|
|
Getting Ready
The Ares I-X rocket stands t
10/2/09
| Description |
The Ares I-X rocket stands tall inside the massive Vehicle Assembly Building's High Bay 3 at NASA's Kennedy Space Center in Florida. Part of the Constellation Program, the Ares I-X is the test vehicle for the Ares I, which is the essential core of a space transportation system that eventually will carry crewed missions back to the moon, on to Mars and out into the solar system. Image credit: NASA/Kim Shiflett Sept. 25, 2009 |
| Date |
10/2/09 |
|
NASA's New Mars Orbiter Will
NASA's next mission to Mars
7/18/05
Challenges of Getting to Mar
A chronicle of the delicate
8/14/07
KENNEDY SPACE CENTER, FLA. -
10/3/98
| Date |
10/3/98 |
| Description |
KENNEDY SPACE CENTER, FLA. -- In the Spacecraft Assembly and Encapsulation Facility-2 (SAEF-2), the Mars Polar Lander is secured on a workstand for testing, which includes a functional test of the science instruments and the basic spacecraft subsystems. The Mars Polar Lander is targeted for launch from Cape Canaveral Air Station aboard a Delta II rocket on Jan. 3, 1999. The solar-powered spacecraft is designed to touch down on the Martian surface near the northern-most boundary of the south pole in order to study the water cycle there. The lander also will help scientists learn more about climate change and current resources on Mars, studying such things as frost, dust, water vapor and condensates in the Martian atmosphere. |
|
KENNEDY SPACE CENTER, FLA. -
10/3/98
| Date |
10/3/98 |
| Description |
KENNEDY SPACE CENTER, FLA. -- In the Spacecraft Assembly and Encapsulation Facility-2 (SAEF-2), the top of the Mars Polar Lander is swung out of the way before testing, which includes a functional test of the science instruments and the basic spacecraft subsystems. The Mars Polar Lander is targeted for launch from Cape Canaveral Air Station aboard a Delta II rocket on Jan. 3, 1999. The solar-powered spacecraft is designed to touch down on the Martian surface near the northern-most boundary of the south pole in order to study the water cycle there. The lander also will help scientists learn more about climate change and current resources on Mars, studying such things as frost, dust, water vapor and condensates in the Martian atmosphere. |
|
KENNEDY SPACE CENTER, FLA. -
10/3/98
| Date |
10/3/98 |
| Description |
KENNEDY SPACE CENTER, FLA. -- In the Spacecraft Assembly and Encapsulation Facility-2 (SAEF-2), the protective covering for the Mars Polar Lander is removed so technicians can prepare the Lander for testing, which includes a functional test of the science instruments and the basic spacecraft subsystems. The Mars Polar Lander is targeted for launch from Cape Canaveral Air Station aboard a Delta II rocket on Jan. 3, 1999. The solar- powered spacecraft is designed to touch down on the Martian surface near the northern-most boundary of the south pole in order to study the water cycle there. The lander also will help scientists learn more about climate change and current resources on Mars, studying such things as frost, dust, water vapor and condensates in the Martian atmosphere. |
|
KENNEDY SPACE CENTER, FLA. -
10/13/98
| Date |
10/13/98 |
| Description |
KENNEDY SPACE CENTER, FLA. -- In the Spacecraft Assembly and Encapsulation Facility-2 (SAEF-2), technicians test the science instruments and the basic spacecraft subsystems on the Mars Polar Lander. The solar-powered spacecraft is targeted for launch from Cape Canaveral Air Station aboard a Delta II rocket on Jan. 3, 1999. It is designed to touch down on the Martian surface near the northern-most boundary of the south pole in order to study the water cycle there. The lander also will help scientists learn more about climate change and current resources on Mars, studying such things as frost, dust, water vapor and condensates in the Martian atmosphere. |
|
KENNEDY SPACE CENTER, FLA. -
10/13/98
| Date |
10/13/98 |
| Description |
KENNEDY SPACE CENTER, FLA. -- In the Spacecraft Assembly and Encapsulation Facility-2 (SAEF-2), a technician tests the science instruments and the basic spacecraft subsystems on the Mars Polar Lander. The solar-powered spacecraft is targeted for launch from Cape Canaveral Air Station aboard a Delta II rocket on Jan. 3, 1999. It is designed to touch down on the Martian surface near the northern-most boundary of the south pole in order to study the water cycle there. The lander also will help scientists learn more about climate change and current resources on Mars, studying such things as frost, dust, water vapor and condensates in the Martian atmosphere. |
|
KENNEDY SPACE CENTER, FLA. -
10/13/98
| Date |
10/13/98 |
| Description |
KENNEDY SPACE CENTER, FLA. -- In the Spacecraft Assembly and Encapsulation Facility-2 (SAEF-2), technicians check underneath the Mars Polar Lander during the testing of science instruments. The solar-powered spacecraft is targeted for launch from Cape Canaveral Air Station aboard a Delta II rocket on Jan. 3, 1999. It is designed to touch down on the Martian surface near the northern-most boundary of the south pole in order to study the water cycle there. The lander also will help scientists learn more about climate change and current resources on Mars, studying such things as frost, dust, water vapor and condensates in the Martian atmosphere. |
|
KENNEDY SPACE CENTER, FLA. -
11/12/98
| Date |
11/12/98 |
| Description |
KENNEDY SPACE CENTER, FLA. -- In the Spacecraft Assembly and Encapsulation Facility -2 (SAEF-2), Chris Voorhees (left) and Satish Krishnan (right), from the Jet Propulsion Laboratory, remove the second Mars microprobe from a drum. Two microprobes will hitchhike on the Mars Polar Lander, scheduled to be launched Jan. 3, 1999, aboard a Delta II rocket. The solar-powered spacecraft is designed to touch down on the Martian surface near the northern-most boundary of the south pole in order to study the water cycle there. The lander also will help scientists learn more about climate change and current resources on Mars, studying such things as frost, dust, water vapor and condensates in the Martian atmosphere. The Mars microprobes, called Deep Space 2, are part of NASA's New Millennium Program. They will complement the climate-related scientific focus of the lander by demonstrating an advanced, rugged microlaser system for detecting subsurface water. Such data on polar subsurface water, in the form of ice, should help put limits on scientific projections for the global abundance of water on Mars. |
|
KENNEDY SPACE CENTER, FLA. -
11/12/98
| Date |
11/12/98 |
| Description |
