|
|
Browse All
:
International Space Station (ISS) of Washington, D.C. and Russia
|
Printer Friendly |
Mir is 10
| Title |
Mir is 10 |
| Explanation |
The first module of the Russian Space Agency's Mir Space Station [ http://www.osf.hq.nasa.gov/mir/Welcome.html ] was launched into orbit 10 years ago (on February 20, 1986). Mir has since been substantially expanded [ http://liftoff.msfc.nasa.gov/rsa/mir.html ] in orbit by adding additional modules including the Kvant Astrophysics Module [ http://heasarc.gsfc.nasa.gov/docs/heasarc/missions/kvant.html ](1987) and recently a docking module. NASA's Space Shuttle Atlantis [ http://antwrp.gsfc.nasa.gov/apod/ap950812.html ] was modified to allow it to dock with Mir in 1995 (STS-71, [ http://lib04.jsc.nasa.gov/sts-71/ ], STS 74 [ http://lib04.jsc.nasa.gov/sts-74/glance/ ]) beginning a series of Shuttle-Mir flights [ http://www.rzg.mpg.de/~bdp/vsohp/mir-shuttle.html ] scheduled to continue through 1997. In this wide angle view - poised above planet Earth with sunlight glinting from solar panels - Mir and Atlantis are seen connected via the docking module from the perspective of the shuttle payload bay. The image is from an IMAX movie frame [ http://lib04.jsc.nasa.gov/sts-74/images/imax/ ] taken during the STS 74 mission. In late 1997, building on this jointly developed understanding and experience, the US and Russia will launch the first modules of the International Space Station [ http://issa-www.jsc.nasa.gov/ss/spacestation.html ]. |
|
STS-101 crew heads for Astro
| Title |
STS-101 crew heads for Astrovan and trip to launch pad |
| Description |
The STS-101 crew show their joy and eagerness to begin their mission as they had to the Astrovan for the trip to Launch Pad 39A and the fourth attempt at launch of Space Shuttle Atlantis. In their orange launch and entry suits, they are (left to right) Mission Specialists Susan J. Helms, Yury Usachev of Russia, James S. Voss, Mary Ellen Weber, Jeffrey N. Williams, Pilot Scott "Doc" Horowitz, and Commander James D. Halsell Jr. The mission will take the crew to the International Space Station to deliver logistics and supplies and to prepare the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk and will reboost the space station from 230 statute miles to 250 statute miles. This will be the third assembly flight to the Space Station. Liftoff of Space Shuttle Atlantis for the 10-day mission is scheduled for about 6:11 a.m. EDT from Launch Pad 39A. Landing is targeted for May 29 at 2:19 a.m. EDT. |
| Date |
05.19.2000 |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
STS-116 Shuttle Mission Imagery |
|
| General Description |
STS-116 Shuttle Mission Imagery |
|
| General Description |
STS-116 Shuttle Mission Imagery |
|
| General Description |
STS-116 Shuttle Mission Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility Bay 1, STS-88 Mission Specialists (left to right) Jerry L. Ross, Sergei Krikalev, a cosmonaut from Russia, and James H. Newman examine equipment that will be on the Space Shuttle Endeavour during their upcoming flight. Launch of Mission STS-88 is targeted for Dec. 3, 1998. The STS-88 crew members are participating in a Crew Equipment Interface Test (CEIT), familiarizing themselves with the orbiter's midbody and crew compartments. Other crew members are Commander Robert D. Cabana, Pilot Frederick W. "Rick" Sturckow and Mission Specialist Nancy J. Currie. STS-88 will be the first Space Shuttle launch for assembly of the International Space Station (ISS). The primary payload is the Unity connecting module which will be mated to the Russian-built Zarya control module, expected to be already on orbit after a November launch from Russia. The first major U.S.-built component of ISS, Unity will serve as a connecting passageway to living and working areas of the space station. Unity has two attached pressurized mating adapters (PMAs) and one stowage rack installed inside. PMA-1 provides the permanent connection point between Unity and Zarya, PMA-2 will serve as a Space Shuttle docking port. Zarya is a self-supporting active vehicle, providing propulsive control capability and power during the early assembly stages. It also has fuel storage capability |
| Release Date |
10/03/1998 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- Inside the Orbiter Processing Facility Bay 1, STS-88 Mission Specialists Sergei Krikalev (left), a Russian cosmonaut, and James H. Newman look over equipment for their upcoming flight. The STS-88 crew members are participating in a Crew Equipment Interface Test (CEIT), familiarizing themselves with the orbiter's midbody and crew compartments. Targeted for liftoff on Dec. 3, 1998, STS-88 will be the first Space Shuttle launch for assembly of the International Space Station (ISS). The primary payload is the Unity connecting module which will be mated to the Russian-built Zarya control module, expected to be already on orbit after a November launch from Russia. The first major U.S.-built component of ISS, Unity will serve as a connecting passageway to living and working areas of the space station. Unity has two attached pressurized mating adapters (PMAs) and one stowage rack installed inside. PMA-1 provides the permanent connection point between Unity and Zarya, PMA-2 will serve as a Space Shuttle docking port. Zarya is a self-supporting active vehicle, providing propulsive control capability and power during the early assembly stages. It also has fuel storage capability |
