Browse All : Agena of Johnson Space Center (JSC) and Florida

Printer Friendly
1-3 of 3
     
     
Gemini Augmented Target Dock …
Title Gemini Augmented Target Docking Adapter during pre-flight checkout
Description The Gemini Augmented Target Docking Adapter (ATDA) during pre-flight checkout in the Kennedy Space Center's Cryogenic Building. The ATDA is being used because the Agena Target Vehicle failed to achieve orbit on May 17th, 1966, causing the postponement of the Gemini 9 mission. The mission (renamed Gemini 9-A) has been rescheduled for May 31st.
Date Taken 1966-05-19
Agena Target Vehicle atop At …
Title Agena Target Vehicle atop Atlas Launch vehicle launched from KSC
Description An Agena Target Vehicle atop its Atlas Launch vehicle is launched from the Kennedy Space Center (KSC) Launch Complex 14 at 10:15 am.m., May 17, 1966. The Agena was intended as a rendezvous and docking vehicle for the Gemini 9 spacecraft. However, since the Agena failed to achieve orbit, the Gemini 9 mission was postponed.
Date Taken 1966-05-17
Momument at Pad 14 honoring …
Title Momument at Pad 14 honoring Project Mercury
Description Momument at Pad 14 honoring Project Mercury. The Arabic number 7 represents the seven original astronauts. The other figure is the astronomical symbol of the Planet Mercury. In background is the Gemini 12 Agena Target Docking Vehicle atop its Atlas launch vehicle at Cape Kennedy, Florida.
Date Taken 1966-11-09
1-3 of 3