KENNEDY SPACE CENTER, FLA. -- In the Spacecraft Assembly and Encapsulation Facility -2 (SAEF-2), a JPL worker checks the Mars microprobe. Two microprobes will hitchhike on the Mars Polar Lander, scheduled to be launched Jan. 3, 1999, aboard a Delta II rocket. The solar-powered spacecraft is designed to touch down on the Martian surface near the northern-most boundary of the south pole in order to study the water cycle there. The lander also will help scientists learn more about climate change and current resources on Mars, studying such things as frost, dust, water vapor and condensates in the Martian atmosphere. The Mars microprobes, called Deep Space 2, are part of NASA's New Millennium Program. They will complement the climate-related scientific focus of the lander by demonstrating an advanced, rugged microlaser system for detecting subsurface water. Such data on polar subsurface water, in the form of ice, should help put limits on scientific projections for the global abundance of water on Mars. |
|
KENNEDY SPACE CENTER, FLA. -
11/12/98
| Date |
11/12/98 |
| Description |
KENNEDY SPACE CENTER, FLA. -- In the Spacecraft Assembly and Encapsulation Facility -2 (SAEF-2), two JPL workers measure a Mars microprobe. Two microprobes will hitchhike on the Mars Polar Lander, scheduled to be launched Jan. 3, 1999, aboard a Delta II rocket. The solar-powered spacecraft is designed to touch down on the Martian surface near the northern-most boundary of the south pole in order to study the water cycle there. The lander also will help scientists learn more about climate change and current resources on Mars, studying such things as frost, dust, water vapor and condensates in the Martian atmosphere. The Mars microprobes, called Deep Space 2, are part of NASA's New Millennium Program. They will complement the climate-related scientific focus of the lander by demonstrating an advanced, rugged microlaser system for detecting subsurface water. Such data on polar subsurface water, in the form of ice, should help put limits on scientific projections for the global abundance of water on Mars. |
|
KENNEDY SPACE CENTER, FLA. -
11/12/98
| Date |
11/12/98 |
| Description |
KENNEDY SPACE CENTER, FLA. -- In the Spacecraft Assembly and Encapsulation Facility -2 (SAEF-2), JPL workers mount a Mars microprobe onto the Mars Polar Lander. Two microprobes will hitchhike on the lander, scheduled to be launched Jan. 3, 1999, aboard a Delta II rocket. The solar-powered spacecraft is designed to touch down on the Martian surface near the northern- most boundary of the south pole in order to study the water cycle there. The lander also will help scientists learn more about climate change and current resources on Mars, studying such things as frost, dust, water vapor and condensates in the Martian atmosphere. The Mars microprobes, called Deep Space 2, are part of NASA's New Millennium Program. They will complement the climate-related scientific focus of the lander by demonstrating an advanced, rugged microlaser system for detecting subsurface water. Such data on polar subsurface water, in the form of ice, should help put limits on scientific projections for the global abundance of water on Mars. |
|
KENNEDY SPACE CENTER, FLA. -
11/12/98
| Date |
11/12/98 |
| Description |
KENNEDY SPACE CENTER, FLA. -- In the Spacecraft Assembly and Encapsulation Facility -2 (SAEF-2), a JPL worker carries a Mars microprobe to the Mars Polar Lander at left. Two microprobes will hitchhike on the lander, scheduled to be launched Jan. 3, 1999, aboard a Delta II rocket. The solar-powered spacecraft is designed to touch down on the Martian surface near the northern- most boundary of the south pole in order to study the water cycle there. The lander also will help scientists learn more about climate change and current resources on Mars, studying such things as frost, dust, water vapor and condensates in the Martian atmosphere. The Mars microprobes, called Deep Space 2, are part of NASA's New Millennium Program. They will complement the climate-related scientific focus of the lander by demonstrating an advanced, rugged microlaser system for detecting subsurface water. Such data on polar subsurface water, in the form of ice, should help put limits on scientific projections for the global abundance of water on Mars. |
|
KENNEDY SPACE CENTER, FLA. -
11/12/98
| Date |
11/12/98 |
| Description |
KENNEDY SPACE CENTER, FLA. -- In the Spacecraft Assembly and Encapsulation Facility -2 (SAEF-2), JPL workers prepare to mount a Mars microprobe onto the Mars Polar Lander. Two microprobes will hitchhike on the lander, scheduled to be launched Jan. 3, 1999, aboard a Delta II rocket. The solar-powered spacecraft is designed to touch down on the Martian surface near the northern- most boundary of the south pole in order to study the water cycle there. The lander also will help scientists learn more about climate change and current resources on Mars, studying such things as frost, dust, water vapor and condensates in the Martian atmosphere. The Mars microprobes, called Deep Space 2, are part of NASA's New Millennium Program. They will complement the climate-related scientific focus of the lander by demonstrating an advanced, rugged microlaser system for detecting subsurface water. Such data on polar subsurface water, in the form of ice, should help put limits on scientific projections for the global abundance of water on Mars. |
|
KENNEDY SPACE CENTER, FLA. -
11/12/98
| Date |
11/12/98 |
| Description |
KENNEDY SPACE CENTER, FLA. -- In the Spacecraft Assembly and Encapsulation Facility -2 (SAEF-2), the two Mars microprobes are shown mounted on opposite sides of the Mars Polar Lander. The two microprobes and the lander are scheduled to be launched Jan. 3, 1999, aboard a Delta II rocket. The solar-powered spacecraft is designed to touch down on the Martian surface near the northern- most boundary of the south pole in order to study the water cycle there. The lander also will help scientists learn more about climate change and current resources on Mars, studying such things as frost, dust, water vapor and condensates in the Martian atmosphere. The Mars microprobes, called Deep Space 2, are part of NASA's New Millennium Program. They will complement the climate-related scientific focus of the lander by demonstrating an advanced, rugged microlaser system for detecting subsurface water. Such data on polar subsurface water, in the form of ice, should help put limits on scientific projections for the global abundance of water on Mars. |
|
KENNEDY SPACE CENTER, Fla. -
| Description |
KENNEDY SPACE CENTER, Fla. -- In the Spacecraft Assembly & Encapsulation Facility --2, workers check the movement of the 2001 Mars Odyssey Orbiter as it is carried to the workstand at right. The circular object facing forward on the spacecraft is a high-gain antenna. On the right side is the rectangular solar array assembly. The Mars Odyssey Orbiter carries three science instruments: the Thermal Emission Imaging System (THEMIS), the Gamma Ray Spectrometer (GRS), and the Mars Radiation Environment Experiment (MARIE). THEMIS will map the mineralogy and morphology of the Martian surface using a high-resolution camera and a thermal infrared imaging spectrometer. The GRS will achieve global mapping of the elemental composition of the surface and determine the abundance of hydrogen in the shallow subsurface. [The GRS is a rebuild of the instrument lost with the Mars Observer mission.] The MARIE will characterize aspects of the near-space radiation environment as related to the radiation- related risk to human explorers. The Mars Odyssey Orbiter is scheduled for launch on April 7, 2001, aboard a Delta 7925 rocket from Launch Pad 17-A, Cape Canaveral Air Force Station. |
