|
|
Browse All
:
International Space Station (ISS) and Zvezda and Space Shuttle Orbiter
|
Printer Friendly |
JSC1834_ISS_Animation_Resour
INTERNATIONAL SPACE STATION
2000
| Description |
INTERNATIONAL SPACE STATION (ISS) ANIMATION RESOURCE REEL - JUNE 2000 JSC1834 (2000) 22 3/4 Minutes This video resource reel contains the latest animation of the International Space Station. The tape begins with a sequence illustrating a space shuttle docking with the complete station, and then continues with station fly-around views and scenes showing key elements of construction of the station. Also contains detailed animation of the Zvezda Service Module, shown first launching into space on a Proton rocket, activating solar arrays and then being docked to by the space station. Also included: animation of the first station crew arriving, the space station robot arm, solar arrays tracking the sun, and close-up views of modules representing the different participating countries. The video concludes with a step-by-step animation depicting the assembly of the station (Rev E assembly sequence). |
| Date |
2000 |
|
STS-116 Crew Portrait
| Name of Image |
STS-116 Crew Portrait |
| Date of Image |
2006-07-21 |
| Full Description |
This is the STS-116 Crew Portrait. Pictured on the front row from left to right are: William Oefelein, pilot, Joan Higginbotham, mission specialist, and Mark Polansky, commander. On the back row, left to right, are: Robert Curbeam, Nicholas Patrick, Sunita Williams, and the European Space Agency?s Christer Fuglesang, all mission specialists. Williams joined Expedition 14 in progress to serve as flight engineer aboard the International Space Station (ISS). Launched aboard the Space Shuttle Discovery on December 9, 2006, the seven delivered two high profile Marshall Space Flight Center (MSFC?) payloads: The Lab-On-A Chip Application Development Portable Test System (LOCAD-PTS) and the Water Delivery System, a vital component of the Station?s Oxygen Generation System. The primary mission objective was to deliver and install the P5 truss element. The P5 installation was conducted during the first of three space walks, and involved use of both the shuttle and station?s robotic arms. The remainder of the mission included a major reconfiguration and activation of the ISS electrical and thermal control systems, as well as delivery of Zvezda Service Module debris panels, which will increase ISS protection from potential impacts of micro-meteorites and orbital debris. |
|
STS-116 Launch
| Name of Image |
STS-116 Launch |
| Date of Image |
2006-12-09 |
| Full Description |
Against a black night sky, the Space Shuttle Discovery and its seven-member crew head toward Earth-orbit and a scheduled linkup with the International Space Station (ISS). Liftoff from the Kennedy Space Center's launch pad 39B occurred at 8:47 p.m. (EST) on Dec. 9, 2006 in what was the first evening shuttle launch since 2002. The primary mission objective was to deliver and install the P5 truss element. The P5 installation was conducted during the first of three space walks, and involved use of both the shuttle and station?s robotic arms. The remainder of the mission included a major reconfiguration and activation of the ISS electrical and thermal control systems, as well as delivery of Zvezda Service Module debris panels, which will increase ISS protection from potential impacts of micro-meteorites and orbital debris. Two major payloads developed at the Marshall Space Flight Center (MSFC) were also delivered to the Station. The Lab-On-A Chip Application Development Portable Test System (LOCAD-PTS) and the Water Delivery System, a vital component of the Station?s Oxygen Generation System. |
|
STS-116 Launch
| Name of Image |
STS-116 Launch |
| Date of Image |
2006-12-09 |
| Full Description |
Against a black night sky, the Space Shuttle Discovery and its seven-member crew head toward Earth-orbit and a scheduled linkup with the International Space Station (ISS). Liftoff from the Kennedy Space Center's launch pad 39B occurred at 8:47 p.m. (EST) on Dec. 9, 2006 in what was the first evening shuttle launch since 2002. The primary mission objective was to deliver and install the P5 truss element. The P5 installation was conducted during the first of three space walks, and involved use of both the shuttle and station?s robotic arms. The remainder of the mission included a major reconfiguration and activation of the ISS electrical and thermal control systems, as well as delivery of Zvezda Service Module debris panels, which will increase ISS protection from potential impacts of micro-meteorites and orbital debris. Two major payloads developed at the Marshall Space Flight Center (MSFC) were also delivered to the Station. The Lab-On-A Chip Application Development Portable Test System (LOCAD-PTS) and the Water Delivery System, a vital component of the Station?s Oxygen Generation System. |
