Browse All : Agena of Johnson Space Center (JSC) and Washington, D.C.

Printer Friendly
1-2 of 2
     
     
Gemini 11 maintenance
Title Gemini 11 maintenance
Full Description The Gemini 11 spacecraft is lowered onto a dolly for preflight maintenance before stacking on the Titan rocket at the Kennedy Space Center. Dick Gordon and Pete Conrad would liftoff in this spacecraft on September 12, 1966 for a mission lasting almost three days. The crew practiced docking with the Agena unmanned docking craft, and Gordon also performed two spacewalks during the mission.
Date 07/21/1966
NASA Center Johnson Space Center
Gemini with Agena on Earth
Title Gemini with Agena on Earth
Full Description Gemini 6 spacecraft (right) and Agena Target Vehicle (left) on the Boresight Range Tower for at the Kennedy Space Center to test the two spacecrafts? docking capability. Agena was designed to launch separately from Gemini and act as a target for astronauts in a Gemini spacecraft to rendezvous with. Gemini 6 was slated to be the first mission to dock with Agena, but a malfunction with the unmanned target resulted in new objectives for Gemini 6 calling for a one day rendezvous with Gemini 7 in December, 1965.
Date 1965
NASA Center Johnson Space Center
1-2 of 2