|
KENNEDY SPACE CENTER, Fla. -
| Description |
KENNEDY SPACE CENTER, Fla. -- Technicians guide The Gamma Ray Spectrometer (GRS) into place to be installed on the Mars Odyssey Orbiter in the Spacecraft Assembly and Encapsulation Facility 2 (SAEF 2). The orbiter will carry three science instruments: the Thermal Emission Imaging System (THEMIS), the Gamma Ray Spectrometer (GRS), and the Mars Radiation Environment Experiment (MARIE). THEMIS will map the mineralogy and morphology of the Martian surface using a high-resolution camera and a thermal infrared imaging spectrometer. The GRS will achieve global mapping of the elemental composition of the surface and determine the abundance of hydrogen in the shallow subsurface. [The GRS is a rebuild of the instrument lost with the Mars Observer mission.] The MARIE will characterize aspects of the near-space radiation environment with regards to the radiation- related risk to human explorers. The Mars Odyssey Orbiter is scheduled for launch on April 7, 2001, aboard a Delta 7925 rocket from Launch Pad 17-A, Cape Canaveral Air Force Station. |
|
KENNEDY SPACE CENTER, Fla. -
| Description |
KENNEDY SPACE CENTER, Fla. -- Workers in the Spacecraft Assembly and Encapsulation Facility 2 check the placement of the Thermal Emission Imaging System (THEMIS) on the Mars Odyssey Orbiter. THEMIS will map the mineralogy and morphology of the Martian surface using a high-resolution camera and a thermal infrared imaging spectrometer. The orbiter will carry three science instruments: THEMIS, the Gamma Ray Spectrometer (GRS), and the Mars Radiation Environment Experiment (MARIE). The GRS will achieve global mapping of the elemental composition of the surface and determine the abundance of hydrogen in the shallow subsurface. The MARIE will characterize aspects of the near-space radiation environment with regards to the radiation-related risk to human explorers. The Mars Odyssey Orbiter is scheduled for launch on April 7, 2001, aboard a Delta 7925 rocket from Launch Pad 17-A, Cape Canaveral Air Force Station. |
|
KENNEDY SPACE CENTER, Fla. -
| Description |
KENNEDY SPACE CENTER, Fla. --- Workers in the Spacecraft Assembly and Encapsulation Facility (SAEF 2) get ready to conduct an illumination test on the 2001 Mars Odyssey Orbiter. Various components of the Odyssey Orbiter are undergoing testing. Scheduled for launch April 7, 2001, the orbiter contains three science instruments: THEMIS, the Gamma Ray Spectrometer (GRS), and the Mars Radiation Environment Experiment (MARIE). THEMIS will map the mineralogy and morphology of the Martian surface using a high-resolution camera and a thermal infrared imaging spectrometer. The GRS will achieve global mapping of the elemental composition of the surface and determine the abundance of hydrogen in the shallow subsurface. The MARIE will characterize aspects of the near-space radiation environment with regards to the radiation-related risk to human explorers. # # # # # |
|
KENNEDY SPACE CENTER, Fla. -
| Description |
KENNEDY SPACE CENTER, Fla. --- At Launch Complex 17-A, Cape Canaveral Air Force Station, workers begin placing the Delta rocket fairing around the Mars Odyssey spacecraft. NASA's latest explorer carries three scientific instruments to map the chemical and mineralogical makeup of Mars: a thermal-emission imaging system, a gamma ray spectrometer and a Martian radiation environment experiment. The imaging system will map the planet with high-resolution thermal images and give scientists an increased level of detail to help them understand how the mineralogy of the planet relates to the land forms. In addition, Odyssey will serve as a communications relay for U.S. and international landers arriving at Mars in 2003/2004. The Mars Odyssey is scheduled for launch April 7, 2001, at 11:02 a.m. EST. |
|
NASA TV's This Week @NASA, M
NASA Administrator Charles B
05/14/10
| Description |
NASA Administrator Charles Bolden joined with other NASA volunteers in helping these fifth graders become rocket scientists for day. * NASA assets continue to help scientists track two events causing worldwide environmental and economic concern. * Jet Propulsion Laboratory engineers used a helicopter to run a series of tests of the Mars Science Laboratory's landing system. * Thanks to a program at the NASA Marshall Space Flight Center, Huntsville-area students are helping scientific and community leaders make better-informed decisions about Lyme disease and how and where this chronic illness is likely to strike the local public.* A new book highlighting some of the most beautiful and awe-inspiring images captured by the Hubble Space Telescope is now available in stores and online. * Thirty-seven years ago, America's first space station, Skylab, was launched into Earth orbit from the Kennedy Space Center atop a Saturn V rocket. A ''dry,'' or empty, third stage of the rocket was completely outfitted as a workshop and laboratory. |
| Date |
05/14/10 |
|
NASA TV's This Week at NASA,
* With skies overcast skies,
01/22/2010
| Description |
* With skies overcast skies, the next space shuttle crew set down their T-38s at the Kennedy Space Center, eager to begin their launch dress rehearsal, or Terminal Countdown Demonstration test. The crew will fly aboard space shuttle Endeavour bringing the Tranquility node and its cupola for installation on the International Space Station. The STS-130 mission is scheduled to liftoff from the Kennedy Space Center on Sunday, February 7, at 4:39 a.m. Eastern. * The scheduled launch of NASA's new Solar Dynamics Observatory, or SDO, is drawing near. Its prelaunch briefing, conducted at NASA headquarters in Washington and the Kennedy Space Center, gave media a look at SDO's unprecedented mission to study the sun and its dynamic behavior. * JSC: The next International Space Station crew briefed reporters on their upcoming mission. NASA astronaut Tracy Caldwell Dyson was joined by Russian cosmonauts Alexander Skyorsov and Mikhail Kornlenko to discuss their upcoming Expedition 23 mission. * Members of the STS-129 crew continued their whirlwind tour of NASA centers. Five members of the space shuttle Atlantis crew thanked employees at the Stennis Space Center for their part in a safe STS-129 mission to the International Space Station in November. * The Mars Exploration Rover Opportunity this week celebrates six years of exploration and research on the surface of the red planet. * The most powerful camera aboard the NASA spacecraft orbiting Mars will soon be taking photo suggestions from the public. |
