Browse All : International Space Station (ISS) and Sun of Kennedy Space Center (KSC) from 2005

Printer Friendly
1-23 of 23
     
     
Photo Description The sun sets on the Space Shuttle Discovery during post-flight processing in the Mate-Demate Device (MDD), following its landing at NASA's Dryden Flight Research Center in California. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA?s modified Boeing 747 Shuttle Carrier Aircraft. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
Photo Date August 14, 2005
Photo Description The sun sets on the Space Shuttle Discovery during post-flight processing in the Mate-Demate Device (MDD), following its landing at NASA's Dryden Flight Research Center in California. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA?s modified Boeing 747 Shuttle Carrier Aircraft. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
Photo Date August 14, 2005
Photo Description The sun sets on the Space Shuttle Discovery during post-flight processing in the Mate-Demate Device (MDD), following its landing at NASA's Dryden Flight Research Center in California. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA?s modified Boeing 747 Shuttle Carrier Aircraft. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
Photo Date August 14, 2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, workers help prepare the Small Adapter Plate Assembly to receive the Control Moment Gyroscope (CMG), which will be delivered to the International Space Station (ISS) on Mission STS-114 aboard Space Shuttle Discovery to replace one that has failed. CMGs are critical to ISS operation, keeping the outpost properly oriented toward the Sun without the use of rocket fuel. Four CMGs are mounted inside a truss that extends upward from the Unity module?s zenith port. The Z1 truss, attached to the ISS during Mission STS-92 in October 2000, also carries the station?s main solar arrays. The launch window for Discovery is May 15 to June 3, 2005.
Release Date 03/11/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, workers remove the protective cover from the Control Moment Gyroscope (CMG), which will be delivered to the International Space Station on Mission STS-114 aboard Space Shuttle Discovery to replace one that has failed. CMGs are critical to ISS operation, keeping the outpost properly oriented toward the Sun without the use of rocket fuel. Four CMGs are mounted inside a truss that extends upward from the Unity module?s zenith port. The Z1 truss, attached to the ISS during Mission STS-92 in October 2000, also carries the station?s main solar arrays. The launch window for Discovery is May 15 to June 3, 2005.
Release Date 03/11/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, workers help guide the Control Moment Gyroscope (CMG) as a crane lowers it onto the Small Adapter Plate Assembly. The CMG will be delivered to the International Space Station on Mission STS-114 aboard Space Shuttle Discovery to replace one that has failed. CMGs are critical to ISS operation, keeping the outpost properly oriented toward the Sun without the use of rocket fuel. Four CMGs are mounted inside a truss that extends upward from the Unity module?s zenith port. The Z1 truss, attached to the ISS during Mission STS-92 in October 2000, also carries the station?s main solar arrays. The launch window for Discovery is May 15 to June 3, 2005.
Release Date 03/11/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, workers help guide the Control Moment Gyroscope (CMG) as a crane lowers it onto the Small Adapter Plate Assembly. The CMG will be delivered to the International Space Station on Mission STS-114 aboard Space Shuttle Discovery to replace one that has failed. CMGs are critical to ISS operation, keeping the outpost properly oriented toward the Sun without the use of rocket fuel. Four CMGs are mounted inside a truss that extends upward from the Unity module?s zenith port. The Z1 truss, attached to the ISS during Mission STS-92 in October 2000, also carries the station?s main solar arrays. The launch window for Discovery is May 15 to June 3, 2005.
Release Date 03/11/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, workers help as a crane lifts the Control Moment Gyroscope (CMG) out of its shipping container. The CMG will be delivered to the International Space Station on Mission STS-114 aboard Space Shuttle Discovery to replace one that has failed. CMGs are critical to ISS operation, keeping the outpost properly oriented toward the Sun without the use of rocket fuel. Four CMGs are mounted inside a truss that extends upward from the Unity module?s zenith port. The Z1 truss, attached to the ISS during Mission STS-92 in October 2000, also carries the station?s main solar arrays. The launch window for Discovery is May 15 to June 3, 2005.
