|
|
Browse All
:
Columbia of Kennedy Space Center (KSC) from 2002 and July 19, 2002
|
Printer Friendly |
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, the SHI Research Double Module (SHI/RDM) and Hitchhiker Carrier behind it are suspended by an overhead crane during their move to Columbia's payload bay. SHI/RDM is the primary payload of the STS-107 research mission, with experiments ranging from material sciences to life sciences (many rats). Also, the Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR) that is on the Hitchhiker Carrier incorporates eight high priority secondary attached shuttle experiments. STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
05/23/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - Workers in the Orbiter Processing Facility keep watch as the SHI Research Double Module (SHI/RDM) (right) and Hitchhiker Carrier (left) are lowered into Columbia's payload bay for mission STS-107, a research mission. SHI/RDM is the primary payload, with experiments ranging from material sciences to life sciences (many rats). Also, the Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR) that is on the Hitchhiker Carrier incorporates eight high priority secondary attached shuttle experiments. STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
05/23/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- The SHI Research Double Module (SHI/RDM) (right) and Hitchhiker Carrier (left) are lowered toward Columbia's payload bay. The two payloads will be installed in the payload bay for mission STS-107, a research mission. SHI/RDM is the primary payload, with experiments ranging from material sciences to life sciences (many rats). Also, the Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR) that is on the Hitchhiker Carrier incorporates eight high priority secondary attached shuttle experiments. STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
05/23/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- The SHI Research Double Module (SHI/RDM) (right) and Hitchhiker Carrier (left) are lowered toward Columbia's payload bay. The two payloads will be installed in the payload bay for mission STS-107, a research mission. SHI/RDM is the primary payload, with experiments ranging from material sciences to life sciences (many rats). Also, the Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR) that is on the Hitchhiker Carrier incorporates eight high priority secondary attached shuttle experiments. STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
05/23/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, an overhead crane is attached to the SHI Research Double Module (SHI/RDM) (right) and Hitchhiker Carrier (left) to lift them out of the payload canister. They will be installed in Columbia's payload bay. SHI/RDM is the primary payload of the STS-107 research mission, with experiments ranging from material sciences to life sciences (many rats). Also, the Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR) that is on the Hitchhiker Carrier incorporates eight high priority secondary attached shuttle experiments. STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
05/23/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, the Hitchhiker Carrier (front) and the SHI Research Double Module (SHI/RDM) behind it are suspended over Columbia's payload bay. The two payloads will be installed in the payload bay for mission STS-107, a research mission. SHI/RDM is the primary payload, with experiments ranging from material sciences to life sciences (many rats). Also, the Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR) that is on the Hitchhiker Carrier incorporates eight high priority secondary attached shuttle experiments. STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
05/23/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- The SHI Research Double Module (SHI/RDM) (right) and Hitchhiker Carrier (left) are ready to be lowered into Columbia's payload bay. The two payloads will be installed in the payload bay for mission STS-107, a research mission. SHI/RDM is the primary payload, with experiments ranging from material sciences to life sciences (many rats). Also, the Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR) that is on the Hitchhiker Carrier incorporates eight high priority secondary attached shuttle experiments. STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
05/23/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- The SHI Research Double Module (SHI/RDM) (left) and Hitchhiker Carrier (right) are lowered toward Columbia's payload bay. The two payloads will be installed in the payload bay for mission STS-107, a research mission. SHI/RDM is the primary payload, with experiments ranging from material sciences to life sciences (many rats). Also, the Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR) that is on the Hitchhiker Carrier incorporates eight high priority secondary attached shuttle experiments. STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
05/23/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- Processing for mission STS-107 continues in the Operations and Checkout Building as the tunnel that will connect Space Shuttle Columbia's crew compartment to the SPACEHAB module is moved into a transportation canister. A research mission, the primary payload of STS-107 is the SHI Research Double Module (SHI/RDM) or SPACEHAB, making its first flight. The experiments on board will range from material sciences to life sciences (many rats). STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