| Date |
01/22/2010 |
|
NASA TV's This Week at NASA,
Scientists now believe Earth
04/09/10
| Description |
Scientists now believe Earth's nearest neighbor Venus is more like our planet than they previously thought. New findings based on pictures and infrared imagery captured by the European Space Agency's Venus Express mission and NASA's Magellan spacecraft confirm that Venus is not a cold rock but a dynamic host of active volcanoes like those found in Hawaii. * Opportunity, the Mars Exploration Rover, has reached another milestone in its travels around the Red Planet. The rover has covered more than twelve-and-a-half miles since landing on Mars six years ago. * The first, full-scale, friction stir welded and spun-formed tank dome was unveiled by NASA and its partners at a special ceremony at the Marshall Space Flight Center. * Four members of the STS-130 Endeavour space shuttle crew expressed their appreciation for employees of the Marshall Space Flight Center during a recent visit. The crew thanked employees for supporting the successful February mission to the International Space Station. Among other contributions, Marshall provided the three main engines that powered the crew on their 14-day mission. * Twenty-nine years ago, on April 12, 1981, space shuttle Columbia was launched from the Kennedy Space Center. Commanded by Gemini and Apollo veteran John Young and piloted by first-time flyer Bob Crippen, this first space shuttle mission, STS-1, was also the first U.S. manned orbital space flight since the Apollo-Soyuz Test Project almost six years earlier. |
| Date |
04/09/10 |
|
Pathfinder Launch
| title |
Pathfinder Launch |
| description |
A Delta rocket carrying Mars Pathfinder and the Sojourner Rover lifts off from Kennedy Space Center on Dec. 4, 1996. *Image Credit*: NASA |
|
Columbia Memorial
| title |
Columbia Memorial |
| date |
01.06.2004 |
| description |
The landing site of the Mars Spirit rover in honor of the astronauts who died in the tragic accident of the Space Shuttle Columbia in February. The area in the vast flatland of the Gusev Crater where Spirit landed this weekend will be called the Columbia Memorial Station. Since its historic landing, Spirit has been sending extraordinary images of its new surroundings on the red planet over the past few days. Among them, an image of a memorial plaque placed on the spacecraft to Columbia's astronauts and the STS-107 mission. The plaque is mounted on the back of Spirit's high-gain antenna, a disc-shaped tool used for communicating directly with Earth. The plaque is aluminum and approximately six inches in diameter. The memorial plaque was attached March 28, 2003, at the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, Fla. Chris Voorhees and Peter Illsley, Mars Exploration Rover engineers at NASA's Jet Propulsion Laboratory, Pasadena, Calif., designed the plaque. *Image Credit*: NASA |
|
Ready for Liftoff
| title |
Ready for Liftoff |
| date |
06.08.2003 |
| description |
The Delta II rocket carrying the Mars Exploration Rover Spirit is prepared for launch at Kennedy Space Center in Jun3 2003. NASA's twin Mars Exploration Rovers are designed to study the history of water on Mars. These robotic geologists are equipped with a robotic arm, a drilling tool, three spectrometers, and four pairs of cameras that allow them to have a human-like, 3D view of the terrain. Each rover could travel as far as 100 meters in one day to act as Mars scientists' eyes and hands, exploring an environment where humans are not yet able to go. *Image Credit*: NASA |
|
Mars Global Surveyor Prepara
| Title |
Mars Global Surveyor Preparations |
| Full Description |
At Launch Complex 17A on Cape Canaveral Air Station, the Mars Global Surveyor upper stage booster assembly is being encased in the Delta II payload fairing. Liftoff of the first in a series of U.S. missions to Mars was just days away, with launch preparations proceeding on schedule. Mars Global Surveyor later entered Mars orbit and began a highly successful mission taking high resolution photographs of the Martian surface and making other measurements. |
| Date |
10/29/1996 |
| NASA Center |
Kennedy Space Center |
|
Mars Global Surveyor Spacecr
| Title |
Mars Global Surveyor Spacecraft |
| Full Description |
Jet Propulsion Laboratory (JPL) workers in the Payload Hazardous Servicing Facility (PHSF) prepare the Mars Global Surveyor spacecraft for transfer to the launch pad by placing it in a protective canister. The Surveyor spacecraft (upper) is already mated to its solid propellant upper stage booster (lower), which is actually the third stage of the Delta II expendable launch vehicle that will propel the spacecraft on its interplanetary journey to the Red Planet. Once at Launch Pad 17A on Cape Canaveral Air Station, the spacecraft and booster assembly will be stacked atop the Delta vehicle. The Surveyor is slated for liftoff on Nov. 6, 1996 at the beginning of a 20 day launch period. |
| Date |
10/21/1996 |
| NASA Center |
Kennedy Space Center |
|
Mars Pathfinder Lander Prepa
| Title |
Mars Pathfinder Lander Preparations |
| Full Description |
In Spacecraft Assembly and Encapsulation Facility-2 (SAEF-2), Jet Propulsion Laboratory workers are closing up the metal "petals" of the Mars Pathfinder lander. The Sojourner small rover is visible on one of the three petals. |
| Date |
10/2/1996 |
| NASA Center |
Kennedy Space Center |
|
Mars Pathfinder Preparations
| Title |
Mars Pathfinder Preparations |
| Full Description |
Workers at Launch Complex 17B on Cape Canaveral Air Station get one final look at the Mars Pathfinder before it is sealed inside a protective payload fairing for flight. The Pathfinder and its PAM-D upper stage booster are perched atop the Delta II expendable launch vehicle that will propel the spacecraft into orbit. Liftoff is set for December 2 at 2:09 a.m. EST. |
| Date |
11/27/1996 |
| NASA Center |
Kennedy Space Center |
|
First Titan-Centaur Launch T
| Title |
First Titan-Centaur Launch Test |
| Full Description |
The first Titan/Centaur lifted off from Complex 41 at Cape Kennedy Air Force Station at 9:48 AM EDT. The Titan stages burned as programmed, but when the Centaur stage failed to ignite, the Range Safety Officer destroyed it. The new NASA rocket was launched on a proof of concept flight designed to prepare it for twin Viking launches to Mars in 1975 and other missions involving heavy payloads. The 160-foot-tall rocket combines the Air Force Titan III with the NASA high-energy Centaur final stage. The twin solid rocket boosters have a combined liftoff thrust of 2.4 million pounds. Aboard Titan/ Centaur on its proof of concept flight were a dynamic simulator of the Viking spacecraft and a small scientific satellite (SPHINX) designed to determine how high voltage solar cells, insulators, and conductors are affected by the charges particles in space. KSC's Unmanned Launch Operations Directorate conducted the launch. For more information about Titan and Centaur, please see Chapters 4 and 8, respectively, in Roger Launius and Dennis Jenkins' book To Reach the High Frontier published by The University Press of Kentucky in 2002. |