Release Date 03/11/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Members of the Space Shuttle Discovery?s Return to Flight STS-114 crew are conducting a payload Crew Equipment Interface Test (CEIT) in the Space Station Processing Facility at NASA?s Kennedy Space Center, Fla. Seen here looking at tile samples are Mission Specialists Stephen Robinson (left) and Soichi Noguchi (right), who is with the Japanese Aerospace Exploration Agency. The launch window for STS-114 is May 15 to June 3, 2005. During CEIT, the crew is inspecting the resupply stowage racks installed in the Italian-built Multi-Purpose Logistics Module Raffaello and performing tool and equipment interface checks with the Thermal Protection System (TPS) repair sample box, the Control Moment Gyroscope (CMG) and the External Stowage Platform-2 in preparation for the mission?s three scheduled spacewalks. The seven-member crew will fly to the International Space Station primarily to evaluate procedures for flight safety, including Shuttle inspection and repair techniques. The TPS repair sample box contains tile samples for the Detailed Test Objective (DTO) that will enable the crew to test new on-orbit TPS repair techniques. The CMG installed on the Lightweight Multi-Purpose Experiment Support Structure Carrier (LMC) is a replacement for an inoperable CMG on the International Space Station. The CMGs provide altitude control for the outpost keeping it properly oriented toward the Sun without use of rocket fuel. The ESP2 will carry replacement parts, known as orbital replacement units (ORU) to the Station. The platform will be deployed and attached to the Station?s airlock and will be used as a permanent spare parts facility.
Release Date 03/18/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Members of the Space Shuttle Discovery?s Return to Flight STS-114 crew are conducting a payload Crew Equipment Interface Test (CEIT) in the Space Station Processing Facility at NASA?s Kennedy Space Center, Fla. Seen here are Mission Specialists Stephen Robinson (left) and Andrew Thomas. The launch window for STS-114 is May 15 to June 3, 2005. During CEIT, the crew is inspecting the resupply stowage racks installed in the Italian-built Multi-Purpose Logistics Module Raffaello and performing tool and equipment interface checks with the Thermal Protection System (TPS) repair sample box, the Control Moment Gyroscope (CMG) and the External Stowage Platform-2 in preparation for the mission?s three scheduled spacewalks. The seven-member crew will fly to the International Space Station primarily to evaluate procedures for flight safety, including Shuttle inspection and repair techniques. The TPS repair sample box contains tile samples for the Detailed Test Objective (DTO) that will enable the crew to test new on-orbit TPS repair techniques. The CMG installed on the Lightweight Multi-Purpose Experiment Support Structure Carrier (LMC) is a replacement for an inoperable CMG on the International Space Station. The CMGs provide altitude control for the outpost keeping it properly oriented toward the Sun without use of rocket fuel. The ESP2 will carry replacement parts, known as orbital replacement units (ORU) to the Station. The platform will be deployed and attached to the Station?s airlock and will be used as a permanent spare parts facility.
Release Date 03/18/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Members of the Space Shuttle Discovery?s Return to Flight STS-114 crew are conducting a payload Crew Equipment Interface Test (CEIT) in the Space Station Processing Facility at NASA?s Kennedy Space Center, Fla. Seen here are Commander Eileen Collins (left) and Mission Specialist Soichi Noguchi (right), who is with the Japanese Aerospace Exploration Agency. The launch window for STS-114 is May 15 to June 3, 2005. During CEIT, the crew is inspecting the resupply stowage racks installed in the Italian-built Multi-Purpose Logistics Module Raffaello and performing tool and equipment interface checks with the Thermal Protection System (TPS) repair sample box, the Control Moment Gyroscope (CMG) and the External Stowage Platform-2 in preparation for the mission?s three scheduled spacewalks. The seven-member crew will fly to the International Space Station primarily to evaluate procedures for flight safety, including Shuttle inspection and repair techniques. The TPS repair sample box contains tile samples for the Detailed Test Objective (DTO) that will enable the crew to test new on-orbit TPS repair techniques. The CMG installed on the Lightweight Multi-Purpose Experiment Support Structure Carrier (LMC) is a replacement for an inoperable CMG on the International Space Station. The CMGs provide altitude control for the outpost keeping it properly oriented toward the Sun without use of rocket fuel. The ESP2 will carry replacement parts, known as orbital replacement units (ORU) to the Station. The platform will be deployed and attached to the Station?s airlock and will be used as a permanent spare parts facility.