| Release Date |
10/03/1998 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- As the bucket operator (left) lowers them into the open payload bay of the orbiter Endeavour, STS-88 Mission Specialists Jerry L. Ross (second from left) and James H. Newman (second from right) do a sharp-edge inspection. At their right is Wayne Wedlake, with United Space Alliance at Johnson Space Center. Below them is the Orbiter Docking System, the remote manipulator system arm and a tunnel into the payload bay. The STS-88 crew members are participating in a Crew Equipment Interface Test (CEIT), familiarizing themselves with the orbiter's midbody and crew compartments. Targeted for liftoff on Dec. 3, 1998, STS-88 will be the first Space Shuttle launch for assembly of the International Space Station (ISS). The primary payload is the Unity connecting module which will be mated to the Russian-built Zarya control module, expected to be already on orbit after a November launch from Russia. After the mating, Ross and Newman are scheduled to perform three spacewalks to connect power, data and utility lines and install exterior equipment. The first major U.S.-built component of ISS, Unity will serve as a connecting passageway to living and working areas of the space station. Unity has two attached pressurized mating adapters (PMAs) and one stowage rack installed inside. PMA-1 provides the permanent connection point between Unity and Zarya, PMA-2 will serve as a Space Shuttle docking port. Zarya is a self-supporting active vehicle, providing propulsive control capability and power during the early assembly stages. It also has fuel storage capability |
| Release Date |
10/03/1998 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, STS-88 Mission Specialists Sergei Krikalev (left), a Russian cosmonaut, James H. Newman (center), and Jerry L. Ross conduct a sharp-edge inspection of the Unity connecting module, which is the primary payload on their upcoming mission. The STS-88 crew members are participating in a Crew Equipment Interface Test (CEIT), familiarizing themselves with the orbiter's midbody and crew compartments. Targeted for liftoff on Dec. 3, 1998, STS-88 will be the first Space Shuttle launch for assembly of the International Space Station (ISS). The primary payload is the Unity connecting module which will be mated to the Russian-built Zarya control module, expected to be already on orbit after a November launch from Russia. The first major U.S.-built component of ISS, Unity will serve as a connecting passageway to living and working areas of the space station. Unity has two attached pressurized mating adapters (PMAs) and one stowage rack installed inside. PMA-1 provides the permanent connection point between Unity and Zarya, PMA-2 will serve as a Space Shuttle docking port. Zarya is a self-supporting active vehicle, providing propulsive control capability and power during the early assembly stages. It also has fuel storage capability |
| Release Date |
10/03/1998 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- Inside the payload bay of Space Shuttle orbiter Endeavour, workers and STS-88 crew members on a movable work platform or bucket move closer to the rear of the orbiter's crew compartment. While Endeavour is being prepared for flight inside Orbiter Processing Facility Bay 1, the STS-88 crew members are participating in a Crew Equipment Interface Test (CEIT) to familiarize themselves with the orbiter's midbody and crew compartments. A KSC worker (left) maneuvers the platform to give Mission Specialists Jerry L. Ross and James H. Newman (right) a closer look. Looking on is Wayne Wedlake of United Space Alliance at Johnson Space Center. Targeted for liftoff on Dec. 3, 1998, STS-88 will be the first Space Shuttle launch for assembly of the International Space Station (ISS). The primary payload is the Unity connecting module which will be mated to the Russian-built Zarya control module, expected to be already on orbit after a November launch from Russia. After the mating, Ross and Newman are scheduled to perform three spacewalks to connect power, data and utility lines and install exterior equipment. The first major U.S.-built component of ISS, Unity will serve as a connecting passageway to living and working areas of the space station. Unity has two attached pressurized mating adapters (PMAs) and one stowage rack installed inside. PMA-1 provides the permanent connection point between Unity and Zarya, PMA-2 will serve as a Space Shuttle docking port. Zarya is a self-supporting active vehicle, providing propulsive control capability and power during the early assembly stages. It also has fuel storage capability |
| Release Date |
