114 Mission Specialist Stephen Robinson suit up in the Operations and Checkout Building for the trip to Launch Pad 39B for a mock launch countdown culminating in a simulated main engine cutoff. The dress rehearsal is part of Terminal Countdown Demonstration Test (TCDT) activities held prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -STS-114 Mission Specialist Andrew Thomas suits up in the Operations and Checkout Building for the trip to Launch Pad 39B for a mock launch countdown culminating in a simulated main engine cutoff. The dress rehearsal is part of Terminal Countdown Demonstration Test (TCDT) activities held prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Outside the Operations and Checkout Building, STS-114 Commander Eileen Collins leads the way to the Astrovan that will transport the crew to Launch Pad 39B for a mock launch countdown culminating in a simulated main engine cutoff. In the left row, from front, are Pilot James Kelly and Mission Specialists Wendy Lawrence, Charles Camarda, and Andrew Thomas. In the right row, from front, are Collins and Mission Specialists Soichi Noguchi and Stephen Robinson. Noguchi is with the Japan Aerospace Exploration Agency. The dress rehearsal is part of Terminal Countdown Demonstration Test (TCDT) activities held prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - A suit technician helps STS-114 Pilot James Kelly suit up in the Operations and Checkout Building for the trip to Launch Pad 39B for a mock launch countdown culminating in a simulated main engine cutoff. The dress rehearsal is part of Terminal Countdown Demonstration Test (TCDT) activities held prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-114 crew partakes of the traditional breakfast in the crew quarters at the Operations and Checkout (O&C) Building prior to suit-up for the trip to Launch Pad 39B for a mock launch countdown culminating in a simulated main engine cutoff. Seated, from left, are Mission Specialist Wendy Lawrence, Pilot James Kelly, Mission Specialist Soichi Noguchi, Commander Eileen Collins, and Mission Specialists Andrew Thomas, Stephen Robinson, and Charles Camarda. Noguchi is with the Japan Aerospace Exploration Agency. The dress rehearsal is part of Terminal Countdown Demonstration Test (TCDT) activities held prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - In the White Room on Launch Pad 39B, STS-114 Mission Specialist Stephen Robinson has completed adjustments to his launch suit with the help of the Closeout Crew around him. He will be entering the hatch to Space Shuttle Discovery, behind him. The crew is taking part in a full dress rehearsal for launch, including countdown and culminating in main engine cutoff. The rehearsal is the final part of Terminal Countdown Demonstration Test (TCDT) activities that the crew has been involved in for three days. TCDT provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - With a member of the Closeout Crew following behind, STS-114 Mission Specialist Soichi Noguchi heads for the White Room on Launch Pad 39B, where he will complete adjustments to his launch suit before entering Space Shuttle Discovery. Noguchi is with the Japan Aerospace Exploration Agency. The crew is taking part in a full dress rehearsal for launch, including countdown and culminating in main engine cutoff. The rehearsal is the final part of Terminal Countdown Demonstration Test (TCDT) activities that the crew has been involved in for three days. TCDT provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -STS-114 Commander Eileen Collins suits up in the Operations and Checkout Building for the trip to Launch Pad 39B for a mock launch countdown culminating in a simulated main engine cutoff. The dress rehearsal is part of Terminal Countdown Demonstration Test (TCDT) activities held prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - STS-114 Mission Specialist Soichi Noguchi holds the mission patch that will be attached to Space Shuttle Discovery for flight. Noguchi is with the Japan Aerospace Exploration Agency. The crew is taking part in a full dress rehearsal for launch, including countdown and culminating in main engine cutoff. The rehearsal is the final part of Terminal Countdown Demonstration Test (TCDT) activities that the crew has been involved in for three days. TCDT provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - With the Closeout Crew looking on in the White Room on Launch Pad 39B, STS-114 Pilot James Kelly makes adjustments to his launch suit before entering Space Shuttle Discovery. The crew is taking part in a full dress rehearsal for launch, including countdown and culminating in main engine cutoff. The rehearsal is the