| Date |
02/11/1974 |
| NASA Center |
Kennedy Space Center |
|
Viking 1 Launch
| Title |
Viking 1 Launch |
| Full Description |
Viking 1 was launched by a Titan/Centaur rocket from Complex 41 at Cape Canaveral Air Force Station at 5:22 p.m. EDT to begin a half-billion mile, 11-month journey through space to explore Mars. The 4-ton spacecraft went into orbit around the red planet in mid-1976. |
| Date |
8/20/1975 |
| NASA Center |
Kennedy Space Center |
|
Viking Pre-Launch Test Fligh
| Title |
Viking Pre-Launch Test Flight |
| Full Description |
The Titan booster is a two-stage liquid-fueled rocket, with two additional large, solid-propellant rockets attached. It is a member of the Titan family that was used in NASA's Gemini program. The Centaur is a liquid oxygen- liquid hydrogen, high- energy upper stage used on Surveyor flights to the Moon and on Mariner flights to Mars. At liftoff, the solid rockets provide 9.61 million newtons (2.16 million pounds) of thrust. When the solids burn out, the first stage of the Titan booster ignites, and followed by the second-stage ignition as the first stage shuts down. The Centaur ignites on second stage shutdown to inject the spacecraft into orbit. Then after a 30-minute coast around the Earth into position for re-start, the Centaur re-ignites to propel Viking on its Mars trajectory. Once this maneuver is completed the spacecraft separates from the Centaur, which subsequently is deflected away from the flight path to prevent its impact on the surface of Mars. Shortly after separating from the Centaur, the orbiter portion of the combined orbiter-lander spacecraft orients and stabilizes the spacecraft by using the Sun and a very bright star in the southern sky, Canopus, for celestial reference. For more information about Titan and Centaur, please see Chapters 4 and 8, respectively, in Roger Launius and Dennis Jenkins' book To Reach the High Frontier published by The University Press of Kentucky in 2002. |
| Date |
01/20/1974 |
| NASA Center |
Kennedy Space Center |
|
Ares I Upper Stage Fabricati
| Name of Image |
Ares I Upper Stage Fabrication |
| Date of Image |
2007-08-09 |
| Full Description |
Under the goals of the Vision for Space Exploration, Ares I is a chief component of the cost-effective space transportation infrastructure being developed by NASA's Constellation Program. This transportation system will safely and reliably carry human explorers back to the moon, and then onward to Mars and other destinations in the solar system. The Ares I effort includes multiple project element teams at NASA centers and contract organizations around the nation, and is managed by the Exploration Launch Projects Office at NASA's Marshall Space Flight Center (MFSC). ATK Launch Systems near Brigham City, Utah, is the prime contractor for the first stage booster. ATK's subcontractor, United Space Alliance of Houston, is designing, developing and testing the parachutes at its facilities at NASA's Kennedy Space Center in Florida. NASA's Johnson Space Center in Houston hosts the Constellation Program and Orion Crew Capsule Project Office and provides test instrumentation and support personnel. Together, these teams are developing vehicle hardware, evolving proven technologies, and testing components and systems. Their work builds on powerful, reliable space shuttle propulsion elements and nearly a half-century of NASA space flight experience and technological advances. Ares I is an inline, two-stage rocket configuration topped by the Crew Exploration Vehicle, its service module, and a launch abort system. This HD video image, depicts a manufactured aluminum panel, that will be used to fabricate the Ares I upper stage barrel, undergoing a confidence panel test. In this test, the bent aluminum is stressed to breaking point and thoroughly examined. The panels are manufactured by AMRO Manufacturing located in El Monte, California. (Highest resolution available) |
|
Stir Friction Welding Used i
| Name of Image |
Stir Friction Welding Used in Ares I Upper Stage Fabrication |
| Date of Image |
2007-08-09 |
| Full Description |
Under the goals of the Vision for Space Exploration, Ares I is a chief component of the cost-effective space transportation infrastructure being developed by NASA's Constellation Program. This transportation system will safely and reliably carry human explorers back to the moon, and then onward to Mars and other destinations in the solar system. The Ares I effort includes multiple project element teams at NASA centers and contract organizations around the nation, and is managed by the Exploration Launch Projects Office at NASA's Marshall Space Flight Center (MFSC). ATK Launch Systems near Brigham City, Utah, is the prime contractor for the first stage booster. ATK's subcontractor, United Space Alliance of Houston, is designing, developing and testing the parachutes at its facilities at NASA's Kennedy Space Center in Florida. NASA's Johnson Space Center in Houston hosts the Constellation Program and Orion Crew Capsule Project Office and provides test instrumentation and support personnel. Together, these teams are developing vehicle hardware, evolving proven technologies, and testing components and systems. Their work builds on powerful, reliable space shuttle propulsion elements and nearly a half-century of NASA space flight experience and technological advances. Ares I is an inline, two-stage rocket configuration topped by the Crew Exploration Vehicle, its service module, and a launch abort system. This HD video image depicts friction stir welding used in manufacturing aluminum panels that will fabricate the Ares I upper stage barrel. The aluminum panels are subjected to confidence panel tests during which the bent aluminum is stressed to breaking point and thoroughly examined. The panels are manufactured by AMRO Manufacturing located in El Monte, California. (Highest resolution available) |
|
Ares I Upper Stage Fabricati
| Name of Image |
Ares I Upper Stage Fabrication |
| Date of Image |
2007-08-09 |
| Full Description |
