|
|
Browse All
:
International Space Station (ISS) and Zvezda of Washington, D.C.
|
Printer Friendly |
STS-116 Launch
| Name of Image |
STS-116 Launch |
| Date of Image |
2006-12-09 |
| Full Description |
Against a black night sky, the Space Shuttle Discovery and its seven-member crew head toward Earth-orbit and a scheduled linkup with the International Space Station (ISS). Liftoff from the Kennedy Space Center's launch pad 39B occurred at 8:47 p.m. (EST) on Dec. 9, 2006 in what was the first evening shuttle launch since 2002. The primary mission objective was to deliver and install the P5 truss element. The P5 installation was conducted during the first of three space walks, and involved use of both the shuttle and station?s robotic arms. The remainder of the mission included a major reconfiguration and activation of the ISS electrical and thermal control systems, as well as delivery of Zvezda Service Module debris panels, which will increase ISS protection from potential impacts of micro-meteorites and orbital debris. Two major payloads developed at the Marshall Space Flight Center (MSFC) were also delivered to the Station. The Lab-On-A Chip Application Development Portable Test System (LOCAD-PTS) and the Water Delivery System, a vital component of the Station?s Oxygen Generation System. |
|
STS-116 Launch
| Name of Image |
STS-116 Launch |
| Date of Image |
2006-12-09 |
| Full Description |
Against a black night sky, the Space Shuttle Discovery and its seven-member crew head toward Earth-orbit and a scheduled linkup with the International Space Station (ISS). Liftoff from the Kennedy Space Center's launch pad 39B occurred at 8:47 p.m. (EST) on Dec. 9, 2006 in what was the first evening shuttle launch since 2002. The primary mission objective was to deliver and install the P5 truss element. The P5 installation was conducted during the first of three space walks, and involved use of both the shuttle and station?s robotic arms. The remainder of the mission included a major reconfiguration and activation of the ISS electrical and thermal control systems, as well as delivery of Zvezda Service Module debris panels, which will increase ISS protection from potential impacts of micro-meteorites and orbital debris. Two major payloads developed at the Marshall Space Flight Center (MSFC) were also delivered to the Station. The Lab-On-A Chip Application Development Portable Test System (LOCAD-PTS) and the Water Delivery System, a vital component of the Station?s Oxygen Generation System. |
|
STS-116 Launch
| Name of Image |
STS-116 Launch |
| Date of Image |
2006-12-09 |
| Full Description |
Against a black night sky, the Space Shuttle Discovery and its seven-member crew head toward Earth-orbit and a scheduled linkup with the International Space Station (ISS). Liftoff from the Kennedy Space Center's launch pad 39B occurred at 8:47 p.m. (EST) on Dec. 9, 2006 in what was the first evening shuttle launch since 2002. The primary mission objective was to deliver and install the P5 truss element. The P5 installation was conducted during the first of three space walks, and involved use of both the shuttle and station?s robotic arms. The remainder of the mission included a major reconfiguration and activation of the ISS electrical and thermal control systems, as well as delivery of Zvezda Service Module debris panels, which will increase ISS protection from potential impacts of micro-meteorites and orbital debris. Two major payloads developed at the Marshall Space Flight Center (MSFC) were also delivered to the Station. The Lab-On-A Chip Application Development Portable Test System (LOCAD-PTS) and the Water Delivery System, a vital component of the Station?s Oxygen Generation System. |
|
Approaching the Internationa
| Title |
Approaching the International Space Station |
| Explanation |
Last Monday the crew of Space Shuttle Atlantis [ http://www.ksc.nasa.gov/shuttle/resources/orbiters/atlantis.html ] took in this view [ http://spaceflight.nasa.gov/gallery/images/shuttle/sts-106/html/s106e5056.html ] as they approached the developing International Space Station [ http://spaceflight.nasa.gov/station/reference/faq/index.html ] (ISS). From top to bottom, the astronauts saw a station currently consisting of the Progress supply module, the Zvezda service module [ http://www.shuttlepresskit.com/ISS_OVR/assembly2_overview.htm ], the Zarya cargo module [ http://www.shuttlepresskit.com/ISS_OVR/element1.htm ], and the Unity connecting module [ http://www.shuttlepresskit.com/ISS_OVR/element2.htm ]. Never before had astronauts seen the station