|
STS-116 Launch
| Name of Image |
STS-116 Launch |
| Date of Image |
2006-12-09 |
| Full Description |
Against a black night sky, the Space Shuttle Discovery and its seven-member crew head toward Earth-orbit and a scheduled linkup with the International Space Station (ISS). Liftoff from the Kennedy Space Center's launch pad 39B occurred at 8:47 p.m. (EST) on Dec. 9, 2006 in what was the first evening shuttle launch since 2002. The primary mission objective was to deliver and install the P5 truss element. The P5 installation was conducted during the first of three space walks, and involved use of both the shuttle and station?s robotic arms. The remainder of the mission included a major reconfiguration and activation of the ISS electrical and thermal control systems, as well as delivery of Zvezda Service Module debris panels, which will increase ISS protection from potential impacts of micro-meteorites and orbital debris. Two major payloads developed at the Marshall Space Flight Center (MSFC) were also delivered to the Station. The Lab-On-A Chip Application Development Portable Test System (LOCAD-PTS) and the Water Delivery System, a vital component of the Station?s Oxygen Generation System. |
|
STS-106 Onboard Photograph -
| Name of Image |
STS-106 Onboard Photograph - International Space Station |
| Date of Image |
2000-09-01 |
| Full Description |
This image of the International Space Station (ISS) was taken when Space Shuttle Atlantis (STS-106 mission) approached the ISS for docking. At the top is the Russian Progress supply ship that is linked with the Russian built Service Module or Zvezda. The Zvezda is cornected with the Russian built Functional Cargo Block (FGB) or Zarya. The U.S. built Node 1 or Unity module is seen at the bottom. |
|
STS-97 Onboard Photograph -
| Name of Image |
STS-97 Onboard Photograph - International Space Station |
| Date of Image |
2000-12-01 |
| Full Description |
This image of the International Space Station in orbit was taken from the Space Shuttle Endeavour prior to docking. Most of the Station's components are clearly visible in this photograph. They are the Node 1 or Unity Module docked with the Functional Cargo Block or Zarya (top) that is linked to the Zvezda Service Module. The Soyuz spacecraft is at the bottom. |
|
STS-104 Onboard Photograph-I
| Name of Image |
STS-104 Onboard Photograph-International Space Station |
| Date of Image |
2001-07-01 |
| Full Description |
This International Space Station (ISS) image was taken by the STS-104 crew during a fly-around inspection of the ISS after the installment of the Joint Airlock. The inspection occurred shortly after the orbiter Atlantis undocked from the ISS. The Canadarm2, or Space Station Remote Manipulator System (SSRMS), appears to be pointed toward the newly-installed airlock on the station's starboard side. The STS-104 mission marked the completion of the second phase of the station assembly. Since the begirning in July of 2000, 77 tons of hardware have been added to the complex, including the Russian Zvezda Module, the Z1 Truss Assembly, the Pressurized Mating Adapter 3, the P6 Truss and its 240-foot long solar arrays, the U.S. Laboratory Destiny, the Canadarm2, and finally the Quest Airlock. The launch of the Space Shuttle Orbiter Atlantis, STS-104 mission, occurred on July 21, 2001. |
|
Astronaut James S. Voss Perf
| Name of Image |
Astronaut James S. Voss Performs Tasks in the Destiny Laboratory |
| Date of Image |
2001-05-14 |
| Full Description |
Astronaut James S. Voss, Expedition Two flight engineer, works with a series of cables on the EXPRESS Rack in the United State's Destiny laboratory on the International Space Station (ISS). The EXPRESS Rack is a standardized payload rack system that transports, stores, and supports experiments aboard the ISS. EXPRESS stands for EXpedite the PRocessing of Experiments to the Space Station, reflecting the fact that this system was developed specifically to maximize the Station's research capabilities. The EXPRESS Rack system supports science payloads in several disciplines, including biology, chemistry, physics, ecology, and medicine. With the EXPRESS Rack, getting experiments to space has never been easier or more affordable. With its standardized hardware interfaces and streamlined approach, the EXPRESS Rack enables quick, simple integration of multiple payloads aboard the ISS. The system is comprised of elements that remain on the ISS, as well as elements that travel back and forth between the ISS and Earth via the Space Shuttle. |