Under the goals of the Vision for Space Exploration, Ares I is a chief component of the cost-effective space transportation infrastructure being developed by NASA's Constellation Program. This transportation system will safely and reliably carry human explorers back to the moon, and then onward to Mars and other destinations in the solar system. The Ares I effort includes multiple project element teams at NASA centers and contract organizations around the nation, and is managed by the Exploration Launch Projects Office at NASA's Marshall Space Flight Center (MFSC). ATK Launch Systems near Brigham City, Utah, is the prime contractor for the first stage booster. ATK's subcontractor, United Space Alliance of Houston, is designing, developing and testing the parachutes at its facilities at NASA's Kennedy Space Center in Florida. NASA's Johnson Space Center in Houston hosts the Constellation Program and Orion Crew Capsule Project Office and provides test instrumentation and support personnel. Together, these teams are developing vehicle hardware, evolving proven technologies, and testing components and systems. Their work builds on powerful, reliable space shuttle propulsion elements and nearly a half-century of NASA space flight experience and technological advances. Ares I is an inline, two-stage rocket configuration topped by the Crew Exploration Vehicle, its service module, and a launch abort system. This HD video image depicts confidence testing of a manufactured aluminum panel that will fabricate the Ares I upper stage barrel. In this test, bent aluminum is stressed to breaking point and thoroughly examined. The panels are manufactured by AMRO Manufacturing located in El Monte, California. (Highest resolution available) |
|
Ares I Upper Stage Fabricati
| Name of Image |
Ares I Upper Stage Fabrication |
| Date of Image |
2006-08-08 |
| Full Description |
Under the goals of the Vision for Space Exploration, Ares I is a chief component of the cost-effective space transportation infrastructure being developed by NASA's Constellation Program. This transportation system will safely and reliably carry human explorers back to the moon, and then onward to Mars and other destinations in the solar system. The Ares I effort includes multiple project element teams at NASA centers and contract organizations around the nation, and is managed by the Exploration Launch Projects Office at NASA's Marshall Space Flight Center (MFSC). ATK Launch Systems near Brigham City, Utah, is the prime contractor for the first stage booster. ATK's subcontractor, United Space Alliance of Houston, is designing, developing and testing the parachutes at its facilities at NASA's Kennedy Space Center in Florida. NASA's Johnson Space Center in Houston hosts the Constellation Program and Orion Crew Capsule Project Office and provides test instrumentation and support personnel. Together, these teams are developing vehicle hardware, evolving proven technologies, and testing components and systems. Their work builds on powerful, reliable space shuttle propulsion elements and nearly a half-century of NASA space flight experience and technological advances. Ares I is an inline, two-stage rocket configuration topped by the Crew Exploration Vehicle, its service module, and a launch abort system. This HD video image depicts a manufactured aluminum panel that will be used to fabricate the Ares I upper stage barrel, undergoing a confidence panel test. In this test, the bent aluminum is stressed to breaking point and thoroughly examined. The panels are manufactured by AMRO Manufacturing located in El Monte, California. (Highest resolution available) |
|
Ares I Upper Stage Fabricati
| Name of Image |
Ares I Upper Stage Fabrication |
| Date of Image |
2009-08-09 |
| Full Description |
Under the goals of the Vision for Space Exploration, Ares I is a chief component of the cost-effective space transportation infrastructure being developed by NASA's Constellation Program. This transportation system will safely and reliably carry human explorers back to the moon, and then onward to Mars and other destinations in the solar system. The Ares I effort includes multiple project element teams at NASA centers and contract organizations around the nation, and is managed by the Exploration Launch Projects Office at NASA's Marshall Space Flight Center (MFSC). ATK Launch Systems near Brigham City, Utah, is the prime contractor for the first stage booster. ATK's subcontractor, United Space Alliance of Houston, is designing, developing and testing the parachutes at its facilities at NASA's Kennedy Space Center in Florida. NASA's Johnson Space Center in Houston hosts the Constellation Program and Orion Crew Capsule Project Office and provides test instrumentation and support personnel. Together, these teams are developing vehicle hardware, evolving proven technologies, and testing components and systems. Their work builds on powerful, reliable space shuttle propulsion elements and nearly a half-century of NASA space flight experience and technological advances. Ares I is an inline, two-stage rocket configuration topped by the Crew Exploration Vehicle, its service module, and a launch abort system. This HD video image depicts a manufactured aluminum panel that will be used to fabricate the Ares I upper stage barrel, undergoing a confidence panel test. In this test, the bent aluminum is stressed to breaking point and thoroughly examined. The panels are manufactured by AMRO Manufacturing located in El Monte, California. |
|
Ares I Upper Stage Fabricati
| Name of Image |
Ares I Upper Stage Fabrication |
| Date of Image |
2006-08-09 |
| Full Description |
Under the goals of the Vision for Space Exploration, Ares I is a chief component of the cost-effective space transportation infrastructure being developed by NASA's Constellation Program. This transportation system will safely and reliably carry human explorers back to the moon, and then onward to Mars and other destinations in the solar system. The Ares I effort includes multiple project element teams at NASA centers and contract organizations around the nation, and is managed by the Exploration Launch Projects Office at NASA's Marshall Space Flight Center (MFSC). ATK Launch Systems near Brigham City, Utah, is the prime contractor for the first stage booster. ATK's subcontractor, United Space Alliance of Houston, is designing, developing and testing the parachutes at its facilities at NASA's Kennedy Space Center in Florida. NASA's Johnson Space Center in Houston hosts the Constellation Program and Orion Crew Capsule Project Office and provides test instrumentation and support personnel. Together, these teams are developing vehicle hardware, evolving proven technologies, and testing components and systems. Their work builds on powerful, reliable space shuttle propulsion elements and nearly a half-century of NASA space flight experience and technological advances. Ares I is an inline, two-stage rocket configuration topped by the Crew Exploration Vehicle, its service module, and a launch abort system. This HD video image depicts a manufactured aluminum panel, that will fabricate the Ares I upper stage barrel, undergoing a confidence panel test. In this test, bent aluminum is stressed to breaking point and thoroughly examined. The panels are manufactured by AMRO Manufacturing located in El Monte, California. (Highest resolution available) |
|
Ares I Upper Stage Fabricati
| Name of Image |
Ares I Upper Stage Fabrication |
| Date of Image |
2007-08-09 |
| Full Description |