Release Date 03/18/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Members of the Space Shuttle Discovery?s Return to Flight STS-114 crew are conducting a payload Crew Equipment Interface Test (CEIT) in the Space Station Processing Facility at NASA?s Kennedy Space Center, Fla. Seen here inside the Multi-Purpose Logistics Module Raffaello are Mission Specialists Wendy Lawrence (left) and Soichi Noguchi (right), who is with the Japanese Aerospace Exploration Agency. The launch window for STS-114 is May 15 to June 3, 2005. During CEIT, the crew is inspecting the resupply stowage racks installed in the Italian-built Multi-Purpose Logistics Module Raffaello and performing tool and equipment interface checks with the Thermal Protection System (TPS) repair sample box, the Control Moment Gyroscope (CMG) and the External Stowage Platform-2 in preparation for the mission?s three scheduled spacewalks. The seven-member crew will fly to the International Space Station primarily to evaluate procedures for flight safety, including Shuttle inspection and repair techniques. The TPS repair sample box contains tile samples for the Detailed Test Objective (DTO) that will enable the crew to test new on-orbit TPS repair techniques. The CMG installed on the Lightweight Multi-Purpose Experiment Support Structure Carrier (LMC) is a replacement for an inoperable CMG on the International Space Station. The CMGs provide altitude control for the outpost keeping it properly oriented toward the Sun without use of rocket fuel. The ESP2 will carry replacement parts, known as orbital replacement units (ORU) to the Station. The platform will be deployed and attached to the Station?s airlock and will be used as a permanent spare parts facility.
Release Date 03/18/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Members of the Space Shuttle Discovery?s Return to Flight STS-114 crew are conducting a payload Crew Equipment Interface Test (CEIT) in the Space Station Processing Facility at NASA?s Kennedy Space Center, Fla. Seen here in the Multi-Purpose Logistics Module Raffaello is Mission Specialist Wendy Lawrence. The launch window for STS-114 is May 15 to June 3, 2005. During CEIT, the crew is inspecting the resupply stowage racks installed in the Italian-built Multi-Purpose Logistics Module Raffaello and performing tool and equipment interface checks with the Thermal Protection System (TPS) repair sample box, the Control Moment Gyroscope (CMG) and the External Stowage Platform-2 in preparation for the mission?s three scheduled spacewalks. The seven-member crew will fly to the International Space Station primarily to evaluate procedures for flight safety, including Shuttle inspection and repair techniques. The TPS repair sample box contains tile samples for the Detailed Test Objective (DTO) that will enable the crew to test new on-orbit TPS repair techniques. The CMG installed on the Lightweight Multi-Purpose Experiment Support Structure Carrier (LMC) is a replacement for an inoperable CMG on the International Space Station. The CMGs provide altitude control for the outpost keeping it properly oriented toward the Sun without use of rocket fuel. The ESP2 will carry replacement parts, known as orbital replacement units (ORU) to the Station. The platform will be deployed and attached to the Station?s airlock and will be used as a permanent spare parts facility.