|
Cosmonaut Krikalev Views App
| Name of Image |
Cosmonaut Krikalev Views Approaching Space Shuttle Atlantis |
| Date of Image |
2001-02-09 |
| Full Description |
Cosmonaut Sergei K. Krikalev, flight engineer for Expedition One, is positioned by a porthole aboard the Zvezda Service Module of the International Space Station (ISS) as the Space Shuttle Atlantis approaches for docking to begin several days of joint activities between the two crews. Visible through the window are the crew cabin and forward section of the Shuttle amidst scattered clouds above the Western Pacific. The aft part of the cargo bay stowing the Destiny Laboratory is not visible in this scene. |
|
STS-97 and Expedition One Cr
| Name of Image |
STS-97 and Expedition One Crews Pose for Onboard Photo |
| Date of Image |
2000-12-07 |
| Full Description |
In this image, the five STS-97 crew members pose with the 3 members of the Expedition One crew onboard the International Space Station (ISS) for the first ever traditional onboard portrait taken in the Zvezda Service Module. On the front row, left to right, are astronauts Brent W. Jett, Jr., STS-97 commander, William M. Shepherd, Expedition One mission commander, and Joseph R. Tarner, STS-97 mission specialist. On the second row, from the left are Cosmonaut Sergei K. Krikalev, Expedition One flight engineer, astronaut Carlos I. Noriega, STS-97 mission specialist, cosmonaut Yuri P. Gidzenko, Expedition One Soyuz commander, and Michael J. Bloomfield, STS-97 pilot. Behind them is astronaut Marc Garneau, STS-97 mission specialist representing the Canadian Space Agency (CSA). The primary objective of the STS-97 mission was the delivery, assembly, and activation of the U.S. electrical power system onboard the International Space Station (ISS). The electrical power system, which is built into a 73-meter (240-foot) long solar array structure consists of solar arrays, radiators, batteries, and electronics. The entire 15.4-metric ton (17-ton) package is called the P6 Integrated Truss Segment, and is the heaviest and largest element yet delivered to the station aboard a space shuttle. The electrical system will eventually provide the power necessary for the first ISS crews to live and work in the U.S. segment. The STS-97 crew of five launched aboard the Space Shuttle Orbiter Endeavor on November 30, 2000 for an 11 day mission. |
|
STS-92 Mission Insignia
| Name of Image |
STS-92 Mission Insignia |
| Date of Image |
1999-11-08 |
| Full Description |
Designed by the crew members, the STS-92 patch symbolizes the second mission to carry U.S. built elements to the International Space Station (ISS) for assembly. The black silhouette of the Space Shuttle Discovery stands out against the deep blue background of space in low Earth orbit. In the foreground, in gray, is a profile view of the ISS as it appears when the shuttle and crew arrive, with the station consisting of the Unity node, its two Pressurized Mating Adapters (PMA), the Zarya functional cargo block, the Zvezda service module, and the Progress cargo vehicle. Following the shuttle's rendezvous and docking, the ISS configuration now augmented by the two elements delivered by Discovery, the Z1 truss and PMA-3. These two elements, depicted in red, were installed using the shuttle's robot arm and connected to ISS during four space walks. The multinational nature of both the STS-92 crew and the ISS are reflected in the multi-colored Astronaut Office symbol. |
|
STS-106 Crew Portrait
| Name of Image |
STS-106 Crew Portrait |
| Date of Image |
2000-06-08 |
| Full Description |