05/10/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - In the Multi-Payload Processing Facility, the Hitchhiker Bridge with GetAway Special canisters (GAS cans) are ready for transfer to the payload canister. The bridge is a carrier for the Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR) that incorporates eight high priority secondary attached shuttle experiments on mission STS-107. The bridge will be installed in Columbia's payload bay. A research mission, STS-107 will also carry the SHI Research Double Module (SHI/RDM), known as SPACEHAB. Experiments on the module range from material sciences to life sciences (many rats). STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
05/14/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- In the Multi-Payload Processing Facility, an overhead crane is attached to the Hitchhiker Bridge with GetAway Special canisters (GAS cans). The bridge, a carrier for the Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR) that incorporates eight high priority secondary attached shuttle experiments, is being transferred to the payload canister. The bridge will be installed in Columbia's payload bay as part of mission STS-107. A research mission, STS-107 will also carry the SHI Research Double Module (SHI/RDM), known as SPACEHAB. Experiments on the module range from material sciences to life sciences (many rats). STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
05/14/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- Processing for mission STS-107 continues in the Operations and Checkout Building as the tunnel that will connect Space Shuttle Columbia's crew compartment to the SPACEHAB module is moved into a transportation canister. A research mission, the primary payload of STS-107 is the SHI Research Double Module (SHI/RDM) or SPACEHAB, making its first flight. The experiments on board will range from material sciences to life sciences (many rats). STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
05/10/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- Processing for mission STS-107 continues in the Operations and Checkout Building as the tunnel that will connect Space Shuttle Columbia's crew compartment to the SPACEHAB module is moved into a transportation canister. A research mission, the primary payload of STS-107 is the SHI Research Double Module (SHI/RDM) or SPACEHAB, making its first flight. The experiments on board will range from material sciences to life sciences (many rats). STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
05/10/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- Processing for mission STS-107 continues in the Operations and Checkout Building as the tunnel that will connect Space Shuttle Columbia's crew compartment to the SPACEHAB module is moved into a transportation canister. A research mission, the primary payload of STS-107 is the SHI Research Double Module (SHI/RDM) or SPACEHAB, making its first flight. The experiments on board will range from material sciences to life sciences (many rats). STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
05/10/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- The Hitchhiker Bridge with GetAway Special canisters (GAS cans) is placed into the payload canister. The bridge, a carrier for the Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR) that incorporates eight high priority secondary attached shuttle experiments, is being transferred to the payload canister below it. The bridge will be installed in Columbia's payload bay as part of mission STS-107. A research mission, STS-107 will also carry the SHI Research Double Module (SHI/RDM), known as SPACEHAB. Experiments on the module range from material sciences to life sciences (many rats). STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
05/14/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - An overhead crane lowers the Hitchhiker Bridge with GetAway Special canisters (GAS cans) into the payload canister below. The bridge, a carrier for the Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR) that incorporates eight high priority secondary attached shuttle experiments, is being transferred to the payload canister below it. The bridge will be installed in Columbia's payload bay as part of mission STS-107. A research mission, STS-107 will also carry the SHI Research Double Module (SHI/RDM), known as SPACEHAB. Experiments on the module range from material sciences to life sciences (many rats). STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
05/14/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - Workers in the Multi-Payload Processing Facility watch the progress of the overhead crane carrying the Hitchhiker Bridge with GetAway Special canisters (GAS cans). The bridge, a carrier for the Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR) that incorporates eight high priority secondary attached shuttle experiments, is being transferred to the payload canister below it. The bridge will be installed in Columbia's payload bay as part of mission STS-107. A research mission, STS-107 will also carry the SHI Research Double Module (SHI/RDM), known as SPACEHAB. Experiments on the module range from material sciences to life sciences (many rats). STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
05/14/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, the overhead crane lifts the SHI Research Double Module (SHI/RDM) from its workstand. The module is being transferred to the payload canister for transport to the Orbiter Processing Facility where it will be installed in Columbia's payload bay for mission STS-107. SHI/RDM is the primary payload of the research mission, with experiments ranging from material sciences to life sciences (many rats). Also part of the payload is the Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR) that incorporates eight high priority secondary attached shuttle experiments. STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