Release Date 03/18/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Members of the Space Shuttle Discovery?s Return to Flight STS-114 crew are conducting a payload Crew Equipment Interface Test (CEIT) in the Space Station Processing Facility at NASA?s Kennedy Space Center, Fla. Seen here is Mission Specialist Soichi Noguchi, who is with the Japanese Aerospace Exploration Agency. The launch window for STS-114 is May 15 to June 3, 2005. During CEIT, the crew is inspecting the resupply stowage racks installed in the Italian-built Multi-Purpose Logistics Module Raffaello and performing tool and equipment interface checks with the Thermal Protection System (TPS) repair sample box, the Control Moment Gyroscope (CMG) and the External Stowage Platform-2 in preparation for the mission?s three scheduled spacewalks. The seven-member crew will fly to the International Space Station primarily to evaluate procedures for flight safety, including Shuttle inspection and repair techniques. The TPS repair sample box contains tile samples for the Detailed Test Objective (DTO) that will enable the crew to test new on-orbit TPS repair techniques. The CMG installed on the Lightweight Multi-Purpose Experiment Support Structure Carrier (LMC) is a replacement for an inoperable CMG on the International Space Station. The CMGs provide altitude control for the outpost keeping it properly oriented toward the Sun without use of rocket fuel. The ESP2 will carry replacement parts, known as orbital replacement units (ORU) to the Station. The platform will be deployed and attached to the Station?s airlock and will be used as a permanent spare parts facility.
Release Date 03/18/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Members of the Space Shuttle Discovery?s Return to Flight STS-114 crew are conducting a payload Crew Equipment Interface Test (CEIT) in the Space Station Processing Facility at NASA?s Kennedy Space Center, Fla. Seen here is Mission Specialist Andrew Thomas, looking at the Control Moment Gyroscope, part of the mission payload. The launch window for STS-114 is May 15 to June 3, 2005. During CEIT, the crew is inspecting the resupply stowage racks installed in the Italian-built Multi-Purpose Logistics Module Raffaello and performing tool and equipment interface checks with the Thermal Protection System (TPS) repair sample box, the Control Moment Gyroscope (CMG) and the External Stowage Platform-2 in preparation for the mission?s three scheduled spacewalks. The seven-member crew will fly to the International Space Station primarily to evaluate procedures for flight safety, including Shuttle inspection and repair techniques. The TPS repair sample box contains tile samples for the Detailed Test Objective (DTO) that will enable the crew to test new on-orbit TPS repair techniques. The CMG installed on the Lightweight Multi-Purpose Experiment Support Structure Carrier (LMC) is a replacement for an inoperable CMG on the International Space Station. The CMGs provide altitude control for the outpost keeping it properly oriented toward the Sun without use of rocket fuel. The ESP2 will carry replacement parts, known as orbital replacement units (ORU) to the Station. The platform will be deployed and attached to the Station?s airlock and will be used as a permanent spare parts facility.
Release Date 03/18/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The orange glow of the setting sun paints a silhouette of Space Shuttle Discovery (on the right) as it rolls out to Launch Pad 39B at NASA?s Kennedy Space Center. The Shuttle began rollout to the pad at 2:04 p.m. EDT from the Vehicle Assembly Building at NASA?s Kennedy Space Center, marking a major milestone in the Space Shuttle Program?s Return to Flight. Launch of Discovery on its Return to Flight mission, STS-114, is targeted for May 15 with a launch window that extends to June 3. During its 12-day mission, Discovery?s seven-person crew will test new hardware and techniques to improve Shuttle safety, as well as deliver supplies to the International Space Station.
Release Date 04/06/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Space Shuttle Discovery makes its way along the crawlerway from high bay 3 to Launch Pad 39B as the sun rises. First motion for the 4-mile, 6-hour journey was at 1:58 a.m. EDT. The Space Shuttle rests on a Mobile Launcher Platform which sits atop a Crawler-Transporter. This is the second rollout of Discovery after being returned to the Vehicle Assembly Building for connection to an improved External Tank. Launch of Discovery on its Return to Flight mission STS-114 is targeted for a launch window extending from July 13 to July 31. During its 12-day mission, Discovery?s seven-person crew will test new hardware and techniques to improve Shuttle safety, as well as deliver supplies to the International Space Station.
Release Date 06/15/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Space Shuttle Discovery makes its way along the crawlerway from high bay 3 to Launch Pad 39B as the sun rises. First motion for the 4-mile, 6-hour journey was at 1:58 a.m. EDT. The Space Shuttle rests on a Mobile Launcher Platform which sits atop a Crawler-Transporter. This is the second rollout of Discovery after being returned to the Vehicle Assembly Building for connection to an improved External Tank. Launch of Discovery on its Return to Flight mission STS-114 is targeted for a launch window extending from July 13 to July 31. During its 12-day mission, Discovery?s seven-person crew will test new hardware and techniques to improve Shuttle safety, as well as deliver supplies to the International Space Station.