10/03/1998 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- Inside the payload bay of Space Shuttle orbiter Endeavour in Orbiter Processing Facility Bay 1, STS-88 Mission Specialists Jerry L. Ross (crouching at left) and James H. Newman (far right) get a close look at equipment. Looking on is Wayne Wedlake (far left), with United Space Alliance at Johnson Space Center, and a KSC worker (behind Newman) who is operating the movable work platform or bucket. The STS-88 crew members are participating in a Crew Equipment Interface Test (CEIT), familiarizing themselves with the orbiter's midbody and crew compartments. Targeted for liftoff on Dec. 3, 1998, STS-88 will be the first Space Shuttle launch for assembly of the International Space Station (ISS). The primary payload is the Unity connecting module which will be mated to the Russian-built Zarya control module, expected to be already on orbit after a November launch from Russia. After the mating, Ross and Newman are scheduled to perform three spacewalks to connect power, data and utility lines and install exterior equipment. The first major U.S.-built component of ISS, Unity will serve as a connecting passageway to living and working areas of the space station. Unity has two attached pressurized mating adapters (PMAs) and one stowage rack installed inside. PMA-1 provides the permanent connection point between Unity and Zarya, PMA-2 will serve as a Space Shuttle docking port. Zarya is a self-supporting active vehicle, providing propulsive control capability and power during the early assembly stages. It also has fuel storage capability |
| Release Date |
10/03/1998 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- Clad in their blue flight suits, STS-88 Mission Specialists (from left) Sergei Krikalev, a cosmonaut from Russia, Jerry L. Ross, and James H. Newman examine equipment from a toolbox that will be on the Space Shuttle Endeavour during their flight. Talking to Ross is Wayne Wedlake of United Space Alliance at Johnson Space Center, while Henry Thacker (facing camera), of Flight Crew Systems at KSC, looks on. Launch of mission STS-88 is targeted for Dec. 3, 1998. The STS-88 crew members are participating in a Crew Equipment Interface Test (CEIT) in the Orbiter Processing Facility Bay 1 to familiarize themselves with the orbiter's midbody and crew compartments. STS-88 will be the first Space Shuttle launch for assembly of the International Space Station (ISS). The primary payload is the Unity connecting module which will be mated to the Russian-built Zarya control module, expected to be already on orbit after a November launch from Russia. The first major U.S.-built component of ISS, Unity will serve as a connecting passageway to living and working areas of the space station. Unity has two attached pressurized mating adapters (PMAs) and one stowage rack installed inside. PMA-1 provides the permanent connection point between Unity and Zarya, PMA-2 will serve as a Space Shuttle docking port. Zarya is a self-supporting active vehicle, providing propulsive control capability and power during the early assembly stages. It also has fuel storage capability |
| Release Date |
10/03/1998 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility Bay 1, STS-88 Mission Specialists Sergei Krikalev (left), a cosmonaut from Russia, and Jerry L. Ross examine equipment that will be aboard Space Shuttle Endeavour. Launch of mission STS-88 is targeted for Dec. 3, 1998. The STS-88 crew members are participating in a Crew Equipment Interface Test (CEIT), familiarizing themselves with the orbiter's midbody and crew compartments. Other crew members are Commander Robert D. Cabana, Pilot Frederick W. "Rick" Sturckow and Mission Specialists Nancy J. Currie and James H. Newman. STS-88 will be the first Space Shuttle launch for assembly of the International Space Station (ISS). The primary payload is the Unity connecting module which will be mated to the Russian-built Zarya control module, expected to be already on orbit after a November launch from Russia. The first major U.S.-built component of ISS, Unity will serve as a connecting passageway to living and working areas of the space station. Unity has two attached pressurized mating adapters (PMAs) and one stowage rack installed inside. PMA-1 provides the permanent connection point between Unity and Zarya, PMA-2 will serve as a Space Shuttle docking port. Zarya is a self-supporting active vehicle, providing propulsive control capability and power during the early assembly stages. It also has fuel storage capability |
| Release Date |
10/03/1998 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- Inside the payload bay of orbiter Endeavour in the Orbiter Processing Facility Bay 1, STS-88 Mission Specialists Jerry L. Ross (left) and James H. Newman (right foreground) get a close look at the Orbiter Docking System. The STS-88 crew members are participating in a Crew Equipment Interface Test (CEIT), familiarizing themselves with the orbiter's midbody and crew compartments. Targeted for liftoff on Dec. 3, 1998, STS-88 will be the first Space Shuttle launch for assembly of the International Space Station (ISS). The primary payload is the Unity connecting module which will be mated to the Russian-built Zarya control module, expected to be already on orbit after a November launch from Russia. While on orbit during STS-88, Unity will be latched atop the Orbiter Docking System in the forward section of Endeavour's payload bay for the mating of the two modules. After the mating, Ross and Newman are scheduled to perform three spacewalks to connect power, data and utility lines and install exterior equipment. The first major U.S.-built component of ISS, Unity will serve as a connecting passageway to living and working areas of the space station. Unity has two attached pressurized mating adapters (PMAs) and one stowage rack installed inside. PMA-1 provides the permanent connection point between Unity and Zarya, PMA-2 will serve as a Space Shuttle docking port. Zarya is a self-supporting active vehicle, providing propulsive control capability and power during the early assembly stages. It also has fuel storage capability |
| Release Date |
10/03/1998 |
|
|