Five NASA astronauts and two cosmonauts representing the Russian Aviation and Space Agency take a break in training from their scheduled September 2000 visit to the International Space Station (ISS). Astronauts Terrence W. Wilcutt (right front), and Scott D. Altman (left front) are mission commander and pilot, respectively. On the back row (from the left) are mission specialists Boris V. Morukov, cosmonaut, along with astronauts Richard A. Mastracchio, Edward T. Lu, and Daniel C. Burbank, and cosmonaut Yuri I. Malenchenko. Morukov and Malenchenko represent the Russian Aviation and Space Agency. Launched aboard the Space Shuttle Atlantis on September 8, 2000 at 7:46 a.m. (CDT), the STS-106 crew successfully prepared the International Space Station (ISS) for occupancy. Acting as plumbers, movers, installers and electricians, they installed batteries, power converters, a toilet and a treadmill on the outpost. They also delivered more than 2,993 kilograms (6,600 pounds) of supplies. Lu and Malenchenko performed a space walk to connect power, and data and communications cables to the newly arrived Zvezda Service Module and the Station. |
|
STS-101 Mission Insignia
| Name of Image |
STS-101 Mission Insignia |
| Date of Image |
2000-03-08 |
| Full Description |
The STS-101 mission patch commemorates the third Space Shuttle flight supporting the assembly of the International Space Station (ISS). This flight's primary tasks were to outfit the ISS and extend its lifetime, to conduct a space walk to install external components in preparation for the docking of the Russian Service Module, Zvezda, and the arrival of the first ISS crew. The Space Shuttle is depicted in an orbit configuration prior to docking with the ISS. The ISS is depicted in the stage of assembly completed for the STS-101 mission, which consists of the United States built Unity module and the Russian-built Zarya module. The three large stars represent the third ISS mission in the assembly sequence. The elements and colors of the border reflect the flags of the nations represented by the STS-101 crew members, the United States, and Russia. |
|
Approaching the Internationa
| Title |
Approaching the International Space Station |
| Explanation |
Last Monday the crew of Space Shuttle Atlantis [ http://www.ksc.nasa.gov/shuttle/resources/orbiters/atlantis.html ] took in this view [ http://spaceflight.nasa.gov/gallery/images/shuttle/sts-106/html/s106e5056.html ] as they approached the developing International Space Station [ http://spaceflight.nasa.gov/station/reference/faq/index.html ] (ISS). From top to bottom, the astronauts saw a station currently consisting of the Progress supply module, the Zvezda service module [ http://www.shuttlepresskit.com/ISS_OVR/assembly2_overview.htm ], the Zarya cargo module [ http://www.shuttlepresskit.com/ISS_OVR/element1.htm ], and the Unity connecting module [ http://www.shuttlepresskit.com/ISS_OVR/element2.htm ]. Never before had astronauts seen the station since the remote-controlled additions of Progress [ http://www.space.com/missionlaunches/launches/progress_prelaunch_000805.html ] and Zvezda [ http://antwrp.gsfc.nasa.gov/apod/ap000718.html ]. Energy collecting flat solar panels [ http://www.qrg.nwu.edu/projects/vss/docs/Power/1-what-are-solar-panels.html ] can be seen extending from some of the modules. Soon after this picture was taken, Atlantis docked with the ISS [ http://www.shuttlepresskit.com/ISS_OVR/ ] at the Unity [ http://spaceflight.nasa.gov/gallery/images/shuttle/sts-106/html/s106e5061.html ] end. The astronauts have worked hard [ http://www.shuttlepresskit.com/STS-106/index.htm ] unloading supplies, installing and testing equipment, and even planning to reboost the floating space station [ http://antwrp.gsfc.nasa.gov/apod/ap990223.html ] to a higher orbit. The Shuttle and its entire crew are scheduled to return to Earth Wednesday. The Space Shuttle Discovery [ http://www.ksc.nasa.gov/shuttle/resources/orbiters/discovery.html ] is then scheduled to visit [ http://spaceflight.nasa.gov/shuttle/archives/sts-92/index.html ] the ISS in two weeks. |
|
Supply Ship Approaches the S
| Title |
Supply Ship Approaches the Space Station |
| Explanation |
The crew [ http://spaceflight.nasa.gov/station/crew/exp9/ ] on board the International Space Station [ http://spaceflight.nasa.gov/station/index.html ] sometimes needs supplies. As the US Space Shuttle fleet [ http://science.ksc.nasa.gov/shuttle/resources/orbiters/orbiters.html ] prepares to return to flight [ http://www.nasa.gov/news/highlights/returntoflight.html ], supplies usually now come from a robot Progress supply vessel [ http://spaceflight.nasa.gov/station/assembly/elements/progress/index.html ] launched from Kazakhstan [ http://www.cia.gov/cia/publications/factbook/geos/kz.html ]. Pictured above [ http://spaceflight.nasa.gov/gallery/images/station/crew-9/html/iss009e08847.html ], a Progress ship approaches the ISS [ http://antwrp.gsfc.nasa.gov/apod/ap021208.html ] on May 27, delivering over 2,500 kilograms of food, water, fuel and other important items. The supply ship soon docked with the Zvezda Service Module [ http://spaceflight.nasa.gov/station/assembly/elements/sm/index.html ] while orbiting [ http://antwrp.gsfc.nasa.gov/apod/ap010723.html ] the Earth over 300 kilometers over central Asia. |