since the remote-controlled additions of Progress [ http://www.space.com/missionlaunches/launches/progress_prelaunch_000805.html ] and Zvezda [ http://antwrp.gsfc.nasa.gov/apod/ap000718.html ]. Energy collecting flat solar panels [ http://www.qrg.nwu.edu/projects/vss/docs/Power/1-what-are-solar-panels.html ] can be seen extending from some of the modules. Soon after this picture was taken, Atlantis docked with the ISS [ http://www.shuttlepresskit.com/ISS_OVR/ ] at the Unity [ http://spaceflight.nasa.gov/gallery/images/shuttle/sts-106/html/s106e5061.html ] end. The astronauts have worked hard [ http://www.shuttlepresskit.com/STS-106/index.htm ] unloading supplies, installing and testing equipment, and even planning to reboost the floating space station [ http://antwrp.gsfc.nasa.gov/apod/ap990223.html ] to a higher orbit. The Shuttle and its entire crew are scheduled to return to Earth Wednesday. The Space Shuttle Discovery [ http://www.ksc.nasa.gov/shuttle/resources/orbiters/discovery.html ] is then scheduled to visit [ http://spaceflight.nasa.gov/shuttle/archives/sts-92/index.html ] the ISS in two weeks. |
|
STS-101 crew heads for Astro
| Title |
STS-101 crew heads for Astrovan and trip to launch pad |
| Description |
The STS-101 crew show their joy and eagerness to begin their mission as they had to the Astrovan for the trip to Launch Pad 39A and the fourth attempt at launch of Space Shuttle Atlantis. In their orange launch and entry suits, they are (left to right) Mission Specialists Susan J. Helms, Yury Usachev of Russia, James S. Voss, Mary Ellen Weber, Jeffrey N. Williams, Pilot Scott "Doc" Horowitz, and Commander James D. Halsell Jr. The mission will take the crew to the International Space Station to deliver logistics and supplies and to prepare the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk and will reboost the space station from 230 statute miles to 250 statute miles. This will be the third assembly flight to the Space Station. Liftoff of Space Shuttle Atlantis for the 10-day mission is scheduled for about 6:11 a.m. EDT from Launch Pad 39A. Landing is targeted for May 29 at 2:19 a.m. EDT. |
| Date |
05.19.2000 |
|
STS-101 SPACEHAB Double Modu
| Title |
STS-101 SPACEHAB Double Module ready for transfer to payload canister |
| Description |
After being uncrated in the Space Station Processing Facility, the SPACEHAB Double Module (left) waits for transfer to the payload canister (right) that will take it to Launch Pad 39A. There it will be installed in the Shuttle Atlantis' payload bay for mission STS-101. The module carries internal logistics and resupply cargo for restoring full redundancy to the International Space Station power system in preparation for the arrival of the next pressurized module, the Russian-built Zvezda. The STS-101 crew of seven comprises Commander James D. Halsell Jr., Pilot Scott J. "Doc" Horowitz (Ph.D.) and Mission Specialists Mary Ellen Weber (Ph.D.), James S. Voss, Jeffrey N. Williams, Susan J. Helms and Yuri Vladimirovich Usachev, cosmonaut. Launch of Atlantis on mission STS-101 is scheduled no earlier than April 17, 2000. |
| Date |
03.15.2000 |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
STS-116 Shuttle Mission Imagery |
|
| General Description |
STS-116 Shuttle Mission Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
STS-116 Shuttle Mission Imagery |
|
| General Description |
STS-116 Shuttle Mission Imagery |
|
| General Description |
STS-116 Shuttle Mission Imagery |
|
| General Description |
STS-97 Shuttle Mission Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
A Russian 3-stage Proton roc
| Description |
A Russian 3-stage Proton rocket blasts into the sky at 12:56 a.m. EDT with the Russian-built Zvezda module in a successful launch from Baikonur Cosmodrome, Kazakhstan. Zvezda is the primary Russian contribution to the International Space Station, serving as the early Station living quarters. It will also provide early propulsive attitude control and reboost capabilities and be the main docking port for Russian Progress cargo resupply vehicles. The third Station component, Zvezda will dock by remote control with the already orbiting Zarya and Unity modules at an altitude of about 245 by 230 statute miles. "(Image taken with Nikon D1 digital camera.) |
| Release Date |
