Browse All : International Space Station (ISS) and Earth and Zvezda of Washington, D.C.

Printer Friendly
1-14 of 14
     
     
STS-116 Launch
Name of Image STS-116 Launch
Date of Image 2006-12-09
Full Description Against a black night sky, the Space Shuttle Discovery and its seven-member crew head toward Earth-orbit and a scheduled linkup with the International Space Station (ISS). Liftoff from the Kennedy Space Center's launch pad 39B occurred at 8:47 p.m. (EST) on Dec. 9, 2006 in what was the first evening shuttle launch since 2002. The primary mission objective was to deliver and install the P5 truss element. The P5 installation was conducted during the first of three space walks, and involved use of both the shuttle and station?s robotic arms. The remainder of the mission included a major reconfiguration and activation of the ISS electrical and thermal control systems, as well as delivery of Zvezda Service Module debris panels, which will increase ISS protection from potential impacts of micro-meteorites and orbital debris. Two major payloads developed at the Marshall Space Flight Center (MSFC) were also delivered to the Station. The Lab-On-A Chip Application Development Portable Test System (LOCAD-PTS) and the Water Delivery System, a vital component of the Station?s Oxygen Generation System.
STS-116 Launch
Name of Image STS-116 Launch
Date of Image 2006-12-09
Full Description Against a black night sky, the Space Shuttle Discovery and its seven-member crew head toward Earth-orbit and a scheduled linkup with the International Space Station (ISS). Liftoff from the Kennedy Space Center's launch pad 39B occurred at 8:47 p.m. (EST) on Dec. 9, 2006 in what was the first evening shuttle launch since 2002. The primary mission objective was to deliver and install the P5 truss element. The P5 installation was conducted during the first of three space walks, and involved use of both the shuttle and station?s robotic arms. The remainder of the mission included a major reconfiguration and activation of the ISS electrical and thermal control systems, as well as delivery of Zvezda Service Module debris panels, which will increase ISS protection from potential impacts of micro-meteorites and orbital debris. Two major payloads developed at the Marshall Space Flight Center (MSFC) were also delivered to the Station. The Lab-On-A Chip Application Development Portable Test System (LOCAD-PTS) and the Water Delivery System, a vital component of the Station?s Oxygen Generation System.
STS-116 Launch
Name of Image STS-116 Launch
Date of Image 2006-12-09
Full Description Against a black night sky, the Space Shuttle Discovery and its seven-member crew head toward Earth-orbit and a scheduled linkup with the International Space Station (ISS). Liftoff from the Kennedy Space Center's launch pad 39B occurred at 8:47 p.m. (EST) on Dec. 9, 2006 in what was the first evening shuttle launch since 2002. The primary mission objective was to deliver and install the P5 truss element. The P5 installation was conducted during the first of three space walks, and involved use of both the shuttle and station?s robotic arms. The remainder of the mission included a major reconfiguration and activation of the ISS electrical and thermal control systems, as well as delivery of Zvezda Service Module debris panels, which will increase ISS protection from potential impacts of micro-meteorites and orbital debris. Two major payloads developed at the Marshall Space Flight Center (MSFC) were also delivered to the Station. The Lab-On-A Chip Application Development Portable Test System (LOCAD-PTS) and the Water Delivery System, a vital component of the Station?s Oxygen Generation System.
Approaching the Internationa …
Title Approaching the International Space Station
Explanation Last Monday the crew of Space Shuttle Atlantis [ http://www.ksc.nasa.gov/shuttle/resources/orbiters/atlantis.html ] took in this view [ http://spaceflight.nasa.gov/gallery/images/shuttle/sts-106/html/s106e5056.html ] as they approached the developing International Space Station [ http://spaceflight.nasa.gov/station/reference/faq/index.html ] (ISS). From top to bottom, the astronauts saw a station currently consisting of the Progress supply module, the Zvezda service module [ http://www.shuttlepresskit.com/ISS_OVR/assembly2_overview.htm ], the Zarya cargo module [ http://www.shuttlepresskit.com/ISS_OVR/element1.htm ], and the Unity connecting module [ http://www.shuttlepresskit.com/ISS_OVR/element2.htm ]. Never before had astronauts seen the station since the remote-controlled additions of Progress [ http://www.space.com/missionlaunches/launches/progress_prelaunch_000805.html ] and Zvezda [ http://antwrp.gsfc.nasa.gov/apod/ap000718.html ]. Energy collecting flat solar panels [ http://www.qrg.nwu.edu/projects/vss/docs/Power/1-what-are-solar-panels.html ] can be seen extending from some of the modules. Soon after this picture was taken, Atlantis docked with the ISS [ http://www.shuttlepresskit.com/ISS_OVR/ ] at the Unity [ http://spaceflight.nasa.gov/gallery/images/shuttle/sts-106/html/s106e5061.html ] end. The astronauts have worked hard [ http://www.shuttlepresskit.com/STS-106/index.htm ] unloading supplies, installing and testing equipment, and even planning to reboost the floating space station [ http://antwrp.gsfc.nasa.gov/apod/ap990223.html ] to a higher orbit. The Shuttle and its entire crew are scheduled to return to Earth Wednesday. The Space Shuttle Discovery [ http://www.ksc.nasa.gov/shuttle/resources/orbiters/discovery.html ] is then scheduled to visit [ http://spaceflight.nasa.gov/shuttle/archives/sts-92/index.html ] the ISS in two weeks.
General Description International Space Station Imagery
General Description International Space Station Imagery
General Description International Space Station Imagery
General Description International Space Station Imagery
General Description International Space Station Imagery
General Description International Space Station Imagery
General Description International Space Station Imagery
General Description STS-116 Shuttle Mission Imagery
General Description STS-116 Shuttle Mission Imagery
General Description STS-116 Shuttle Mission Imagery
1-14 of 14