Media Information

 
 
 
Collection:
NASA Great Images in Nasa Collection
Title:
STS-67 Rollout
Full Description:
A massive 19 million pounds (8.6 million kilograms) of Space Shuttle, support and transport hardware, inch toward Launch Pad 39A from the Vehicle Assembly Building. The fully assembled Space Shuttle Endeavour, minus its payloads, weighs about 4.5 million pounds (2 million kg.); the mobile launch platform on which it was stacked and from which it will lift off weighs 9.25 million pounds (4.19 million kg.) and the crawler-transporter carrying the platform and Shuttle checks in at around 6 million pounds (2.7 million kg.). Once at the pad, the Shuttle and launch platform will be positioned atop support columns to complete preparations for the second Shuttle launch of 1995. Primary payload of Mission STS-67 is the Astro-2 astrophysics observatory, carrying three ultraviolet telescopes that flew on the Astro-1 mission in 1990. STS-67 also is scheduled to become the longest Shuttle flight to date, lasting 16 days.
Date:
2/8/1995
NASA Center:
Kennedy Space Center
Subject Category:
Space Shuttle
Keywords:
Space
Keywords:
Shuttle
Keywords:
Assembly
Keywords:
Vehicle
Keywords:
Building
Keywords:
VAB
Keywords:
Rollout
Keywords:
Crawler
Keywords:
Endeavour
Keywords:
STS-67
Audience:
General Public
facet_what:
Space Shuttle Endeavour
facet_what:
Space Shuttle Orbiter
facet_where:
Kennedy Space Center (KSC)
facet_when:
1995
facet_when:
1990
facet_when:
2-8-1995
facet_when_year:
1995
facet_when_year:
1990
Image #:
95PC-0285
original_url:
UID:
SPD-GRIN-GPN-2000-00 0775
Center:
KSC
Center Number:
95PC-0285
GRIN DataBase Number:
GPN-2000-000775
Creator-Photographer:
NASA
Original Source:
DIGITAL

STS-67 Rollout