07/12/2000 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- At SPACEHAB, in Titusville, Fla., STS-101 crew members take part in a Crew Equipment Interface Test (CEIT). Here they are checking out the SPACEHAB Logistics Double Module. The crew is composed of Commander James Donald Halsell Jr., Pilot Scott J. "Doc" Horowitz (Ph.D.), and Mission Specialists Mary Ellen Weber (Ph.D.), Edward Tsang Lu (Ph.D.), Jeffrey N. Williams, and Yuri Malenchenko and Boris W. Morukov, who are with the Russian Space Agency. The primary objective of the STS-101 mission is to complete the initial outfitting of the International Space Station, making it fully ready for the first long-term crew. The seven-member crew will transfer almost two tons of equipment and supplies from SPACEHAB. Additionally, they will unpack a shipment of supplies delivered earlier by a Russian Progress space tug and begin outfitting the newly arrived Zvezda Service Module. Three astronauts will perform two space walks to transfer and install parts of the Russian Strela cargo boom that are attached to SPACEHAB's Integrated Cargo Container, connect utility cables between Zarya and Zvezda, and install a magnetometer/pole assembly on the Service Module. Additional activities for the STS-101 astronauts include working with the Space Experiment Module (SEM-06) and the Mission to America's Remarkable Schools (MARS), two educational initiatives. STS-101 is scheduled for launch no earlier than March 16, 2000 |
| Release Date |
12/10/1999 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- At SPACEHAB, in Titusville, Fla., STS-101 Mission Specialists Edward Tsang Lu (Ph.D.), Mary Ellen Weber (Ph.D.) and Boris W. Morukov, who is with the Russian Space Agency (RSA), stand inside the SPACEHAB Logistics Double Module, part of the payload for their mission. They and other crew members Commander James Donald Halsell Jr., Pilot Scott J. "Doc" Horowitz (Ph.D.), and Mission Specialists Jeffrey N. Williams, and Yuri Malenchenko (also with RSA), are taking part in a Crew Equipment Interface Test. The primary objective of the STS-101 mission is to complete the initial outfitting of the International Space Station, making it fully ready for the first long-term crew. The seven-member crew will transfer almost two tons of equipment and supplies from SPACEHAB. Additionally, they will unpack a shipment of supplies delivered earlier by a Russian Progress space tug and begin outfitting the newly arrived Zvezda Service Module. Three astronauts will perform two space walks to transfer and install parts of the Russian Strela cargo boom that are attached to SPACEHAB's Integrated Cargo Container, connect utility cables between Zarya and Zvezda, and install a magnetometer/pole assembly on the Service Module. Additional activities for the STS-101 astronauts include working with the Space Experiment Module (SEM-06) and the Mission to America's Remarkable Schools (MARS), two educational initiatives. STS-101 is scheduled for launch no earlier than March 16, 2000 |
| Release Date |
12/10/1999 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- During a Crew Equipment Interface Test (CEIT) at SPACEHAB, in Titusville, Fla., STS-101 crew members check out the SPACEHAB Logistics Double Module that will be part of the payload for their mission. From left are Pilot Scott J. "Doc" Horowitz (Ph.D.), and Mission Specialists Edward Tsang Lu (Ph.D.) and Mary Ellen Weber (Ph.D.). Other crew members taking part in the CEIT are Commander James Donald Halsell Jr., Jeffrey N. Williams, and Yuri Malenchenko and Boris W. Morukov, who are with the Russian Space Agency. The primary objective of the STS-101 mission is to complete the initial outfitting of the International Space Station, making it fully ready for the first long-term crew. The seven-member crew will transfer almost two tons of equipment and supplies from SPACEHAB. Additionally, they will unpack a shipment of supplies delivered earlier by a Russian Progress space tug and begin outfitting the newly arrived Zvezda Service Module. Three astronauts will perform two space walks to transfer and install parts of the Russian Strela cargo boom that are attached to SPACEHAB's Integrated Cargo Container, connect utility cables between Zarya and Zvezda, and install a magnetometer/pole assembly on the Service Module. Additional activities for the STS-101 astronauts include working with the Space Experiment Module (SEM-06) and the Mission to America's Remarkable Schools (MARS), two educational initiatives. STS-101 is scheduled for launch no earlier than March 16, 2000 |
| Release Date |