Under the goals of the Vision for Space Exploration, Ares I is a chief component of the cost-effective space transportation infrastructure being developed by NASA's Constellation Program. This transportation system will safely and reliably carry human explorers back to the moon, and then onward to Mars and other destinations in the solar system. The Ares I effort includes multiple project element teams at NASA centers and contract organizations around the nation, and is managed by the Exploration Launch Projects Office at NASA's Marshall Space Flight Center (MFSC). ATK Launch Systems near Brigham City, Utah, is the prime contractor for the first stage booster. ATK's subcontractor, United Space Alliance of Houston, is designing, developing and testing the parachutes at its facilities at NASA's Kennedy Space Center in Florida. NASA's Johnson Space Center in Houston hosts the Constellation Program and Orion Crew Capsule Project Office and provides test instrumentation and support personnel. Together, these teams are developing vehicle hardware, evolving proven technologies, and testing components and systems. Their work builds on powerful, reliable space shuttle propulsion elements and nearly a half-century of NASA space flight experience and technological advances. Ares I is an inline, two-stage rocket configuration topped by the Crew Exploration Vehicle, its service module, and a launch abort system. This HD video image depicts a manufactured aluminum panel, that will fabricate the Ares I upper stage barrel, undergoing a confidence panel test. In this test, the bent aluminum is stressed to breaking point and thoroughly examined. The panels are manufactured by AMRO Manufacturing located in El Monte, California. (Highest resolution available) |
|
Mars Observer/Transfer Orbit
| Name of Image |
Mars Observer/Transfer Orbit Stage (TOS) Stacking on Titan III |
| Date of Image |
1992-07-24 |
| Full Description |
A Delta II rocket carrying the Geomagnetic Tail Lab (GEOTAIL) spacecraft lifts off at Launch Complex 17, Kennedy Space Center (KSC) into a cloud-dappled sky. This liftoff marks the first Delta launch under the medium expendable launch vehicle services contract between NASA and McDonnell Douglas Space Systems Co. The GEOTAIL mission, a joint US/Japanese project, is the first in a series of five satellites to study the interactions between the Sun, the Earth's magnetic field, and the Van Allen radiation belts. |
|
Ares I Upper Stage Fabricati
| Name of Image |
Ares I Upper Stage Fabrication |
| Date of Image |
2007-08-09 |
| Full Description |
Under the goals of the Vision for Space Exploration, Ares I is a chief component of the cost-effective space transportation infrastructure being developed by NASA's Constellation Program. This transportation system will safely and reliably carry human explorers back to the moon, and then onward to Mars and other destinations in the solar system. The Ares I effort includes multiple project element teams at NASA centers and contract organizations around the nation, and is managed by the Exploration Launch Projects Office at NASA's Marshall Space Flight Center (MFSC). ATK Launch Systems near Brigham City, Utah, is the prime contractor for the first stage booster. ATK's subcontractor, United Space Alliance of Houston, is designing, developing and testing the parachutes at its facilities at NASA's Kennedy Space Center in Florida. NASA's Johnson Space Center in Houston hosts the Constellation Program and Orion Crew Capsule Project Office and provides test instrumentation and support personnel. Together, these teams are developing vehicle hardware, evolving proven technologies, and testing components and systems. Their work builds on powerful, reliable space shuttle propulsion elements and nearly a half-century of NASA space flight experience and technological advances. Ares I is an inline, two-stage rocket configuration topped by the Crew Exploration Vehicle, its service module, and a launch abort system. In this HD video image, processes for upper stage barrel fabrication are talking place. The aluminum panels are manufacturing process demonstration articles that will undergo testing until perfected. The panels are built by AMRO Manufacturing located in El Monte, California. (Highest resolution available) |
|
Ares I Upper Stage Fabricati
| Name of Image |
Ares I Upper Stage Fabrication |
| Date of Image |
2007-08-09 |
| Full Description |
Under the goals of the Vision for Space Exploration, Ares I is a chief component of the cost-effective space transportation infrastructure being developed by NASA's Constellation Program. This transportation system will safely and reliably carry human explorers back to the moon, and then onward to Mars and other destinations in the solar system. The Ares I effort includes multiple project element teams at NASA centers and contract organizations around the nation, and is managed by the Exploration Launch Projects Office at NASA's Marshall Space Flight Center (MFSC). ATK Launch Systems near Brigham City, Utah, is the prime contractor for the first stage booster. ATK's subcontractor, United Space Alliance of Houston, is designing, developing and testing the parachutes at its facilities at NASA's Kennedy Space Center in Florida. NASA's Johnson Space Center in Houston hosts the Constellation Program and Orion Crew Capsule Project Office and provides test instrumentation and support personnel. Together, these teams are developing vehicle hardware, evolving proven technologies, and testing components and systems. Their work builds on powerful, reliable space shuttle propulsion elements and nearly a half-century of NASA space flight experience and technological advances. Ares I is an inline, two-stage rocket configuration topped by the Crew Exploration Vehicle, its service module, and a launch abort system. This HD video image depicts a manufactured panel that will be used for the Ares I upper stage barrel fabrication. The aluminum panels are manufacturing process demonstration articles that will undergo testing until perfected. The panels are built by AMRO Manufacturing located in El Monte, California. (Highest resolution available) |
|
ARES I Upper Stage Fabricati
| Name of Image |
ARES I Upper Stage Fabrication |
| Date of Image |
2007-08-09 |
| Full Description |