Release Date 06/15/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Space Shuttle Discovery makes its way along the crawlerway from high bay 3 to Launch Pad 39B as the sun rises. First motion for the 4-mile, 6-hour journey was at 1:58 a.m. EDT. The Space Shuttle rests on a Mobile Launcher Platform which sits atop a Crawler-Transporter. This is the second rollout of Discovery after being returned to the Vehicle Assembly Building for connection to an improved External Tank. Launch of Discovery on its Return to Flight mission STS-114 is targeted for a launch window extending from July 13 to July 31. During its 12-day mission, Discovery?s seven-person crew will test new hardware and techniques to improve Shuttle safety, as well as deliver supplies to the International Space Station.
Release Date 06/15/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Space Shuttle Discovery makes its way along the crawlerway from high bay 3 to Launch Pad 39B as the sun rises. First motion for the 4-mile, 6-hour journey was at 1:58 a.m. EDT. The Space Shuttle rests on a Mobile Launcher Platform which sits atop a Crawler-Transporter. This is the second rollout of Discovery after being returned to the Vehicle Assembly Building for connection to an improved External Tank. Launch of Discovery on its Return to Flight mission STS-114 is targeted for a launch window extending from July 13 to July 31. During its 12-day mission, Discovery?s seven-person crew will test new hardware and techniques to improve Shuttle safety, as well as deliver supplies to the International Space Station.
Release Date 06/15/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Space Shuttle Discovery makes its way along the crawlerway from high bay 3 to Launch Pad 39B as the sun rises. First motion for the 4-mile, 6-hour journey was at 1:58 a.m. EDT. The Space Shuttle rests on a Mobile Launcher Platform which sits atop a Crawler-Transporter. This is the second rollout of Discovery after being returned to the Vehicle Assembly Building for connection to an improved External Tank. Launch of Discovery on its Return to Flight mission STS-114 is targeted for a launch window extending from July 13 to July 31. During its 12-day mission, Discovery?s seven-person crew will test new hardware and techniques to improve Shuttle safety, as well as deliver supplies to the International Space Station.
Release Date 06/15/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - Space Shuttle Discovery makes its way along the crawlerway from high bay 3 to Launch Pad 39B as the sun rises. First motion for the 4-mile, 6-hour journey was at 1:58 a.m. EDT. The Space Shuttle rests on a Mobile Launcher Platform which sits atop a Crawler-Transporter. This is the second rollout of Discovery after being returned to the Vehicle Assembly Building for connection to an improved External Tank. Launch of Discovery on its Return to Flight mission STS-114 is targeted for a launch window extending from July 13 to July 31. During its 12-day mission, Discovery?s seven-person crew will test new hardware and techniques to improve Shuttle safety, as well as deliver supplies to the International Space Station.
Release Date 06/15/2005
KENNEDY SPACE CENTER, FLA. - …
Description KENNEDY SPACE CENTER, FLA. - The sun is setting behind the tail of the Shuttle Carrier Aircraft, a modified Boeing 747, and orbiter Discovery where they are parked in the mate/demate device. Discovery was returned to Kennedy Space Center on a ferry flight from Edwards Air Force Base in California, where it landed Aug. 9 after 13 days in space on mission STS-114. In the mate/demate device, a horizontal structure mounted at the 80-foot level between two towers controls and guides a large lift beam that attaches to the orbiter to raise and lower it. Once Discovery is lifted off the back of the SCA, the 747 can then roll away and the orbiter will be lowered to the ground. It will then be towed from the SLF to the Orbiter Processing Facility. Once inside the OPF, the payload bay doors will be opened and the MPLM Raffaello brought back from the International Space Station will be unloaded and transferred to the Space Station Processing Facility. This concludes mission STS-114.
Release Date 08/21/2005
1-23 of 23