12/10/1999 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- During a Crew Equipment Interface Test (CEIT) at SPACEHAB, in Titusville, Fla., STS-101 crew members check out the SPACEHAB Logistics Double Module that will be part of the payload for their mission. The crew is composed of Commander James Donald Halsell Jr., Pilot Scott J. "Doc" Horowitz (Ph.D.), and Mission Specialists Mary Ellen Weber (Ph.D.), Edward Tsang Lu (Ph.D.), Jeffrey N. Williams, and Yuri Malenchenko and Boris W. Morukov, who are with the Russian Space Agency. The primary objective of the STS-101 mission is to complete the initial outfitting of the International Space Station, making it fully ready for the first long-term crew. The seven-member crew will transfer almost two tons of equipment and supplies from SPACEHAB. Additionally, they will unpack a shipment of supplies delivered earlier by a Russian Progress space tug and begin outfitting the newly arrived Zvezda Service Module. Three astronauts will perform two space walks to transfer and install parts of the Russian Strela cargo boom that are attached to SPACEHAB's Integrated Cargo Container, connect utility cables between Zarya and Zvezda, and install a magnetometer/pole assembly on the Service Module. Additional activities for the STS-101 astronauts include working with the Space Experiment Module (SEM-06) and the Mission to America's Remarkable Schools (MARS), two educational initiatives. STS-101 is scheduled for launch no earlier than March 16, 2000 |
| Release Date |
12/10/1999 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- During a Crew Equipment Interface Test (CEIT) at SPACEHAB, in Titusville, Fla., STS-101 crew members check out the SPACEHAB Logistics Double Module that will be part of the payload for their mission. At right is Mission Specialist Mary Ellen Weber (Ph.D.), who is assisted by a SPACEHAB worker. Other crew members taking part in the CEIT are Commander James Donald Halsell Jr., Pilot Scott J. "Doc" Horowitz (Ph.D.), and Mission Specialists Edward Tsang Lu (Ph.D.), Jeffrey N. Williams, and Yuri Malenchenko and Boris W. Morukov, who are with the Russian Space Agency. The primary objective of the STS-101 mission is to complete the initial outfitting of the International Space Station, making it fully ready for the first long-term crew. The seven-member crew will transfer almost two tons of equipment and supplies from SPACEHAB. Additionally, they will unpack a shipment of supplies delivered earlier by a Russian Progress space tug and begin outfitting the newly arrived Zvezda Service Module. Three astronauts will perform two space walks to transfer and install parts of the Russian Strela cargo boom that are attached to SPACEHAB's Integrated Cargo Container, connect utility cables between Zarya and Zvezda, and install a magnetometer/pole assembly on the Service Module. Additional activities for the STS-101 astronauts include working with the Space Experiment Module (SEM-06) and the Mission to America's Remarkable Schools (MARS), two educational initiatives. STS-101 is scheduled for launch no earlier than March 16, 2000 |
| Release Date |
12/10/1999 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- At SPACEHAB, in Titusville, Fla., STS-101 crew members take part in a Crew Equipment Interface Test (CEIT). Here they are checking out the SPACEHAB Logistics Double Module. The crew is composed of Commander James Donald Halsell Jr., Pilot Scott J. "Doc" Horowitz (Ph.D.), and Mission Specialists Mary Ellen Weber (Ph.D.), Edward Tsang Lu (Ph.D.), Jeffrey N. Williams, and Yuri Malenchenko and Boris W. Morukov, who are with the Russian Space Agency. The primary objective of the STS-101 mission is to complete the initial outfitting of the International Space Station, making it fully ready for the first long-term crew. The seven-member crew will transfer almost two tons of equipment and supplies from SPACEHAB. Additionally, they will unpack a shipment of supplies delivered earlier by a Russian Progress space tug and begin outfitting the newly arrived Zvezda Service Module. Three astronauts will perform two space walks to transfer and install parts of the Russian Strela cargo boom that are attached to SPACEHAB's Integrated Cargo Container, connect utility cables between Zarya and Zvezda, and install a magnetometer/pole assembly on the Service Module. Additional activities for the STS-101 astronauts include working with the Space Experiment Module (SEM-06) and the Mission to America's Remarkable Schools (MARS), two educational initiatives. STS-101 is scheduled for launch no earlier than March 16, 2000 |
| Release Date |