|
A perfect launch of Atlantis
| Title |
A perfect launch of Atlantis on mission STS-106 |
| Description |
Filling the ground with billows of smoke and steam created by the flaming solid rocket boosters, Space Shuttle Atlantis speeds toward space on mission STS-106. The perfect on-time liftoff occurred at 8:45:47 a.m. EDT. On the 11-day mission to the International Space Station, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbe d is due to arrive at the Station in late fall. Landing of Atlantis is targeted for 4:45 a.m. EDT on Sept. 19. |
| Date |
09.08.2000 |
|
A perfect launch of Atlantis
| Title |
A perfect launch of Atlantis on mission STS-106 |
| Description |
Columns of flame spew from the solid rocket boosters hurling Space Shuttle Atlantis toward space on mission STS-106. The on- time liftoff occurred at 8:45:47 a.m. EDT for the start of an 11- day mission to the International Space Station. While on board, the seven-member crew will perform support tasks, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbe d is due to arrive at the Station in late fall. Landing of Atlantis is targeted for 4:45 a.m. EDT on Sept. 19. |
| Date |
09.08.2000 |
|
STS-101 crew heads for Astro
| Title |
STS-101 crew heads for Astrovan and trip to launch pad |
| Description |
The STS-101 crew show their joy and eagerness to begin their mission as they had to the Astrovan for the trip to Launch Pad 39A and the fourth attempt at launch of Space Shuttle Atlantis. In their orange launch and entry suits, they are (left to right) Mission Specialists Susan J. Helms, Yury Usachev of Russia, James S. Voss, Mary Ellen Weber, Jeffrey N. Williams, Pilot Scott "Doc" Horowitz, and Commander James D. Halsell Jr. The mission will take the crew to the International Space Station to deliver logistics and supplies and to prepare the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk and will reboost the space station from 230 statute miles to 250 statute miles. This will be the third assembly flight to the Space Station. Liftoff of Space Shuttle Atlantis for the 10-day mission is scheduled for about 6:11 a.m. EDT from Launch Pad 39A. Landing is targeted for May 29 at 2:19 a.m. EDT. |
| Date |
05.19.2000 |
|
STS-101 Mission Specialist U
| Title |
STS-101 Mission Specialist Usachev during suitup in the O&C |
| Description |
STS-101 Mission Specialist Yury Usachev of Russia smiles and waves as he is helped with adjustments on his launch and entry suit. Usachev and the rest of the crew will be heading to Launch Pad 39A for the fourth attempt at launch of Space Shuttle Atlantis. The mission will take the crew to the International Space Station to deliver logistics and supplies and to prepare the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk and will reboost the space station from 230 statute miles to 250 statute miles. This will be the third assembly flight to the Space Station. Liftoff of Space Shuttle Atlantis for the 10-day mission is scheduled for about 6:11 a.m. EDT from Launch Pad 39A. Landing is targeted for May 29 at 2:19 a.m. EDT. |
| Date |
05.19.2000 |
|
STS-101 Space Shuttle Atlant
| Title |
STS-101 Space Shuttle Atlantis liftoff view from VAB |
| Description |
In this view of the launch from the roof of the Vehicle Assembly Building, the liftoff of Space Shuttle Atlantis challenges the early dawn. The light is reflected in waters all around the Launch Pad 39A while clouds of steam and smoke roll away from the pad. Liftoff occurred at 6:11:10 a.m. EDT. The mission is taking the crew of seven to the International Space Station to deliver logistics and supplies as well as to prepare the Station for the arrival of the Zvezda Service Module, expected to be launched by Russia in July 2000. Also, the crew will conduct one space walk and will reboost the space station from 230 statute miles to 250 statute miles. This will be the third assembly flight to the Space Station. After a 10-day mission, landing is targeted for May 29 at 2:19 a.m. EDT. This is the 98th Shuttle flight and the 21st flight for Shuttle Atlantis. |
| Date |
05.19.2000 |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
| General Description |
International Space Station Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
| General Description |
STS-106 Shuttle Mission Imagery |
|
|