final part of Terminal Countdown Demonstration Test (TCDT) activities that the crew has been involved in for three days. TCDT provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -STS-114 Mission Specialist Andrew Thomas suits up in the Operations and Checkout Building for the trip to Launch Pad 39B for a mock launch countdown culminating in a simulated main engine cutoff. The dress rehearsal is part of Terminal Countdown Demonstration Test (TCDT) activities held prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - A suit technician helps STS-114 Commander Eileen Collins with a boot as she suits up in the Operations and Checkout Building for the trip to Launch Pad 39B for a mock launch countdown culminating in a simulated main engine cutoff. The dress rehearsal is part of Terminal Countdown Demonstration Test (TCDT) activities held prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -STS-114 Mission Specialist Charles Camarda suits up in the Operations and Checkout Building for the trip to Launch Pad 39-B for a mock launch countdown culminating in a simulated main engine cutoff. The dress rehearsal is part of Terminal Countdown Demonstration Test (TCDT) activities held prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -STS-114 Mission Specialist Wendy Lawrence suits up in the Operations and Checkout Building for the trip to Launch Pad 39B for a mock launch countdown culminating in a simulated main engine cutoff. The dress rehearsal is part of Terminal Countdown Demonstration Test (TCDT) activities held prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - STS-114 crew members take part in a mock countdown as pre-launch training included in Terminal Countdown Demonstration Test (TCDT) activities. Seen here in their seats in the mid-deck of Space Shuttle Discovery are (left to right), Mission Specialists Charles Camarda, Wendy Lawrence and Andrew Thomas. TCDT provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - With the help of the Closeout Crew in the White Room on Launch Pad 39B, STS-114 Commander Eileen Collins adjusts her launch suit before entering Space Shuttle Discovery. The crew is taking part in a full dress rehearsal for launch, including countdown and culminating in main engine cutoff. The rehearsal is the final part of Terminal Countdown Demonstration Test (TCDT) activities that the crew has been involved in for three days. TCDT provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - In the White Room on Launch Pad 39B, STS-114 Mission Specialist Wendy Lawrence makes a final adjustment on her launch suit before entering the hatch on Space Shuttle Discovery, behind her. The crew is taking part in a full dress rehearsal for launch, including countdown and culminating in main engine cutoff. The rehearsal is the final part of Terminal Countdown Demonstration Test (TCDT) activities that the crew has been involved in for three days. TCDT provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - With the Closeout Crew looking on in the White Room on Launch Pad 39B, STS-114 Mission Specialist Andrew Thomas has donned his launch suit before entering Space Shuttle Discovery. The crew is taking part in a full dress rehearsal for launch, including countdown and culminating in main engine cutoff. The rehearsal is the final part of Terminal Countdown Demonstration Test (TCDT) activities that the crew has been involved in for three days. TCDT provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. -STS-114 Mission Specialist Stephen Robinson suits up in the Operations and Checkout Building for the trip to Launch Pad 39B for a mock launch countdown culminating in a simulated main engine cutoff. The dress rehearsal is part of Terminal Countdown Demonstration Test (TCDT) activities held prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The STS-114 crew partakes of the traditional breakfast in the crew quarters at the Operations and Checkout (O&C) Building prior to suit-up for the trip to Launch Pad 39B for a mock launch countdown culminating in a simulated main engine cutoff. Seated, from left, are Mission Specialist Wendy Lawrence, Pilot James Kelly, Mission Specialist Soichi Noguchi, Commander Eileen Collins, and Mission Specialists Andrew Thomas, Stephen Robinson, and Charles Camarda. Noguchi is with the Japan Aerospace Exploration Agency. The dress rehearsal is part of Terminal Countdown Demonstration Test (TCDT) activities held prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in various simulated countdown activities, including equipment familiarization and emergency egress training. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.
Release Date 05/04/2005
1 2 3 4 5
1-50 of 215