Under the goals of the Vision for Space Exploration, Ares I is a chief component of the cost-effective space transportation infrastructure being developed by NASA's Constellation Program. This transportation system will safely and reliably carry human explorers back to the moon, and then onward to Mars and other destinations in the solar system. The Ares I effort includes multiple project element teams at NASA centers and contract organizations around the nation, and is managed by the Exploration Launch Projects Office at NASA's Marshall Space Flight Center (MFSC). ATK Launch Systems near Brigham City, Utah, is the prime contractor for the first stage booster. ATK's subcontractor, United Space Alliance of Houston, is designing, developing and testing the parachutes at its facilities at NASA's Kennedy Space Center in Florida. NASA's Johnson Space Center in Houston hosts the Constellation Program and Orion Crew Capsule Project Office and provides test instrumentation and support personnel. Together, these teams are developing vehicle hardware, evolving proven technologies, and testing components and systems. Their work builds on powerful, reliable space shuttle propulsion elements and nearly a half-century of NASA space flight experience and technological advances. Ares I is an inline, two-stage rocket configuration topped by the Crew Exploration Vehicle, its service module, and a launch abort system. In this HD video image, processes for upper stage barrel fabrication are talking place. Aluminum panels are manufacturing process demonstration articles that will undergo testing until perfected. The panels are built by AMRO Manufacturing located in El Monte, California. (Largest resolution available) |
|
Ares I Upper Stage Fabricati
| Name of Image |
Ares I Upper Stage Fabrication |
| Date of Image |
2007-08-09 |
| Full Description |
Under the goals of the Vision for Space Exploration, Ares I is a chief component of the cost-effective space transportation infrastructure being developed by NASA's Constellation Program. This transportation system will safely and reliably carry human explorers back to the moon, and then onward to Mars and other destinations in the solar system. The Ares I effort includes multiple project element teams at NASA centers and contract organizations around the nation, and is managed by the Exploration Launch Projects Office at NASA's Marshall Space Flight Center (MFSC). ATK Launch Systems near Brigham City, Utah, is the prime contractor for the first stage booster. ATK's subcontractor, United Space Alliance of Houston, is designing, developing and testing the parachutes at its facilities at NASA's Kennedy Space Center in Florida. NASA's Johnson Space Center in Houston hosts the Constellation Program and Orion Crew Capsule Project Office and provides test instrumentation and support personnel. Together, these teams are developing vehicle hardware, evolving proven technologies, and testing components and systems. Their work builds on powerful, reliable space shuttle propulsion elements and nearly a half-century of NASA space flight experience and technological advances. Ares I is an inline, two-stage rocket configuration topped by the Crew Exploration Vehicle, its service module, and a launch abort system. This HD video image depicts the manufacturing of aluminum panels that will be used to form the Ares I barrel. The panels are manufacturing process demonstration articles that will undergo testing until perfected. The panels are built by AMRO Manufacturing located in El Monte, California. (Highest resolution available) |
|
Ares I Upper Stage Fabricati
| Name of Image |
Ares I Upper Stage Fabrication |
| Date of Image |
2006-08-09 |
| Full Description |
Under the goals of the Vision for Space Exploration, Ares I is a chief component of the cost-effective space transportation infrastructure being developed by NASA's Constellation Program. This transportation system will safely and reliably carry human explorers back to the moon, and then onward to Mars and other destinations in the solar system. The Ares I effort includes multiple project element teams at NASA centers and contract organizations around the nation, and is managed by the Exploration Launch Projects Office at NASA's Marshall Space Flight Center (MFSC). ATK Launch Systems near Brigham City, Utah, is the prime contractor for the first stage booster. ATK's subcontractor, United Space Alliance of Houston, is designing, developing and testing the parachutes at its facilities at NASA's Kennedy Space Center in Florida. NASA's Johnson Space Center in Houston hosts the Constellation Program and Orion Crew Capsule Project Office and provides test instrumentation and support personnel. Together, these teams are developing vehicle hardware, evolving proven technologies, and testing components and systems. Their work builds on powerful, reliable space shuttle propulsion elements and nearly a half-century of NASA space flight experience and technological advances. Ares I is an inline, two-stage rocket configuration topped by the Crew Exploration Vehicle, its service module, and a launch abort system. In this HD video image, processes for upper stage barrel fabrication are talking place. The aluminum panels are manufacturing process demonstration articles that will undergo testing until perfected. The panels are built by AMRO Manufacturing located in El Monte, California. (Highest resolution Available) |
|
Fueled for Flight
| title |
Fueled for Flight |
| Description |
Looking like something out of a science fiction movie, the Mars Reconnaissance Orbiter team loaded 1,196 kilograms (2,637 pounds) of fuel onto the vehicle in one of the final steps before launch. Engineers and technicians in SCAPE suits (Self-Contained Atmospheric Protective Ensemble) loaded 1,196 kilograms (2,637 pounds) of high-purity hydrazine, bringing the spacecraft up to its flight mass of 2,180 kilograms (4,806 pounds). For safety reasons, photographers were not allowed in the Payload Hazardous Servicing Facility at the Kennedy Space Center during fueling. The pictured technicians, in similar fueling gear, were suiting up to fuel the Deep Impact spacecraft in December 2004. The orbiter is currently undergoing two final days of electrical testing. On Thursday, July 21, the final inspection will take place and the spacecraft will be mated to the launch vehicle adapter on Friday. Credit: NASA |
|
Mars Reconnaissance Orbiter
| title |
Mars Reconnaissance Orbiter is Off to Mars! |
| Description |
The Mars Reconnaissance Orbiter lifted off this morning from Launch Complex 41 at Cape Canaveral Air Force Station, Florida. Hundreds of onlookers including the science and engineering teams' families cheered from a safe distance at Kennedy Space Center. The launch is the culmination of over five years of planning, assembling and testing. The orbiter now faces a challenging seven-month journey to Mars. The Mars Reconnaissance Orbiter mission marks the next generation of Mars exploration. The spacecraft's powerful instruments will provide unprecedented data from the red planet, tracing the history of water on the planet with spectrometers and high-resolution images and surveying for future landing sites. Credit: NASA |
|
Jim Graf and Howard Eisen
| title |
Jim Graf and Howard Eisen |
| Description |
Mars Reconnaissance Orbiter project manager Jim Graf (left) and flight system manager Howard Eisen (right) field questions from reporters at a joyous post-launch press conference at Kennedy Space Center in Florida. Credit: NASA/JPL |
|
|