12/10/1999 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- During a Crew Equipment Interface Test (CEIT) at SPACEHAB, in Titusville, Fla., STS-101 crew members check out the SPACEHAB Logistics Double Module that will be part of the payload for their mission. From left are Commander James Donald Halsell Jr., Mission Specialist Mary Ellen Weber, (Ph.D.), Pilot Scott J. "Doc" Horowitz (Ph.D.), and Mission Specialist Edward Tsang Lu (Ph.D.). Other crew members who are taking part in the CEIT are Mission Specialists Jeffrey N. Williams, and Boris W. Morukov and Yuri Malenchenko, who are with the Russian Space Agency. The primary objective of the STS-101 mission is to complete the initial outfitting of the International Space Station, making it fully ready for the first long-term crew. The seven-member crew will transfer almost two tons of equipment and supplies from SPACEHAB. Additionally, they will unpack a shipment of supplies delivered earlier by a Russian Progress space tug and begin outfitting the newly arrived Zvezda Service Module. Three astronauts will perform two space walks to transfer and install parts of the Russian Strela cargo boom that are attached to SPACEHAB's Integrated Cargo Container, connect utility cables between Zarya and Zvezda, and install a magnetometer/pole assembly on the Service Module. Additional activities for the STS-101 astronauts include working with the Space Experiment Module (SEM-06) and the Mission to America's Remarkable Schools (MARS), two educational initiatives. STS-101 is scheduled for launch no earlier than March 16, 2000 |
| Release Date |
12/10/1999 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- At SPACEHAB, in Titusville, Fla., STS-101 crew members take part in a Crew Equipment Interface Test (CEIT). Here checking out the SPACEHAB Logistics Double Module are (left) Mission Specialists Mary Ellen Weber (Ph.D.), and (right) Edward Tsang Lu (Ph.D.). Other members of the crew taking part in the CEIT are Commander James Donald Halsell Jr., Pilot Scott J. "Doc" Horowitz (Ph.D.), and Mission Specialists Jeffrey N. Williams, and Yuri Malenchenko and Boris W. Morukov, who are with the Russian Space Agency. The primary objective of the STS-101 mission is to complete the initial outfitting of the International Space Station, making it fully ready for the first long-term crew. The seven-member crew will transfer almost two tons of equipment and supplies from SPACEHAB. Additionally, they will unpack a shipment of supplies delivered earlier by a Russian Progress space tug and begin outfitting the newly arrived Zvezda Service Module. Three astronauts will perform two space walks to transfer and install parts of the Russian Strela cargo boom that are attached to SPACEHAB's Integrated Cargo Container, connect utility cables between Zarya and Zvezda, and install a magnetometer/pole assembly on the Service Module. Additional activities for the STS-101 astronauts include working with the Space Experiment Module (SEM-06) and the Mission to America's Remarkable Schools (MARS), two educational initiatives. STS-101 is scheduled for launch no earlier than March 16, 2000 |
| Release Date |
12/10/1999 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- During a Crew Equipment Interface Test (CEIT) at SPACEHAB, in Titusville, Fla., STS-101 crew members check out the SPACEHAB Logistics Double Module that will be part of the payload for their mission. At left are Commander James Donald Halsell Jr. and Pilot Scott J. "Doc" Horowitz (Ph.D.), seated on the floor is Mission Specialist Edward Tsang Lu (Ph.D.). Other crew members who are taking part in the CEIT are Mission Specialists Mary Ellen Weber, (Ph.D.), Jeffrey N. Williams, and Boris W. Morukov and Yuri Malenchenko, who are with the Russian Space Agency. The primary objective of the STS-101 mission is to complete the initial outfitting of the International Space Station, making it fully ready for the first long-term crew. The seven-member crew will transfer almost two tons of equipment and supplies from SPACEHAB. Additionally, they will unpack a shipment of supplies delivered earlier by a Russian Progress space tug and begin outfitting the newly arrived Zvezda Service Module. Three astronauts will perform two space walks to transfer and install parts of the Russian Strela cargo boom that are attached to SPACEHAB's Integrated Cargo Container, connect utility cables between Zarya and Zvezda, and install a magnetometer/pole assembly on the Service Module. Additional activities for the STS-101 astronauts include working with the Space Experiment Module (SEM-06) and the Mission to America's Remarkable Schools (MARS), two educational initiatives. STS-101 is scheduled for launch no earlier than March 16, 2000 |
| Release Date |
12/10/1999 |
|
|