05/16/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, the overhead crane lowers the SHI Research Double Module (SHI/RDM) into the payload canister. The canister will transport it to the Orbiter Processing Facility where it will be installed in Columbia's payload bay for mission STS-107. SHI/RDM is the primary payload of the research mission, with experiments ranging from material sciences to life sciences (many rats). Also part of the payload is the Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR) that incorporates eight high priority secondary attached shuttle experiments. STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
05/16/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - Suspended from the overhead crane, the SHI Research Double Module (SHI/RDM) travels across the Space Station Processing Facility to the payload canister waiting at right. The module will be placed in the canister for transport to the Orbiter Processing Facility where it will be installed in Columbia's payload bay for mission STS-107. SHI/RDM is the primary payload of the research mission, with experiments ranging from material sciences to life sciences (many rats). Also part of the payload is the Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR) that incorporates eight high priority secondary attached shuttle experiments. STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
05/16/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - Workers in the Space Station Processing Facility attach the overhead crane to the SHI Research Double Module (SHI/RDM) to lift it off the workstand. The module is being transferred to the payload canister for transport to the Orbiter Processing Facility where it will be installed in Columbia's payload bay for mission STS-107. SHI/RDM is the primary payload of the research mission, with experiments ranging from material sciences to life sciences (many rats). Also part of the payload is the Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR) that incorporates eight high priority secondary attached shuttle experiments. STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
05/16/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test activities, STS-107 Payload Commander Michael Anderson looks over equipment in the payload bay of Columbia. Behind him is Mission Specialist David Brown. STS-107 is a research mission, with the SHI Research Double Module (SHI/RDM), also known as SPACEHAB, as the primary payload, plus the Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR) that incorporates eight high priority secondary attached shuttle experiments. STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
06/08/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - During Crew Equipment Interface Test activities, STS-107 Mission Specialist David Brown checks equipment in the payload bay of Columbia while a technician looks on. Behind Brown is Payload Commander Michael Anderson. STS-107 is a research mission, with the SHI Research Double Module (SHI/RDM), also known as SPACEHAB, as the primary payload, plus the Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR) that incorporates eight high priority secondary attached shuttle experiments. STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
06/08/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - STS-107 Pilot William "Willie" McCool checks the window in Columbia during Crew Equipment Interface Test activities at KSC. The CEIT includes equipment and payload familiarization. STS-107 is a research mission, with the SHI Research Double Module (SHI/RDM), also known as SPACEHAB, as the primary payload, plus the Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR) that incorporates eight high priority secondary attached shuttle experiments. STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
06/08/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. - STS-107 Commander Rick Husband checks the window in Columbia during Crew Equipment Interface Test activities at KSC. The CEIT includes equipment and payload familiarization. STS-107 is a research mission, with the SHI Research Double Module (SHI/RDM), also known as SPACEHAB, as the primary payload, plus the Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR) that incorporates eight high priority secondary attached shuttle experiments. STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
06/08/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- During Crew Equipment Interface Test activities, STS-107 Payload Commander Michael Anderson looks over equipment from a lift in the payload bay of Columbia while technicians (right and rear) look on. Behind Anderson is Mission Specialist David Brown. STS-107 is a research mission, with the SHI Research Double Module (SHI/RDM), also known as SPACEHAB, as the primary payload, plus the Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR) that incorporates eight high priority secondary attached shuttle experiments. STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
06/08/2002 |
|
KENNEDY SPACE CENTER, FLA. -
| Description |
KENNEDY SPACE CENTER, FLA. -- - During Crew Equipment Interface Test activities, STS-107 Mission Specialist David Brown checks equipment in the payload bay of Columbia. At left is Payload Commander Michael Anderson. A technician holds a camera. STS-107 is a research mission, with the SHI Research Double Module (SHI/RDM), also known as SPACEHAB, as the primary payload, plus the Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR) that incorporates eight high priority secondary attached shuttle experiments. STS-107 is scheduled to launch July 19, 2002 |
| Release Date |
06/08/2002 |
|
|